Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
NFPA 24 Test (TFM10) Exam Questions and Answers (Latest Update 2023-2024) (30 Qs)
Typology: Exams
1 / 5
This page cannot be seen from the preview
Don't miss anything!
This standard shall apply to ______ intended to carry water for fire service mains - correct answers ✅Combined Service Mains Working plans shall be submitted for approval to the _____ before any equipment is installed or remodeled. - correct answers ✅AHJ ____ shall not be used - correct answers ✅Pressure-Regulating devices ______ shall not be installed in the piping from the fire department connection to the fire service main - correct answers ✅Control Valves _____ shall be permitted in the system downstream of the fire department connection - correct answers ✅Control Valves When more than one water supply exists, a ___________ shall be installed in each connection - correct answers ✅Check Valve All check valves shall have a ________ installed upstream and downstream of the check valve. - correct answers ✅Control Valve
A post indicator valve installed not less than____ from the building - correct answers ✅40 ft Where post indicator valves are used, they shall be set so that the top of each post is _______ above final grade - correct answers ✅32-40 inches Supervision of underground gate valves with roadway boxes shall ____________ - correct answers ✅not be required The connection from the hydrant to the main shall ___________ - correct answers ✅not be less than 6 inches Hydrants shall be located _________ from the buildings to be protected - correct answers ✅not less than 40 ft Hydrants shall be installed on __________ - correct answers ✅flat stones, concrete slabs, or other approved material
Private fire service mains installed under driveways or roadways shall be buried at a ______________ - correct answers ✅minimum depth of 36 inches Where private fire mains extend more than 10 ft into the building, they shall be ___________ - correct answers ✅run in a covered trench Thrust blocks shall be concrete of a mix not leaner than ______________ - correct answers ✅1 part cement, 2 1/2 parts sand, and 5 parts stone Rods shall be _____________ - correct answers ✅not less than 5/8 in diameter After installation, rods, nuts, bolts, washers, clamps, and other restraining devices _____________________ - correct answers ✅shall be cleaned and thoroughly coated with a bituminous or other acceptable corrosion- retarding material Pipe shall be _____________________ - correct answers ✅restrained at the bottom of a hill and at any lateral or vertical turns
Bell ends shall be __________ - correct answers ✅facing uphill The flushing operation shall continue until water flow is verified to be ___________ - correct answers ✅clear of debris The installing contractor shall be responsible for _______________________