






Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
When working on multiple estimates in the same city/state/zip, you can set up Project Loss Defaults for that city/state/zip to save time. - ✔✔True Where in Xactimate can you go to change the default wall thickness for all future estimates? - ✔✔Control Center/Preferences This is a shortcut used in Model Statements to pre-fill data that has already been recorded in an estimate. - ✔✔Token Which of the following is not an option through the Contact Manager? - ✔✔Users You can data transfer an estimate via XactAnalysis to another Xactimate user without knowing their XactNet address. - ✔✔False The only way to update your Xactimate version is through a disc. - ✔✔False
Typology: Exams
1 / 12
This page cannot be seen from the preview
Don't miss anything!
When working on multiple estimates in the same city/state/zip, you can set up Project Loss Defaults for that city/state/zip to save time. - ✔✔True Where in Xactimate can you go to change the default wall thickness for all future estimates? - ✔✔Control Center/Preferences This is a shortcut used in Model Statements to pre-fill data that has already been recorded in an estimate. - ✔✔Token Which of the following is not an option through the Contact Manager? - ✔✔Users You can data transfer an estimate via XactAnalysis to another Xactimate user without knowing their XactNet address. - ✔✔False The only way to update your Xactimate version is through a disc. - ✔✔False The ability to merge data already saved from your contact manager directly into an estimate does
not exist. - ✔✔False
There is no way to re-organize the members of the Grouping pane in Estimate Items - ✔✔False
Which of the following are Roof Variables - ✔✔SF, SQ, HIP, VAL, R, P An alternate method of estimating for a loss can be done from the Sketch Tab. - ✔✔True Draw lines to match the following Staircase Variable to its correct definition - ✔✔a. Tread Count TCAS b. Wall and Ceiling Area Above Staircase WCAS c. Wall Area Below Staircase WBS d. Floor Area Above Staircase FAS e. Perimeter of Ceiling Below Staircase PCBS You can add line items while viewing your sketch in 3D mode - ✔✔True When using subvariables, what room number does Xactimate assign to the main area of the room? - ✔✔ 0 It is possible to add a line item for tile floor covering at the same time as adding a reference area.
If the activity of an item is changed, the unit price for the item does not change. - ✔✔False __________ are those additional activities, such as labor or material assumption, which may be required to complete a task. - ✔✔Supporting Events To keep the ridge from shifting when modifying a single rafter length on a gable roof, use the following tool: - ✔✔Roof Locks This view tool allows you to view the overlay of carpet and vinyl once those items are graphically placed in the room. - ✔✔Flooring Overlay Which of the following are options for adding new grouping members in the grouping window? - ✔✔Append, Insert, Attach You can re-sequence line numbers from the Estimate Reports window prior to printing out a report. - ✔✔True After selecting more than ____ images per page to print in the Estimate Reports window, the
After using the square break tool, why should you click on the wall and check the measurement?
✔✔Carpet, Ninyl Sheet Goods, Shingles
Once and item is on the cusror which mouse button (right or left click) will allow you to select additional items relating to the original item? - ✔✔Right click