NICET Highway Construction Level 1 & 2 Combined Exam: 250 Q&A, Exams of Civil Engineering

A comprehensive set of 250 questions and answers covering various aspects of highway construction, including blueprint views, surveying, soil testing, concrete, drainage, and more. It is designed to help individuals prepare for the nicet highway construction level 1 & 2 combined certification exam. Multiple-choice questions, true/false statements, and short answer questions, providing a thorough review of key concepts and principles.

Typology: Exams

2024/2025

Available from 04/16/2025

purity-kauri
purity-kauri 🇺🇸

1.1K documents

1 / 48

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
NICET HIGHWAY CONSTRUCTION LEVEL1&2
COMBINED CERTIFICATION EXAM 2025/REAL
250Qs&As|LATEST UPDATE|A+GRADE
3 Types of Blueprint Views
1. Plan View
2. Elevation or Profile View
3. Cross-Section View
What is Plan View?
View from above
What is the profile view?
View from the front or the side
What is the cross-section
view?
Views as if the object has been cut open
What is the first sheet in a set of project plans?
Title or key sheet
What do typical section sheets show?
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21
pf22
pf23
pf24
pf25
pf26
pf27
pf28
pf29
pf2a
pf2b
pf2c
pf2d
pf2e
pf2f
pf30

Partial preview of the text

Download NICET Highway Construction Level 1 & 2 Combined Exam: 250 Q&A and more Exams Civil Engineering in PDF only on Docsity!

NICET HIGHWAY CONSTRUCTION LEVEL1& 2

COMBINED CERTIFICATION EXAM 2025/REAL

250Qs&As|LATEST UPDATE|A+GRADE

3 Types of Blueprint Views

  1. Plan View
  2. Elevation or Profile View
  3. Cross-Section View What is Plan View? View from above What is the profile view? View from the front or the side What is the cross-section view? Views as if the object has been cut open What is the first sheet in a set of project plans? Title or key sheet What do typical section sheets show?

They show the different layers of the road and side slopes and ditches for a particular given length. What is a plan detail? A detail is a view of a very specific item of work T/F Typical Section Sheets show elevation views of the proposed road. False. The answer is "Profile Sheets" The shape of the road's side slopes and ditches are found on which sheet? " Typical Section Sheets" T/F The directional arrow is found on the "Profile Sheet" False. "Plan Sheets" also called "Key Sheet" Which sheet depicts the cross-section view of the road superimposed on the natural ground line? Cross-Section sheets. What is the diameter, in inches, of a #8, Re- Bar? 8 divided by 8 = 1.00" Station 21+00 is what distance from Station 23+00? 200 Is 21+00 Up Station or Back Station from 23+00? Back Station What is "Cross-Slope"?

A survey rod reads like a tape measure. It allows the surveyor to record an observed number so that an elevation can be determined. What is a Vernier? A "Vernier" is used on a survey rod and is used to determine the subdivision of the smallest division of the smallest division of a scale. Can the terms "Transit" and "Level" be used synonymously? No. A Transit can measure vertical angles whereas a level cannot. When looking through a level, what are the 4 different hair lines that you will see called? Upper Stadia, Middle Cross / Middle Stadia, Lower Stadia and Vertical Cross. What are Benchmarks? Benchmarks are fixed exact points where an exact elevation is known. What is "Back Sight"? Back Sight is a rod reading taken on a point of know elevation. What is "Height of Instrumentation" (HI) is the elevation of the line of sight projected by the instrument. What is "Fore Sight" (FS)? Foresight is a rod reading taken on any point to determine it's elevation. What is "Turning Point" (TP)? Turning Point is a reliable point upon which a foresight is taken to establish elevation.

A steel tape is used to measure the length between points "A" & "B" and the distance is found to be 95'. The temperature of the tape at the time of measurement is 45 degrees (F). If the tape is calibrated for 68 degrees (F) and no other factors are to be considered, is the measurement correct? Short or long? Why? The measurement will be too long. The tape shrunk due to the cold and principles of "Coefficient of Expansion". What is the typical tension required on a 100' steel tape? 25 LBS If a steel tape is held "off-line", is the measurement accurate? No. When measuring, tapes must be held on-line, if not, errors will occur in the actual measurement. Name the 9 most common errors that occur when measuring with tapes. Length other than standard, improper plumbing, temperature other than standard, poor alignment, tape not being horizontal (level), sagging, faulty marking, incorrect reading or interpolation. What are Catch Points? CP occur at the intersection of the existing ground and the constructed grade. The amount of cut or fill is determined by the difference between the roadway elevation and the original ground elevation. Name the 3 types of Contour Lines. Index, Intermediate and Supplementary.

A Contour Line connects all points of equal elevation, above or below a known or assumed reference point or plane. How is a depression shown on a Topo Map? Hachure or tick marks that are on the inside of contour circles denote a depression. What are the "4 Rules" of Contour Lines?

