
Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
The necessary data for determining the completion time, critical path, and slack times for a given pert/cpm network. Students are required to solve the problem manually before checking their answers using pom. The network consists of 12 activities (a to j) with their respective times and dependencies.
Typology: Assignments
1 / 1
This page cannot be seen from the preview
Don't miss anything!
Names ____________________________ BA 353: ICE 7 Due on Wednesday, 10/15/08, under my office door (EBH 158). 1) Determine the completion time, critical path, and slack times for the following PERT/ CPM network. Solve by hand first; then check your answers on POM if you wish. Act I.P. Time Slack A -- 7 Completion Time ____________ B -- 5 C A 12 Critical Path ____________ D A 8 E A 2 F B 5 G B 9 H D 9 I E,F 6 J G,I 7 2) Same instructions as problem 1). Act I.P. Time Slack A -- 5 Completion Time: ___________ B -- 10 C -- 13 Critical Path: ___________ D A 9 E A 3 F D 3 G E,B 8 H C 9 I F 4 J D,G 7