BAL-001-0.1a - ✔✔Real Power Balancing Control Performance BAL-STD-002-0 - ✔✔Operating Reserves (WECC) BAL-003-0.1b - ✔✔Frequency Response and Bias BAL-004-0 - ✔✔Time Error Correction BAL-004-WECC-01 - ✔✔Automatic Time Error Correction BAL-005-0.1b - ✔✔Automatic Generation Control BAL-006-2 - ✔✔Inadvertent Interchange COM-001-1.1 - ✔✔Telecommunications COM-002-2 - ✔✔Communications and Coordination

Typology: Exams

2024/2025

Available from 06/29/2025

WINGS_TO-FLY
WINGS_TO-FLY 🇺🇸

1

(1)

1.1K documents

1 / 10

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
NERC Reliability Standard numbers and titles Exam | Actual Questions and
Answers Latest Updated 2025/2026 (Graded A+)
BAL-001-0.1a - ✔✔Real Power Balancing Control Performance
BAL-STD-002-0 - ✔✔Operating Reserves (WECC)
BAL-003-0.1b - ✔✔Frequency Response and Bias
BAL-004-0 - ✔✔Time Error Correction
BAL-004-WECC-01 - ✔✔Automatic Time Error Correction
BAL-005-0.1b - ✔✔Automatic Generation Control
BAL-006-2 - ✔✔Inadvertent Interchange
COM-001-1.1 - ✔✔Telecommunications
COM-002-2 - ✔✔Communications and Coordination
CIP-001-1a - ✔✔Sabotage Reporting
CIP-002-3 - ✔✔Cyber Security - Critical Cyber Asset Identification
CIP-003-3 - ✔✔Cyber Security - Security Management Controls
CIP-004-3 - ✔✔Cyber Security - Personnel & Training
pf3
pf4
pf5
pf8
pf9
pfa

Partial preview of the text

Download NERC Reliability Standard numbers and titles Exam | Actual Questions and Answers 2025/2026 and more Exams Electrical Engineering in PDF only on Docsity!

NERC Reliability Standard numbers and titles Exam | Actual Questions and

Answers Latest Updated 202 5 /202 6 (Graded A+)

BAL- 001 - 0.1a - ✔✔Real Power Balancing Control Performance BAL-STD- 002 - 0 - ✔✔Operating Reserves (WECC) BAL- 003 - 0.1b - ✔✔Frequency Response and Bias BAL- 004 - 0 - ✔✔Time Error Correction BAL- 004 - WECC- 01 - ✔✔Automatic Time Error Correction BAL- 005 - 0.1b - ✔✔Automatic Generation Control BAL- 006 - 2 - ✔✔Inadvertent Interchange COM- 001 - 1.1 - ✔✔Telecommunications COM- 002 - 2 - ✔✔Communications and Coordination CIP- 001 - 1a - ✔✔Sabotage Reporting CIP- 002 - 3 - ✔✔Cyber Security - Critical Cyber Asset Identification CIP- 003 - 3 - ✔✔Cyber Security - Security Management Controls CIP- 004 - 3 - ✔✔Cyber Security - Personnel & Training

CIP- 005 - 3a - ✔✔Cyber Security - Electronic Security Perimeter(s) CIP- 006 - 3c - ✔✔Cyber Security — Physical Security of Critical Cyber Assets CIP- 007 - 3 - ✔✔Cyber Security - Systems Security Management CIP- 008 - 3 - ✔✔Cyber Security - Incident Reporting and Response Planning CIP- 009 - 3 - ✔✔Cyber Security - Recovery Plans for Critical Cyber Assets EOP- 001 - 0 - ✔✔Emergency Operations Planning EOP- 003 - 1 - ✔✔Load Shedding Plans EOP- 004 - 1 - ✔✔Disturbance Reporting EOP- 005 - 1 - ✔✔System Restoration Plans EOP- 006 - 1 - ✔✔Reliability Coordination - System Restoration EOP- 008 - 0 - ✔✔Plans for Loss of Control Center Functionality EOP- 009 - 0 - ✔✔Documentation of Blackstart Generating Unit Test Results FAC- 001 - 0 - ✔✔Facility Connection Requirements FAC- 003 - 1 - ✔✔Transmission Vegetation Management Program