  1. All points along the same contour line are on the same elevation. 2. All contour lines eventually connect. 3. Contour lines never cross each other. 4. Contour lines never split What instrument is used to determine the area of a Topo Map? Plainmeter The farther contour lines are apart, the the slope. Flatter or less. T or F? When determining elevation of an Intermediate Contour line always start at the furthest Index Contour line. False. Start at the closest Index Contour. Define "Benchmark". A Benchmark is a fixed exact point where an exact elevation is known. T/F? Slope & drainage is always calculated parallel to the contour lines. False. Perpendicular. In soil testing, the test used to determine the ratio of the weight of a given volume of material to the weight of an equal volume water is known as? Density Check What is the water cement ratio? Weight of water / weight of

cement. What is "Wet Sieve" Used to separate fine grain from coarse grain. It carried out by washing the soil specimen on a 60pm sieve mesh.

Open graded. Trees to be saved within the R-O-W should be marked by? The Construction Engineer. Grubbing includes?

Removal of stumps, roots and stubs. Before beginning earthwork, it is important to? Verify location of underground utilities through local one call system. When backfilling culverts and storm drains, lifts are not to exceed? 6 inches. Backfill for pipes and culverts consist of? Granular materials. For fences erected on a slope, the posts are to be set in what position? Plumb Plans required a 42" high fence. If the posts are 6' long, how much of the post is in the ground? 6' x 12 = 72 72" - 42" = 30" Fence corners are strengthened by? Horizontal post and tension wire. Why are the line braces installed in long sections of fence? To retain tension at elevation changes. What is important when inspecting concrete barrier? Alignment Guardrail is 25' long. What is the center spacing of the posts if mounted on 8 posts? 8 posts means 7 spaces. 25' / 7 = 3.57' How is the thickness of paint measured? Mils

100' x 3' x 2 sides = 600 SF 12" x 2 (top and bottom) x 100' x 2 Flanges = 400 SF Total - 1000 SF Paint weighs 20lbs per gallon. If a bridge requires 200 lbs of paint and so far only 125 lbs of paint has been applied, what is the percentage completed? 125 divided by 200 =. (or 62.5% complete) What is the protective surface treatment for a concrete bridge deck? White membrane curing compound. What is the purpose of using vibrators in concrete? Consolidation Sealer treatment can be applied without being hard, even if the concrete is? Still green Excessive vibration of concrete causing the top to become white, chalky and non durable is called? Laitance The main reason for applying liquid membrane forming compound on concrete is? Preventing loss of water during early curing. The main reason for white reflective concrete covering is? Reduce temperature in concrete and reflect the sun's heat. What does a screed do? Removes excess concrete from the surface of freshly placed concrete.

If told in the above problem the specifications requires a 30% increase in the quantity for the protective coating, how many gallons are required? 84.4 gallons x 1.30 = 109. gallons Concrete pipe should be placed?

dry soil particles. Define Optimum Moisture Content? The degree or percentage of moisture in soil at which the soil can be compacted to it's greatest density.

What are the ACI testing procedures? Temp, Air by Volumetric method, Air Content by Pressure method, Slump, Unit Weight and Cylinders. Slope stakes are set using which instrument? Level Horizon and vertical angle may be measured by? Transit Sum four distances: 66 ft + 6.600 ft + 66 inches + 6.6 inches 78.65 fT What does the letter "D" mean if referring to the alignment of a road? Degree of curvature. Regulatory Traffic Signs are typically? Black letters on white background. The sides of trenches need to be shored, braced or sloped if the excavation exceeds? 5 feet The contractor is responsible for which OSHA requirements? All What is inspection's first priority? The safety of the public OSHA requires nets to be placed under work when work is how many feet above the ground or water? 25 feet

Orange and white The standard height of Type 1 and Type II construction barricades is? 3 Feet The minimum height of construction signs on a temporary movable support is? 6 Feet Where should advanced construction warning signs be placed on a highway? 1 mile How do you best relieve the pain of a first and 2nd degree burn? Soak in cold water What type of fire extinguisher should NOT be used to extinguish a burning gasoline fire? Dry chemical T / F? All injured victims should be treated for shock. False A tandem 2 wheel roller used for compacting asphalt weighs approximately? Varies from 2 - 8 tons. An asphalt mix may flatten in a truck during delivery due to? Excessive asphalt in the mix or if the mix is too hot. A stiff asphalt mix is caused by? The mix being too cold. How many feet in a mile? 5280 feet in a mile After the project no longer needs temp pavement markings, what should be done with them? Temporary pavement marking should be eradicated and permanent markings should be installed.

Which document is a standard for construction barricades, protective devices and warning signs? MUTCD What is an inspector to do after the contractor has placed signage to route traffic on a temporary rd? Record the signage, compare against the plans and continue to check the signage regularly. Fertilizer application rate for a flat surface is how many lbs per acre? Check the spec. 800lbs per acre How can a contractor assure that there will be adequate amounts of topsoil on a job? Through the use of Cross-Sections. Compare current Cross Section condition and compare against the original. When stockpiling topsoil on a site, stockpiles should? Keep away from trees, away from drainage and in a centrally located location. Clearing and grubbing on a rural 2 lane highway will normally be paid by? Acres The beam supporting the masonry over an opening in a wall is? Lintel What measures surface irregularities on a gauge as it is pushed along the surface? Rolling straight edge The requirements for compliance with environmental consideration can be found? Contract documents, plans and specs