Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Oregon Construction Contractors CCB Test questions with answers, Exams of Construction

Oregon Construction Contractors CCB Test questions with answers

Typology: Exams

2024/2025

Available from 01/03/2025

Achieverr
Achieverr 🇺🇸

4.3

(7)

9.2K documents

1 / 84

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Oregon Construction Contractors CCB
Test questions with answers
A person who engages in a business or activity that involves
construction new water wells must possess a license from the:
- ....🔰VERIFIED ANSWERS.... ✔✔Oregon Water Resource
Department (OWRD)
True or False
Prompt billing and prompt collections make for a healthier cash
flow. - ....🔰VERIFIED ANSWERS.... ✔✔True
Oregon OSHA consultants WILL NOT: - ....🔰VERIFIED
ANSWERS.... ✔✔Issue citations or propose penalties for
violations of OSHA standards.
1) Questions to answer when preparing your project schedule
include all of these except:
- All of these are questions to ask
- What equipment will be needed?
- How long will each task take to complete?
- What type of crew will be needed to complete the activity? - ....🔰
VERIFIED ANSWERS.... ✔✔- All of these are questions to ask
- What equipment will be needed?
- How long will each task take to complete?
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21
pf22
pf23
pf24
pf25
pf26
pf27
pf28
pf29
pf2a
pf2b
pf2c
pf2d
pf2e
pf2f
pf30
pf31
pf32
pf33
pf34
pf35
pf36
pf37
pf38
pf39
pf3a
pf3b
pf3c
pf3d
pf3e
pf3f
pf40
pf41
pf42
pf43
pf44
pf45
pf46
pf47
pf48
pf49
pf4a
pf4b
pf4c
pf4d
pf4e
pf4f
pf50
pf51
pf52
pf53
pf54

Partial preview of the text

Download Oregon Construction Contractors CCB Test questions with answers and more Exams Construction in PDF only on Docsity!

Oregon Construction Contractors CCB

Test questions with answers

A person who engages in a business or activity that involves construction new water wells must possess a license from the:

  • ....🔰VERIFIED ANSWERS.... ✔✔Oregon Water Resource Department (OWRD) True or False Prompt billing and prompt collections make for a healthier cash flow. - ....🔰VERIFIED ANSWERS.... ✔✔True Oregon OSHA consultants WILL NOT: - ....🔰VERIFIED ANSWERS.... ✔✔Issue citations or propose penalties for violations of OSHA standards.
  1. Questions to answer when preparing your project schedule include all of these except:
  • All of these are questions to ask
  • What equipment will be needed?
  • How long will each task take to complete?
  • What type of crew will be needed to complete the activity? - ....🔰 VERIFIED ANSWERS.... ✔✔- All of these are questions to ask
  • What equipment will be needed?
  • How long will each task take to complete?
  • What type of crew will be needed to complete the activity? For Notice of Right Lien purpose, a commercial improvement is defined as: - ....🔰VERIFIED ANSWERS.... ✔✔A structure that is not used or intended for use as a residential building I am the residential original contractor and I provide labor and materials for the project. Who do I need to give a notice of Right to Lien to? - ....🔰VERIFIED ANSWERS.... ✔✔Mortgagee A quantity survey is also referred to as a: - ....🔰VERIFIED ANSWERS.... ✔✔Take Off Tagout involves placing a warning tag: - ....🔰VERIFIED ANSWERS.... ✔✔On an energy-isolation device Other than Take Off, other common construction estimate types include all, except: - ....🔰VERIFIED ANSWERS.... ✔✔Ballpark Estimates True or False An on-site of host employer is responsible for ensuring a safe place of employment for leased or temporary workers. - ....🔰 VERIFIED ANSWERS.... ✔✔True The state unemployment tax rate varies base on: - ....🔰VERIFIED ANSWERS.... ✔✔The history of unemployment claims against the employer.

A major difference between the EIN and the BIN is: - ....🔰 VERIFIED ANSWERS.... ✔✔One is federal and one is state Poor construction and storage practices can result in _________________ inside the structure walls. - ....🔰VERIFIED ANSWERS.... ✔✔Molds and fungus Builders now must use corrosion-resistance flashing in these specified locations, except: - ....🔰VERIFIED ANSWERS.... ✔✔Surrounding all interior bedroom doors. Compliance with environmental regulations can protect a contractor from:

  • All of these are correct
  • Private party lawsuits
  • Criminal and civil penalties
  • Liability claims - ....🔰VERIFIED ANSWERS.... ✔✔- All of these are correct
  • Private party lawsuits
  • Criminal and civil penalties
  • Liability claims Using the Quantity Take-Off method for estimating, you begin by estimating the cost of _________________ for each individual task.
  • ....🔰VERIFIED ANSWERS.... ✔✔Labor and materials

Contractors must apply for permits through: - ....🔰VERIFIED ANSWERS.... ✔✔Their local building department A cost effective method for managing material costs and keeping inventory costs down is the: - ....🔰VERIFIED ANSWERS.... ✔✔JIT

