Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

PIPEFITTER NCCER TEST NEWEST TEST | ALL QUESTIONS AND CORRECT ANSWERS | LATEST VERSION, Exams of Industrial Engineering

PIPEFITTER NCCER TEST NEWEST TEST | ALL QUESTIONS AND CORRECT ANSWERS | LATEST VERSION | VERIFIED ANSWERS | GRADED A+

Typology: Exams

2024/2025

Available from 09/15/2024

rex-smith-1
rex-smith-1 🇺🇸

783 documents

1 / 26

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
PIPEFITTER NCCER TEST NEWEST TEST | ALL
QUESTIONS AND CORRECT ANSWERS |
LATEST VERSION | VERIFIED ANSWERS |
GRADED A+
When performing a hydrostactic test, at what percentage of the MAXINUM
intended
test pressure should the test be paused and the system inspected?
A) 25%
B) 30%
C) 50%
D) 75% ------CORRECT ANSWER---------------C
What is the elevation of the BOP of an 12'' schedule 40 pipe if its center
line elevation is
203'- 1 1/2''?
A) 203'- 1 1/2''
B) 202'- 7 1/8''
C) 202' - 1 1/2''
D) 202' - 0 1/4'' ------CORRECT ANSWER---------------B
If both fists are placed in front of your body with your thumbs pointed
outward, the
crane operator should.
A) Extend the outriggers
B) Raise the boom
C) Extend the boom sections
D) Retract the boom sections ------CORRECT ANSWER---------------C
What is the length of pipe required to fabricate a 8'' diameter schedule 40
pipe spool
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a

Partial preview of the text

Download PIPEFITTER NCCER TEST NEWEST TEST | ALL QUESTIONS AND CORRECT ANSWERS | LATEST VERSION and more Exams Industrial Engineering in PDF only on Docsity!

PIPEFITTER NCCER TEST NEWEST TEST | ALL

QUESTIONS AND CORRECT ANSWERS |

LATEST VERSION | VERIFIED ANSWERS |

GRADED A+

When performing a hydrostactic test, at what percentage of the MAXINUM intended test pressure should the test be paused and the system inspected? A) 25% B) 30% C) 50% D) 75% ------CORRECT ANSWER---------------C What is the elevation of the BOP of an 12'' schedule 40 pipe if its center line elevation is 203'- 1 1/2''? A) 203'- 1 1/2'' B) 202'- 7 1/8'' C) 202' - 1 1/2'' D) 202' - 0 1/4'' ------CORRECT ANSWER---------------B If both fists are placed in front of your body with your thumbs pointed outward, the crane operator should. A) Extend the outriggers B) Raise the boom C) Extend the boom sections D) Retract the boom sections ------CORRECT ANSWER---------------C What is the length of pipe required to fabricate a 8'' diameter schedule 40 pipe spool

with one 90 degree butt weld elbow on one end, and one 45 degree butt weld elbow on the other end, with a center-to-center measurement of 72'' (assume a 1/ welder gap) A) 58 3/ B) 54 3/ C) 52 1/ D) 46 1/4 ------CORRECT ANSWER---------------B All of the following types of pipe are thermoplastic EXCEPT. A) Polyvinyl Chloride (PVC) B) Fiberglass C) Polyethylene D) Acrylonitrile - Butadiene- Styrene ------CORRECT ANSWER--------------- B Which of the following is a classification of cast iron pipe? A) Schedule 40 B) Schedule 80 C) XH D) XS ------CORRECT ANSWER---------------C Which of the following parts of a layout will NOT be the same for all three lines in an equally spread offset? A) Starting point B) Run C) Set D) Travel ------CORRECT ANSWER---------------A Flat Face Flanges require which type of gasket? A) Spiral wound

Globe valve : A) Prevents reversal of flow through a piping system B) Has a globe - shaped handle C) Relieves pressure D) Is better than a gate valve for throttling flow ------CORRECT ANSWER--- ------------D In relationship to the diameter of the eye bolt, how deep should the tapped holes for eye bolts be? A) 1/2 times B) 1 time C) 1 1/2 times D) 2 times ------CORRECT ANSWER---------------C When fabricating a spooled piece of pipe which type of drawing would normally be used A) Plan view C) P & ID B) Isometric D) Orthographic ------CORRECT ANSWER---------------B What is the product of 7.60 x 0. A) 0. B) 1. C) 1. D) 9.912 ------CORRECT ANSWER---------------A To signal that you want to use the main hoist A) Extend your arm and raise your thumb B) Tap your elbow C) Tap your hard hat D) Clasp your hands ------CORRECT ANSWER---------------C

