Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

SAFe Agile Advanced Scrum Master Exam: Comprehensive Questions and Answers, Exams of Software Project Management

A comprehensive set of questions and answers related to the safe agile advanced scrum master exam. It covers various aspects of safe agile, including scrum master responsibilities, team dynamics, continuous improvement, and the safe framework. Valuable for individuals preparing for the safe agile advanced scrum master certification exam.

Typology: Exams

2024/2025

Available from 04/04/2025

victor-kiragu
victor-kiragu 🇺🇸

211 documents

1 / 7

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
SaFe Agile Advanced Scrum Master Exam with
Comprehensive Questions and Answers
A team achieved less than 80% predictability during the quantitative
measurement of the Inspect and Adapt event. What would be an
unacceptable action for this team's Scrum Master to take? Decide
improvement actions for the team to implement
A team's Product Owner (PO) takes an unexpected leave of absence for
the last week of the Iteration. Three of the team's Stories have been
completed and are waiting to be accepted. Work with the Release Train
Engineer to find a solution
Achieving the goals of Release on Demand requires an understanding of
how to decouple what? The release from deployment
An effective decision-making framework provides which two ultimate
outcomes? (Choose two.) WRONG!!! _////// Unlocks the intrinsic
motivation of knowledge workers;Improves flow; ///// Improves
flow;Reduces WIP limits; // reduces delays as a result of centralized
decision making - improves flow /// Unlocks the intrinsic motivation of
knowledge workers; Reduces delays as a result of centralized decision-
making
At the System Demo, each team demonstrates their own work, but the
system is not integrated. They say they underestimated the integration
effort and cannot integrate every Iteration and also meet the planned
scope. What should the Scrum Master suggest? Discuss removing scope
with Product Management to allow for Continuous Integration
Considering individual skill sets, an E-shaped person has a combination of
what? Experience, expertise, exploration, and execution
During Iteration planning, the Product Owner (PO) introduces a new Story
to the team. They cannot come to a consensus on the size of the new
pf3
pf4
pf5

Partial preview of the text

Download SAFe Agile Advanced Scrum Master Exam: Comprehensive Questions and Answers and more Exams Software Project Management in PDF only on Docsity!

SaFe Agile Advanced Scrum Master Exam with

Comprehensive Questions and Answers

A team achieved less than 80% predictability during the quantitative measurement of the Inspect and Adapt event. What would be an unacceptable action for this team's Scrum Master to take? ✓Decide improvement actions for the team to implement A team's Product Owner (PO) takes an unexpected leave of absence for the last week of the Iteration. Three of the team's Stories have been completed and are waiting to be accepted. ✓Work with the Release Train Engineer to find a solution Achieving the goals of Release on Demand requires an understanding of how to decouple what? ✓The release from deployment An effective decision-making framework provides which two ultimate outcomes? (Choose two.) ✓WRONG!!! _////// Unlocks the intrinsic motivation of knowledge workers;Improves flow; ///// Improves flow;Reduces WIP limits; // reduces delays as a result of centralized decision making - improves flow /// Unlocks the intrinsic motivation of knowledge workers; Reduces delays as a result of centralized decision- making At the System Demo, each team demonstrates their own work, but the system is not integrated. They say they underestimated the integration effort and cannot integrate every Iteration and also meet the planned scope. What should the Scrum Master suggest? ✓Discuss removing scope with Product Management to allow for Continuous Integration Considering individual skill sets, an E-shaped person has a combination of what? ✓Experience, expertise, exploration, and execution During Iteration planning, the Product Owner (PO) introduces a new Story to the team. They cannot come to a consensus on the size of the new

