Docsity
Docsity

Prepare-se para as provas
Prepare-se para as provas

Estude fácil! Tem muito documento disponível na Docsity


Ganhe pontos para baixar
Ganhe pontos para baixar

Ganhe pontos ajudando outros esrudantes ou compre um plano Premium


Guias e Dicas
Guias e Dicas

Check-List Data Centers, Manuais, Projetos, Pesquisas de Engenharia Civil

Check-List para Data Centers, passo a passo de itens a serem seguidos para avaliar critérios de instalação

Tipologia: Manuais, Projetos, Pesquisas

2019
Em oferta
30 Pontos
Discount

Oferta por tempo limitado


Compartilhado em 19/08/2019

Mc3i
Mc3i 🇧🇷

5

(1)

1 documento

1 / 6

Toggle sidebar

Esta página não é visível na pré-visualização

Não perca as partes importantes!

bg1
DATA CENTER
CHECKLIST
POWER
Substation feeds dedicated to data center facility
Substation is fed by independent sources on the electrical grid
Substation feeds enter the property via diverse routes
At least one feed is underground and concrete-encased end-to-end
UPS designed with a maintenance bypass, allowing live full replacement
Maintenance bypass is UPS protected
Generator fuel stored on site
Generators run at least 48 hours at full load
Power system is concurrently maintainable
POWER SCORE
COOLING
Chilled water design
Water pipes run under the data center
Diverse water feeds
Condenser water system paralleled
Chillers paralleled
Chilled water pumps paralleled
Chilled water distribution triple looped
Cooling system is concurrently maintainable
COOLING SCORE
After narrowing down your search for your next data center, use our data center
checklist to evaluate key criteria as you tour your top facilities.
1. Enter the names of your prospective colocation providers at the top of the checklist.
2. Check off the features found in each facility.
3. When finished touring, compare section scores and total scores for each facility.
COLOCATION PROVIDERS
Colocation
Provider A
Colocation
Provider B
Colocation
Provider C
Colocation
Provider D
Colocation
Provider E
0
0
0
0
0
0
0
0
0
0
pf3
pf4
pf5
Discount

Em oferta

Pré-visualização parcial do texto

Baixe Check-List Data Centers e outras Manuais, Projetos, Pesquisas em PDF para Engenharia Civil, somente na Docsity!

CHECKLIST

POWER

Substation feeds dedicated to data center facility Substation is fed by independent sources on the electrical grid Substation feeds enter the property via diverse routes At least one feed is underground and concrete-encased end-to-end UPS designed with a maintenance bypass, allowing live full replacement Maintenance bypass is UPS protected Generator fuel stored on site Generators run at least 48 hours at full load Power system is concurrently maintainable POWER SCORE

COOLING

Chilled water design Water pipes run under the data center Diverse water feeds Condenser water system paralleled Chillers paralleled Chilled water pumps paralleled Chilled water distribution triple looped Cooling system is concurrently maintainable COOLING SCORE

After narrowing down your search for your next data center, use our data center

checklist to evaluate key criteria as you tour your top facilities.

  1. Enter the names of your prospective colocation providers at the top of the checklist.
  2. Check off the features found in each facility.
  3. When finished touring, compare section scores and total scores for each facility. COLOCATION PROVIDERS

CHECKLIST

NETWORK & CONNECTIVITY

Carrier-neutral with access to at least 10 different carriers High quality blended Internet service offering Internal meet-me-room or telecom exchange point Core network equipment protected from customer access Underground, concrete-encased network conduits Diverse network entry points Diverse network feed paths Private data transport between data centers available Data transport is diverse and redundant Direct connectivity to major cloud providers Network is monitored from provider-controlled Network Operations Center (NOC) Will provide connectivity to offices and other data centers CONNECTIVITY SCORE

COMPLIANCE

SSAE 18 SOC Type I SSAE 18 SOC Type II ISO 27001 PCI-DSS HIPAA COMPLIANCE SCORE

SCALABILITY

Owners/operators have planned for future expansion There is sufficient space availabe for your future expansion needs There is sufficient power capacity available to the site for expansion SCALABILITY SCORE

CHECKLIST

BUILDING STRUCTURE

Foundation supported by underground piers No ramps up to white floor Building is purpose-built to be a data center Each UPS system is in a secure, isolated room Walls and roof built to withstand 185+ mph winds Exterior walls are concrete and at least 10 inches thick Roof is made of concrete and sealed Slab design loading per sq ft is at least 250 psf Raised floor will hold equipment racks weighing up to 4,000 lbs each At least 36 inches between raised floor and subfloor STRUCTURE SCORE

EFFICIENCY

Variable frequency drive chillers Variable frequency drive pumps Variable frequency drive air handlers Sealed cabinets Insulated roof Efficient UPS with eco mode EFFICIENCY SCORE

CHECKLIST

LOCATION

Distance of 1+ miles from major roadways Distance of 1+ miles from train tracks Distance of 2+ miles from airport Located above the 500-year flood plain Located outside earthquake zone Located outside hurricane zone Located outside tornado zone Located outside blizzard/snowstorm zone Proximity to hotels, restaurants and retail LOCATION SCORE

STAFF AMENITIES

Loading dock Staging area Conference rooms Dedicated office space available Dedicated storage space available Briefing / presentation room Breakroom stocked with coffee, snacks, beverages & MREs Cots available for overnight stays Showers on site Washer / dryer on site Personal lockers available Site is easily accessible to staff via airport and roadways AMENITIES SCORE