How much would a 40' - 6''length of 12'' diameter standard weight pipe weigh? A) 2009 lbs B) 2013 lbs C) 2650 lbs D) 2655 lbs ------CORRECT ANSWER---------------A What would be the long segment measurement of a SIX-PIECE, 90 degree mitered elbow that has a radius of 24'' A) 3 3/ B) 7 5/ C) 7 13/ D) 15 1/2 ------CORRECT ANSWER---------------B Performance, reliability, and quality of components are assured by use of A) A qualified journeyman B) Standards and Codes C) A qualified engineer D) Reputable manufactures ------CORRECT ANSWER---------------B In-line specialty ball joints solve all the following problems EXCEPT. A) Alignment B) Vibration C) Expansion D) Flow ------CORRECT ANSWER---------------D Convert 9/16 to a decimal. A) 0.58 C) 0. B) 0.56 D) 0.53 ------CORRECT ANSWER---------------B

D) Heat number, wall thickness, and country of origin ------CORRECT ANSWER---------------C Convert 1/4 to its decimal equivalent. A). B). C) 0. D) 0.5 ------CORRECT ANSWER---------------B Piping that is field-routed to a pump must be supported A) Off the pump suction B) Diagonally C) Independently D) Off the pump discharge ------CORRECT ANSWER---------------C What is used when lighting a cutting torch? A) Striker B) Cigarette lighter C) Match D) Any open flame ------CORRECT ANSWER---------------A Where is specific information needed to install piping and associated items found? A) Reliability network B) Owner of the company C) Material Manufacturer D) Standards and Specifications ------CORRECT ANSWER---------------D Damaged and broken tools should be A) Used if possible

B) Kept for backup C) Taken out of Service D) Used for minor tasks ------CORRECT ANSWER---------------C What is the ID of 10'' schedule 80 piping. A) 9 3/ B) 9 5/ C) 9 9/ D) 10 1/16 ------CORRECT ANSWER---------------C The two steps in making up threaded joints are the hand engagement and A) Machine makeup B) Wrench makeup C) Driver makeup ------CORRECT ANSWER---------------B Which of the following actions should be taken before a hydrostatic test is performed? A) Remove pressure relief valves B) Leave control mechanisms in place C) Leave orifice flanges in place D) Remove blinds ------CORRECT ANSWER---------------a A 4-inch lateral riser is to be fabricated for a 6-inch pipe. How many ordinate lines will be needed to lay out this cut? A) 32 B) 16 C) 8 D) 4 ------CORRECT ANSWER---------------C

Chain come-alongs are PRIMARILY designed for? A) Lifting in close quarters B) Vertical lifting C) Lifting in any location D) Horizontal lifting ------CORRECT ANSWER---------------B Which of the following types of copper tubing has the thickest wall A) K B) L C) M D) Acr ------CORRECT ANSWER---------------A What is the MINIMUM grade of chain that may be used for rigging loads overhead? A) 5 B) 6 C) 7 D) 8 ------CORRECT ANSWER---------------D At and above what norminal pipe size is the O.D. of the pipe the same as the norminal size of the pipe. A) 10'' B) 12'' C) 14'' D) 16'' ------CORRECT ANSWER---------------C Which type of field sketch has base lines that are 30 degrees to the horizontal axis?

A) Orthographic B) Oblique C) P & ID D) Isometric ------CORRECT ANSWER---------------D The MINIMUM number of pre-heat holes for liquefied fuel tips is A) 2 C) 6 B) 4 D) 8 ------CORRECT ANSWER---------------C The first step to changing blades and bits on power tools is to A) Disassemble tool B) Disconnect the power C) Remove the guards D) Get a new blade or bit ------CORRECT ANSWER---------------B What must be done to MOST socket welded valves before being welded into place? A) Close the valve completely B) Close the valve halfway C) Open the valve completely D) Cover the end of the valve ------CORRECT ANSWER---------------C What is the length of pipe required to fabricate a 6''diameter schedule 40 pipe spool with one class 150# RFWN flange on one end, and one class 300# RFWN flange on the other end, with a face-to-face measurement of 18 1/2'' (assume a 1/ welder gap) A) 10 11/ B) 10 7/ C) 12 5/ D) 12 1/2 ------CORRECT ANSWER---------------B

Trenches MUST be designed, excavated, and shored according to A) ASME standards C) Company standards B) API standards D) OSHA standards ------CORRECT ANSWER--------------

