Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Solved Exam 1 for Materials, Methods and Equipment | CM 2121, Exams of Introduction to Business Management

Material Type: Exam; Professor: Heumann; Class: MTRLS MTHDS EQMNT I; Subject: Construction Management; University: Louisiana State University; Term: Fall 2017;

Typology: Exams

2016/2017

Uploaded on 10/16/2017

murillo-carlos01
murillo-carlos01 🇺🇸

1 document

1 / 5

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
pf3
pf4
pf5

Partial preview of the text

Download Solved Exam 1 for Materials, Methods and Equipment | CM 2121 and more Exams Introduction to Business Management in PDF only on Docsity!

Ce DATE TRUE (T) or FALSE (F): Circle the correct answer (2 pts. ea.). 1. @or F. Concrete shrinks during curing and drying. 2. @orF. Phased construction can introduce additional risks if elements built early come into conflict with later design decisions. Ba or€) Piles are made of wood, steel, or brick. 4.7 or) The proper curing of concrete requires sufficient quantities of water and air. SU of) Fly ash is a neturally occurring volcanic ash found in the Western U.S. af 6Gier F. Zoning ordinances control how much land can be covered by buildings, building cove: deal with safety and health relative to the quality of constructi 7 7 orf) Sandy soils typically have a low bearing capacity than silts or clays. cS. 7 off) Caissons are a slope suppor: system for deep excavations. 2. Oe F. Incomplete consolidation leads to a rock pocket in the concrete wall. 10D br F. Sloped or benched excavation is less expensive than sheeted excavation, but requires a site without nearby property lines. # MATCHING: Match ise following statements to the BEST answer from the list on the back of this page (2 pis. ea.). i - 11. Methodology used for rating the environmental sustainability of a building's design and construction. ; biz. Typically match occupancy types or use groups with construction typ ‘on fire resistance ratings. cule