  • Just In Time These are materials prohibited form open burning in Oregon except for: - ....🔰VERIFIED ANSWERS.... ✔✔Unpainted and untreated scrap wood An owner-seller may comply with the Homebuyers Protection Act (HPA) by:
  • Doing any of these
  • Purchasing title insurance that does not exclude filed or unfiled claims of lien,
  • Obtaining lien waivers or releases
  • Retaining at least 25% of the sales price in escrow - ....🔰 VERIFIED ANSWERS.... ✔✔- Doing any of these
  • Purchasing title insurance that does not exclude filed or unfiled claims of lien,
  • Obtaining lien waivers or releases
  • Retaining at least 25% of the sales price in escrow What are the possible consequences that a contractor may face if he or she fails to provide the information to the Owner About Construction Liens when required?
  • Only roof assemblies - ....🔰VERIFIED ANSWERS.... ✔✔- All of these are part of the building exterior shell
  • Only windows and doors
  • Only exterior wall assemblies
  • Only roof assemblies Who is responsible for preparing the SDS? - ....🔰VERIFIED ANSWERS.... ✔✔The chemical manufacturer Project includes everything but: - ....🔰VERIFIED ANSWERS.... ✔✔Annual office staff salaries True or False "White goods" include water heater, refrigerator, kitchen stoves, dishwashers, washing machines, and clothes dryers. - ....🔰 VERIFIED ANSWERS.... ✔✔True Under the completed contract method (CCM), these are deferred until the project is complete except:
  • All of these are deferred until completion
  • Profits of losses
  • Revenue
  • Costs - ....🔰VERIFIED ANSWERS.... ✔✔- All of these are deferred until completion
  • Profits of losses
  • Revenue
  • Costs _______________ is not part of the Project Closeout process - ....🔰 VERIFIED ANSWERS.... ✔✔Posting formal notice of the site safety rules. The income statement, cash flow statement, and balance sheet are your business's "______________" - ....🔰VERIFIED ANSWERS.... ✔✔Report cards Minor labels is a less expensive permitting process available only to: - ....🔰VERIFIED ANSWERS.... ✔✔Licensed plumbing and electrical contractors. The building Code Division is supported by _____ committees.
  • ....🔰VERIFIED ANSWERS.... ✔✔ 7 A commercial specialty contractor level 1 endorsement requires a minimum of _______ years of experience / qualifying substitute education. - ....🔰VERIFIED ANSWERS.... ✔✔ 8 A small commercial structure is:
  • All of these are small commercial structures
  • Any appurtenance to a small commercial structure
  • A nonresidential structure with a ground area of 10,000 square feet or less and the structure is not more than 20 feet tall

To file a complaint, an owner of a new structure has: - ....🔰 VERIFIED ANSWERS.... ✔✔One year after the date the structure was first occupied or two years after completion (whichever is first) Complaints are accepted only when specific relationships exist, including:

  • All of these are qualifying relationships
  • The respondent contractor must have been licensed during all or part of the work period
  • A direct contract relationship between the party filing the complaint and the contractor
  • An employment relationship between the complainant and the employer - ....🔰VERIFIED ANSWERS.... ✔✔- All of these are qualifying relationships
  • The respondent contractor must have been licensed during all or part of the work period
  • A direct contract relationship between the party filing the complaint and the contractor
  • An employment relationship between the complainant and the employer True or False A material or equipment supplier can file a complaint through the CCB against a licensed contractor for non-payment of materials purchased. - ....🔰VERIFIED ANSWERS.... ✔✔True

True or False The CCB will accept and determine damages against an unlicensed contractor. - ....🔰VERIFIED ANSWERS.... ✔✔False True or False AN exempt contractor may employ as many individuals as desired regardless as to whether the employees are family members. - ....🔰VERIFIED ANSWERS.... ✔✔False Which of the following individuals is NOT required to have a contractor's license?

  • None of these are required to have a contractor's license
  • An owner who contracts for work to be performed by a licensed contractor
  • A registered architect
  • A licensed landscape contractor building a deck - ....🔰VERIFIED ANSWERS.... ✔✔- None of these are required to have a contractor's license
  • An owner who contracts for work to be performed by a licensed contractor
  • A registered architect
  • A licensed landscape contractor building a deck A residential contractor who has been licensed for four years must take a total of _________ hours of training which may include construction business practices, safety and codes. - ....🔰 VERIFIED ANSWERS.... ✔✔ 16
  • Limited Liability Companies - ....🔰VERIFIED ANSWERS.... ✔✔- Sole Proprietorships
  • Partnerships
  • All of these forms are available
  • Limited Liability Companies Corporation forms considered for small businesses include types:
  • ....🔰VERIFIED ANSWERS.... ✔✔"C" and "S" True or False Your business entity form has little impact on your business.
  • ....🔰VERIFIED ANSWERS.... ✔✔False A person is disqualified from receiving unemployment benefits for any of the these except:
  • A single controlled substance abuse violation if that person is participating in a recognized drug rehabilitation program
  • Misconduct
  • Multiple controlled substance abuse violations in a 12-month period
  • Voluntarily abandoning the job without good cause - ....🔰 VERIFIED ANSWERS.... ✔✔A single controlled substance abuse violation if that person is participating in a recognized drug rehabilitation program When an employer discharges an employee or terminates by mutual agreement, all of the employee's unpaid wages must be