  • D The angles of any triangle add up to A) 45 degrees B) 90 C) 100 D) 180 ------CORRECT ANSWER---------------D What is the travel on a rolling offset that has a Run of 18'', a roll 24'', and a height of 12'' A) 29 3/ B) 32 5/ C) 34 15/ D) 38 9/16 ------CORRECT ANSWER---------------C Which of the following is a quick opening valve? A) Globe B) Needle C) Butterfly D) Gate ------CORRECT ANSWER---------------C Find the lowest common denominator for 1/8 and 1/ A) 3 B) 5 C) 7 D) 8 ------CORRECT ANSWER---------------D

A piping drawing that shows both the side view and the top view of a piping system is A) Elevation B) Isometric C) Plan D) Double-line ------CORRECT ANSWER---------------B The movement of pipe that is caused by an increase in temperature is called A) Hot spring B) Thermal expansion C) Heat swelling D) Pipe stretching ------CORRECT ANSWER---------------B A cold spring relieves A) Cavitation B) Water hammer C) Thermal expansion D) Tension ------CORRECT ANSWER---------------C How many feet apart must oxygen and fuel gas cylinders be stored, unless there is a 5 ft high, 30 minute burn rated wall between them? A) 5 B) 10 C) 15 D) 20 ------CORRECT ANSWER---------------D When performing a line break, first? A) Break the bolts down & away from you B) Loosen each bolt a little at a time

Ground fault circuit interrupters SHOULD be located A) Closest to the power tool B) At the source of power C) On individual extension cords D) On cords with only 3 prong connections ------CORRECT ANSWER-------- -------D What is the most important hazardous condition in or around an excavation? A) Falls B) Water C) Cave-In D) Vibration ------CORRECT ANSWER---------------C What happens when a misaligned pipe flange is bolted up to an aligned pump's suction flange? A) The speed of the motor will increase. B) The pump and motor will be in alignment. C) The speed of the motor will decrease. D) The pump and motor will be out of alignment. ------CORRECT ANSWER---------------D A pretest field inspection includes all of the following EXCEPT the A) Piping system matches the drawings B) Piping components match the specifications C) Proper gaskets are Installed D) Vent at the low point of the system ------CORRECT ANSWER--------------

  • D

In relation to welding HAZ stands for A) Health activated zone B) Heat affected zone C) Hazard communications D) High altitude zone ------CORRECT ANSWER---------------B Expansion joints allow A) The pipe line to be easily dismantled B) For linear expansion and contraction of pipe lines C) Easy access to flange connections D) Access to unclog the line ------CORRECT ANSWER---------------B Level glasses are also called A) Sight glasses B) Eye glasses C) Inspection ports D) Spirit viles ------CORRECT ANSWER---------------D Bending pipe allows the process to A) Coat less B) Heat up more C) Be stopped D) Flow more freely ------CORRECT ANSWER---------------D Where are title blocks typically located on a drawing? A) Upper right B) Lower right C) Upper left D) Lower left ------CORRECT ANSWER---------------B

Dry washing is a form of A) Removing excess weld B) Cold springing C) Stress relieving D) Hot springing ------CORRECT ANSWER---------------A Who needs to inspect an excavation prior to the start of work each day? A) Forman B) Safety person C) Superintendent D) Competent person ------CORRECT ANSWER---------------D If the area of a rectangle is 432 sq ft and one side is 12 ft long, how long is the other side? A) 9 ft B) 18 ft C) 36 ft D) 72 ft ------CORRECT ANSWER---------------D What is used to open flanges for the installation of a test blind? A) Pipe Wrench B) C-Clamp C) Flange Spreader D) Pry Bar ------CORRECT ANSWER---------------C What is the MINIMUM height above the side of the trench, that a trench box wall should extend? A) 18''

B) 24''

C) 30''

D) 36'' ------CORRECT ANSWER---------------A

To what position does a pneumatic control valve that loses its air supply return? A) Normally Open B) Normally Closed C) Mid Range D) Fail Safe ------CORRECT ANSWER---------------D The two types of scaffolds used by pipefitters is the Tubular Buck and A) Web B) Pole C) Beam D) Flange ------CORRECT ANSWER---------------B When can a lighted torch be unattended? A) When it is hung B) When properly secured C) When adjusting regulator settings D) Never ------CORRECT ANSWER---------------D The majority of pipe hangers and supports are coated with zinc-rich galvanizer to. A) Provide for a flexible support B) Verify color code for pipe supports C) Reduce friction in pipe supports D) Provide corrosion resistance of pipe supports ------CORRECT ANSWER---------------D