INT- 010 - 1 - ✔✔Interchange Coordination Exemptions IRO- 001 - 1.1 - ✔✔Reliability Coordination - Responsibilities and Authorities IRO- 003 - 2 - ✔✔Reliability Coordination - Wide-Area View IRO- 004 - 1 - ✔✔Reliability Coordination - Operations Planning IRO-STD- 006 - 0 - ✔✔Qualified Path Unscheduled Flow Relief (WECC) IRO- 014 - 1 - ✔✔Procedures, Processes, or Plans to Support Coordination Between Reliability Coordinators IRO- 015 - 1 - ✔✔Notifications and Information Exchange Between Reliability Coordinators IRO- 016 - 1 - ✔✔Coordination of Real-time Activities Between Reliability Coordinators MOD- 001 - 1a - ✔✔Available Transmission System Capability MOD- 004 - 1 - ✔✔Capacity Benefit Margin MOD- 008 - 1 - ✔✔Transmission Reliability Margin Calculation Methodology MOD- 010 - 0 - ✔✔Steady-State Data for Modeling and Simulation of the Interconnected Transmission System MOD- 012 - 0 - ✔✔Dynamics Data for Modeling and Simulation of the Interconnected Transmission System

MOD- 016 - 1.1 - ✔✔Documentation of Data Reporting Requirements for Actual and Forecast Demands MOD- 017 - 0.1 - ✔✔Aggregated Actual and Forecast Demands and Net Energy for Load MOD- 018 - 0 - ✔✔Treatment of Nonmember Demand Data and How Uncertainties are Addressed in the Forecasts of Demand and Net Energy for Load MOD- 019 - 0.1 - ✔✔Reporting of Interruptible Demands and Direct Control Load Management MOD- 020 - 0 - ✔✔Providing Interruptible Demands and Direct Control Load Management Data to System Operators and Reliability Coordinators MOD- 021 - 1 - ✔✔Documentation of the Accounting Methodology for the Effects of Demand-Side Management in Demand and Energy Forecasts MOD- 028 - 1 - ✔✔Area Interchange Methodology MOD- 029 - 1a - ✔✔Rated System Path Methodology MOD- 030 - 2 - ✔✔Flowgate Methodology NUC- 001 - 2 - ✔✔Nuclear Plant Interface Coordination PER- 001 - 0.1 - ✔✔Operating Personnel Responsibility and Authority PER- 002 - 0 - ✔✔Operating Personnel Training PER- 003 - 0 - ✔✔Operating Personnel Credentials

PRC- 016 - 0.1 - ✔✔Special Protection System Misoperations PRC- 017 - 0 - ✔✔Special Protection System Maintenance and Testing PRC- 018 - 1 - ✔✔Disturbance Monitoring Equipment Installation and Data Reporting PRC- 021 - 1 - ✔✔Under-Voltage Load Shedding Program Data PRC- 022 - 1 - ✔✔Under-Voltage Load Shedding Program Performance PRC- 023 - 1 - ✔✔Transmission Relay Loadability TOP- 001 - 1 - ✔✔Reliability Responsibilities and Authorities TOP- 002 - 2a - ✔✔Normal Operations Planning TOP- 004 - 2 - ✔✔Transmission Operations TOP- 007 - 0 - ✔✔Reporting System Operating Limit (SOL) and Interconnection Reliability Operating Limit (IROL) Violations TOP- 008 - 1 - ✔✔Response to Transmission Limit Violations TPL- 001 - 0.1 - ✔✔System Performance Under Normal (No Contingency) Conditions (Category A) TPL- 002 - 0a - ✔✔System Performance Following Loss of a Single Bulk Electric System Element (Category B)

TPL- 003 - 0a - ✔✔System Performance Following Loss of Two or More Bulk Electric System Elements (Category C) TPL- 004 - 0 - ✔✔System Performance Following Extreme Events Resulting in the Loss of Two or More Bulk Electric System Elements (Category D) VAR- 002 - 1.1b - ✔✔Generator Operation for Maintaining Network Voltage Schedules BAL- 002 - 1 - ✔✔Disturbance Control Performance EOP- 002 - 3 - ✔✔Capacity and Energy Emergencies EOP- 005 - 2 - ✔✔System Restoration from Blackstart Resources (Effective 7/1/2013) EOP- 006 - 2 - ✔✔System Restoration Coordination (Effective 7/1/2013) EOP- 008 - 1 - ✔✔Loss of Control Center Functionality (Effective 7/1/2013) FAC- 002 - 1 - ✔✔Coordination of Plans For New Generation, Transmission, and End-User Facilities FAC- 501 - WECC- 1 - ✔✔Transmission Maintenance IRO- 002 - 2 - ✔✔Reliability Coordination - Facilities IRO- 005 - 3a - ✔✔Reliability Coordination - Current Day Operations

VAR- 002 - WECC- 1 - ✔✔Automatic Voltage Regulators (AVR) (WECC) VAR- 501 - WECC- 1 - ✔✔Power System Stabilizer (PSS) (WECC)