paid by: - ....🔰VERIFIED ANSWERS.... ✔✔End of the next business day following discharge or termination The form used for documenting an employee's eligibility to work is called: - ....🔰VERIFIED ANSWERS.... ✔✔I- True or False Collecting workers' compensation requires an injured employee to prove the employer was at fault for the injury. - ....🔰VERIFIED ANSWERS.... ✔✔False The Oregon Family and Medical Leave Act (OFLA), provides upaid leave of absence for up to 12 weeks to eligible employees of Oregon employers for certain family and medical reasons. Eligible employees may request OFLA leave for which of the following qualifying purposes? - ....🔰VERIFIED ANSWERS.... ✔✔Leave for serious health conditions Questions you should not ask in an interview include all except:

  • ....🔰VERIFIED ANSWERS.... ✔✔How many years' experience do you have in your field? There are requirements as to when and how an employer may take deductions from an employees' paycheck. Which of the following is an allowed deduction? - ....🔰VERIFIED ANSWERS.... ✔✔Charitable Contributions Which of these is NOT a sound job site rule policy?

A valid offer requires three things. Which of the following is one of those requirements? - ....🔰VERIFIED ANSWERS.... ✔✔Intent Damages are limited to those which are foreseeable. Which of the following examples exhibits an unforeseeable damage? - ....🔰 VERIFIED ANSWERS.... ✔✔Homeowner suffers from a heart attack which can be attributed to stress induced by the contractor's poor craftsmanship in building a new home. The most common form of construction contracting is called:

  • ....🔰VERIFIED ANSWERS.... ✔✔Single Prime One of the four elements of contract law is - ....🔰VERIFIED ANSWERS.... ✔✔Consideration Contracts with residential property owners for over ___________ must be in writing under CCB rules. - ....🔰VERIFIED ANSWERS.... ✔✔$2, If a contractor solicits his services at the conusmer's home, the buyer has _____ days to cancel the contract. - ....🔰VERIFIED ANSWERS.... ✔✔3 days What are the advantegs to progress payments?
  • Protect the owner by holding the contractor responsible for following the planned schedule.
  • All of these are correct
  • Protect both Parties in the event of a contract breach on either side.
  • Allow the contractor to pay for labor and materials expenditures as they occur. - ....🔰VERIFIED ANSWERS.... ✔✔- Protect the owner by holding the contractor responsible for following the planned schedule.
  • All of these are correct
  • Protect both Parties in the event of a contract breach on either side.
  • Allow the contractor to pay for labor and materials expenditures as they occur. The CCB is Governed by a ____#___ member board appointed by the Governor and confirmed by the Oregon State Senate.
  • 8
  • 9
  • 10
  • 7 - ....🔰VERIFIED ANSWERS.... ✔✔ 9 Contractors who have both endorsements need to fulfill the continuing education requirements:
  • For commercial contractors only (with residential credits counting toward the commercial requirements)
  • Fully and separately for each endorsement
  • For residential requirements only.
  • For commercial-specific course only - ....🔰VERIFIED ANSWERS.... ✔✔For commercial contractors only (with

If the license is currently active, or the contractor wants to reactivate an inactive license, the following must be on file in order to renew:

  • A current Certificate of Insurance in the proper amount
  • All of these are needed
  • Evidence of completed continuing education
  • A current bond in the proper amount - ....🔰VERIFIED ANSWERS.... ✔✔All of these are needed Items to include in a Project Manuel generally would include all except:
  • Employee personnel files
  • Change orders
  • Supplements & addenda to bids
  • Invitation to bid - ....🔰VERIFIED ANSWERS.... ✔✔Employee personnel files The owner of an existing structure can file a complaint regarding construction within one year after the date:
  • Payment for the job clears
  • Hiring the contractor
  • Discovering the problem
  • The work was substantially complete - ....🔰VERIFIED ANSWERS.... ✔✔The work was substantially complete A commercial specialty contractor level 1 is a contractor whose business:
  • Requires the use of two or fewer unrelated business trades and who undertakes or offers to undertake work in connection with residential or small commercial structures
  • Is developing that is zoned for a intended for use compatible with a residential or small commercial structure
  • Requires use of two or fewer unrelated business trades and who undertakes or offers to undertake work in connection with small or large commercial structures
  • (including subcontractors) requires the use of more than two unrelated business trades and who undertake or offers to undertake work in connection with small or large commercial structure - ....🔰VERIFIED ANSWERS.... ✔✔Requires use of two or fewer unrelated business trades and who undertakes or offers to undertake work in connection with small or large commercial structures True or False Exempt commercially endorsed contractors are NOT required to have worker's comp insurance with personal election coverage
  • ....🔰VERIFIED ANSWERS.... ✔✔False An employee/person is NOT disqualified from unemployment benefits if:
  • The person was dismissed for misconduct
  • The person was laid off
  • The person was dismissed for more than one controlled substance abuse in a 12-month span
  • The person voluntarily left without good cause - ....🔰VERIFIED ANSWERS.... ✔✔The person was laid off