Story and ask the PO for more details. ✓No; the team left the Story in the Team Backlog for further refinement with the PO During Iteration Review, the team decides to carry forward three Stories to the next Iteration. This is the second time during this PI that some of the team's Stories are carried over. What are two actions the Scrum Master should take? (Choose two.) ✓Discuss the issue at the Iteration Retrospective;Perform the 5 Whys to find the root cause of the delays; During PI Planning, the scrum of scrums meetings help accomplish which two actions? (Choose two.) ✓Keeping the planning Milestones on track;Exposing risks, impediments, and dependencies; How can learning Milestones be used? ✓To test the concept of a new Feature or Capability How do Agile Teams ensure their own retrospective improvement actions are implemented? ✓Add improvement Stories to the team backlog to implement in the next Iteration How do Kanban teams implement the SAFe Lean-Agile Mindset of relentless improvement? ✓By using cumulative flow diagrams to objectively measure bottlenecks and variation which could be due to systemic factors How does a Scrum Master lead a team's efforts in relentless improvement? ✓By facilitating the Iteration Retrospective How does the Scrum Master help teams address the challenges of modern Enterprises? ✓By actively addressing impediments How does work flow from one state to the next in a team Kanban board? ✓Team members pull work from the previous state when they can do so without impacting their current state WIP constraint

the System Demo;Facilitate team preparation for PI Planning;Participate in the scrum of scrums; What are three benefits a community of practice offers? (Choose three.) ✓To drive craftsmanship;To facilitate the adoption of new methods and techniques;To provide a place to acquire knowledge; What are three distinct traits a group must have to be considered a Community of Practice? (Choose three.) ✓Practice;Community;Domain; What are three Iteration Retrospective anti-patterns? (Choose three.) ✓When the team's people manager comes in to observe;When only some of the team attends;When the Scrum Master decides what the retrospective topic(s) will be and directs the team on specific improvement items to work on; What are two examples of tasking anti-patterns? (Choose two.) ✓The team focuses on task completion over Story completion and acceptance criteria; The team provides updates only on tasks during the daily stand up meeting What are two key areas a team should be organized around? (Choose two.) ✓Enablers;Features; What are two reasons why too much work in process (WIP) is a problem? (Choose two.) ✓It hides bottlenecks in the workflow;It shows that the overall system is inefficient; What are two Release Train Engineer responsibilities? (Choose two.) ✓Drive relentless improvement through Inspect and Adapt;Facilitate PI Planning readiness and the event itself;

What are two typical anti-patterns with Product Owners (POs)? (Choose two.) ✓POs design the Solution before brining the intent to the team; POs and Product Management are not aligned with business intent What improves collaboration between Scrum Masters and System Architects, System Teams, and Operations? ✓Program Kanban What is a recommended Story-splitting technique for Agile Teams? ✓Implement the 'happy path' first and the rest of the scenarios afterwards What is one characteristic of an effective Agile Team? ✓To provide steady, high quality, incremental value What is one Extreme Programming (XP) rule adopted in SAFe? ✓Pair programming What is one way to improve the skills of a team member? ✓Pair-work with other team members What is the connection between feedback and optimum batch size? ✓Lack of feedback contributes to higher holding cost What is the first step in the problem-solving workshop? ✓Agree on the problem to solve What is the most effective way to establish Built-in Quality? ✓Perform as many types of testing within the Iteration boundaries as possible What is the SAFe recommended duration of a PI? ✓8 - 12 weeks What is the skill type Scrum Masters try to get the Agile Team to achieve? ✓T-shaped

Which two actions enhance an Agile Release Train's performance? (Choose two.) ✓Collaboration;Team alignment; Which two events explicitly implement the Lean-Agile Mindset of relentless improvement? (Choose two.) ✓Inspect and Adapt;Iteration Retrospective; Who is responsible for assisting to establish Continuous Integration in SAFe? ✓The System Team Who participates in the Inspect and Adapt event? ✓The entire Agile Release Train Who reviews the top Capabilities for the upcoming PI? ✓Solution Management Who should vote on root causes? ✓The team members working on that problem Why are SAFe Scrum Masters challenged differently in an Enterprise? ✓The team is affected by teams and stakeholders beyond their control Why should team members continuously and actively engage with other teams during PI Planning? ✓To manage dependencies and resolve impediments