Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

TEWLS209 Exam With 100% Correct Answers, Exams of Nursing

TEWLS209 Exam With 100% Correct Answers

Typology: Exams

2024/2025

Available from 07/05/2025

Chris-Dafoe
Chris-Dafoe 🇺🇸

4

(1)

3.2K documents

1 / 4

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
TEWLS209 - MRP CONTROLLER EXAM
WITH 100% CORRECT ANSWERS
ME53N is used to review Purchase Requisition (PR) information. Which field within a PR
specifies when the purchase requisition should be converted into a purchase order? - correct
answers ✔✔Release date
You are a MRP Controller and need to make changes to a specific Material Master record. Which
transaction are you accessing? - correct answers ✔✔ZMM_MM02_MP
When editing data in a Purchase Requisition (PR), you must access ME52N. What are common
PR changes? - correct answers ✔✔All of the above
In ME53N, Display Purchase Requisition > Item Detail tab > Quantities/Dates, there are two
terms named Closed and Fixed ID. Match the term with the definition. - correct answers
✔✔Closed: A. If this Flag is selected, no further purchase orders are to be created for this
purchase requisition.
Fixed ID: B. TEWLS automatically sets the check mark if manual changes are made to the
purchase requisition.
Material Master covers all areas from Basic material data over Sales, Purchasing, Material
Planning, Warehousing to Accounting. How many tabs does the Material Master consist of? -
correct answers ✔✔29
Material Requirements Planning (MRP) determines what material is needed, in what quantity,
at what time, and creates corresponding order proposals (Purchase Requisitions). - correct
answers ✔✔True
pf3
pf4

Partial preview of the text

Download TEWLS209 Exam With 100% Correct Answers and more Exams Nursing in PDF only on Docsity!

TEWLS209 - MRP CONTROLLER EXAM

WITH 100% CORRECT ANSWERS

ME53N is used to review Purchase Requisition (PR) information. Which field within a PR specifies when the purchase requisition should be converted into a purchase order? - correct answers ✔✔Release date You are a MRP Controller and need to make changes to a specific Material Master record. Which transaction are you accessing? - correct answers ✔✔ZMM_MM02_MP When editing data in a Purchase Requisition (PR), you must access ME52N. What are common PR changes? - correct answers ✔✔All of the above In ME53N, Display Purchase Requisition > Item Detail tab > Quantities/Dates, there are two terms named Closed and Fixed ID. Match the term with the definition. - correct answers ✔✔Closed: A. If this Flag is selected, no further purchase orders are to be created for this purchase requisition. Fixed ID: B. TEWLS automatically sets the check mark if manual changes are made to the purchase requisition. Material Master covers all areas from Basic material data over Sales, Purchasing, Material Planning, Warehousing to Accounting. How many tabs does the Material Master consist of? - correct answers ✔✔ 29 Material Requirements Planning (MRP) determines what material is needed, in what quantity, at what time, and creates corresponding order proposals (Purchase Requisitions). - correct answers ✔✔True

What are the main transactions performed by the MRP Controller? - correct answers ✔✔All of the above The Accounting 1 tab in MM03 shows the price information including Standard and Moving Price. The Moving Price is calculated based on the Purchase Order Price and is updated when receipts are processed with different prices. - correct answers ✔✔True In MM03, MRP 1 tab, the _________ is important for reorder point planning only. If the stock falls below this quantity, TEWLS creates a purchase requisition during the next MRP run. - correct answers ✔✔Reorder point The Stock Requirements List displays a detailed, real-time overview of the current stock and planning situation for a material. This list is the main tool for the MRP Controller to monitor critical planning/stock situations. - correct answers ✔✔True ZMMRP4, MRP Master Data Review transaction is also used to set up Master Data with a reference material. - correct answers ✔✔True Within ZMMRP4 MRP Master Data Review report, you can double-click the fields highlighted in green to jump link to another transaction. Which transactions can be accessed? - correct answers ✔✔ ZMMRP1 is used to update the Planned Delivery Time of a material. When executing the transaction and you start entering criteria on the Initial screen, what is the purpose of checking the Process Material Master Updates item? - correct answers ✔✔Material Master automatically updates with the new planned delivery time. For MRP Type ZD materials, the Maximum Stock Level is only calculated as a basis for the determination of the Maximum Release Quantity (MRQ). - correct answers ✔✔True

To review Consumption information for a specific material record, which tab in Material Master are you accessing? - correct answers ✔✔Forecasting ZMMRP3, Check MRP Type is performed to review the consumption history and if necessary, make changes to the planning strategy. - correct answers ✔✔True Transaction ZMM_DUEIN is mainly used to display Materials with open Due Ins. - correct answers ✔✔True When searching for material movement history in TEWLS, Transaction __________ is the preferred transaction to use. It displays material documents which were posted for one material in a specific plant. - correct answers ✔✔ZMMMATLMOVE The transaction name for SBWP is Small Business Waste Program. - correct answers ✔✔False Which transaction do you use, to create internal cataloging requests? - correct answers ✔✔ZSD_INIR Transaction ZMM_INVENT is used to display an overall stock report. For the most common uses, there are predefined variants available. Select any that apply. - correct answers ✔✔