Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
An overview of project planning, focusing on activity sequencing, identification, and dependencies. It covers the importance of managing project scope, creating a Work Breakdown Structure (WBS), and the role of constraints and change control. The document also discusses task dependencies, network diagrams, and critical path identification. Project managers will learn how to calculate project duration, reveal critical tasks, and optimize resource allocation through techniques like resource levelling and smoothing.
Typology: Lecture notes
1 / 66
This page cannot be seen from the preview
Don't miss anything!
Diagrams Dr. Andre Samuel
-^ Project Charter:^ –^ Purpose^ –^ Main Element^ –^ Template
‘The Plan is nothing, Planning is
everything’Lord Nelson and General Eisenhower
-^ It is about
sequencing
project activities and milestones into a sensible and logical order • It involves linking activities to form a project network to showhow different activities are related to each other • Planning will establish the
timing^ of the activities and resource requirements
-^ Scope of works^ –^ WBS
-^ In the project context scope may refer to:^ –^ Product scope‐
the features and functions that characterize a product or service – Project scope‐
the work that must be done to deliver a product with the specified features and functions
Construction of Valencia to Toco Roadhttp://www.mowt.gov.tt/documents/Valencia%20Main%20Road%20Upgrade%20Project%20Presentation%20.pdf
Construction of Valencia to Toco Road: Packages
1 to 8 https://www.opm.gov.tt/pm‐rowley‐turns‐sod‐for‐valencia‐to‐toco‐upgrade
-^ Phase 1 is separated into 4 packages which consist of:^ –^ The construction of a
roundabout at Valencia Junction
along with
associated concrete and drainage works; Improvement of drainagenetwork North of Valencia Junction – Milling and paving from the Intersection of Eastern Main Road andToco Main Road to the 2km mark
along the Toco Main Road; Construction of a car park inclusive of a perimeter fence and relocationof the vegetable stall – Road widening and reconstruction
along with associated drainage works from the 2km mark to the 3.5km mark – Road widening and reconstruction
along with associated drainage works from the 3.5km mark to the 5.0km mark inclusive of slopestabilization at 4.2km mark