Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
SWPPP EXAM 2025 WITH 100% ACCURATE SOLUTIONS
Typology: Exams
1 / 8
This page cannot be seen from the preview
Don't miss anything!
The law that set into place stormwater regulations in the 1970s is - correct answers ✔✔The Clean Water Act Regulations for managing stormwater activity on a construction site are outlined in the - correct answers ✔✔NPDES When should you read and understand your project stormwater pollution prevention plan - correct answers ✔✔Immediately after the project awarded and before you begin any site work is Which of the following is not an allowable stormwater discharge or non-stormwater discharge - correct answers ✔✔Discharges are contaminated groundwater Construction activity may begin - correct answers ✔✔When the jurisdiction of operation specifies you can start Waters that sell anti-degration standards are placed on the _______ list - correct answers ✔✔303D SWPP certifications are signed by - correct answers ✔✔An officer of the project owner or an officer of the general contractor. TRUE OR FALSE: The document that must be completed signed and submitted to the state to obtain authorization to discharge is the NOT - correct answers ✔✔False
The notice of termination can be filed when - correct answers ✔✔All construction inside and outside of the building is completed and the final stabilization has been verified as complete Operators on a construction site are the entity in charge of plans and specifications and the entity who is - correct answers ✔✔Is in charge of daily activities You should have a SWPPP for your construction site because (3 reasons) - correct answers ✔✔1. Its documents stormwater management
The document completed by the project SWPPP inspector recording site conditions during the inspection is - correct answers ✔✔The inspection report form The document that must be completed to report hazardous spill on site is - correct answers ✔✔The spill report form The document that verifies that weekly management meetings have been conducted is - correct answers ✔✔The weekly meeting form The document delegating responsibility of inspections to another is - correct answers ✔✔The delegation letter The document that must be completed when final stabilization is complete is - correct answers ✔✔The NOT Scheduling - correct answers ✔✔Aids in protecting the site by timing construction activities Factors to consider when creating your schedule include - correct answers ✔✔Account for the time it takes to install or implement BMP's between each phase of construction When installing perimeter BMP controls - correct answers ✔✔Note to locations and dates for installation on site map Stormwater issues are usually discussed during the pre-con meeting include - correct answers ✔✔SWPPP BMP's and construction schedule Sediment control devices must be installed - correct answers ✔✔Down slope of construction areas and functioning as designed prior to beginning land disturbing activities
If you have stormwater inlets in your construction roadway - correct answers ✔✔Consult your project SWPPP to ensure you are protecting inlets properly Soil stock piles and other disturb areas must receive - correct answers ✔✔Temporary stabilization if they will remain in active for more than 14 days and potentially fewer days depending on the jurisdiction In the process of transitioning form Lan development to building construction it is important to - correct answers ✔✔Implement specific BMP's to address potential pollution associated with construction materials The SWPPP sequence of activities can be modified - correct answers ✔✔After consulting the project SWPPP designer and or project owner and receiving approval Once the notice of termination is filed store all stormwater related project information - correct answers ✔✔For three years or more depending on permit and contact obligation When installing perimeter BMP controls - correct answers ✔✔No locations and dates of installation on site map Stormwater issues usually discussed during the pre-con meeting include - correct answers ✔✔SWPPP BMP's and the construction schedule Which erosion control best management practices increase water infiltration decrease rainfall energy and slow overland flow of stormwater - correct answers ✔✔Vegatation Vegetation Which of the following factors affect erosion (3) - correct answers ✔✔1. Ground cover
When installing and maintaining a check dam make sure - correct answers ✔✔The low point of the check that was in the middle of a channel Storm drain inlet protection is intended tp - correct answers ✔✔Pond water in allow sediment to settle out To reduce the possibility of undercutting you should - correct answers ✔✔Install filter fabric under BMPs and stormwater conveyance Sediment basins are often converted to - correct answers ✔✔Detention and retention ponds Concrete water washout has a high - correct answers ✔✔PH Proper spell management should include all the following except - correct answers ✔✔Installation of spill pit on your construction site The best location for a portable toilet on your construction site is - correct answers ✔✔On level ground in a low construction traffic area A common potential pollutant in a vehicle maintence area is - correct answers ✔✔Petroleum Which material management practice may address both sediment and dust control - correct answers ✔✔street cleaning Temporary stabilization should be implemented - correct answers ✔✔On all disturbed areas that will remain in active for 14 days or more
A key first step before installing a roll erosion control product of our RECP is - correct answers ✔✔Properly preparing the ground surface Which of the following ground covers is best applied to moderate to steep slopes and in stormwater conveyances - correct answers ✔✔rolled erosion RECPS What percentage vegetation density is typically required to establish for stabilization - correct answers ✔✔70% When inspecting silt fence look for all but one of the following defenciencies deficiencies - correct answers ✔✔Track out A fiber roll or wattle is intended to - correct answers ✔✔Capture sediment from a seat for low and slow runoff velocity Which of the following is not considered when removing temporary sediment basins - correct answers ✔✔Keep the overflow or spillway in tact The primary purpose of a construction exit - correct answers ✔✔To remove sediment from the consrtuction site vehicles and prevent track out construction BMP's identified by the SWPPP inspector as needing repairs must be corrected and documented