EDE - ✔✔Energy Deficient Entity Ime - ✔✔meter error DCS - ✔✔Disturbance Control Standard DFRs - ✔✔Digital Fault Recorder LOFT - ✔✔Linear on the fly testing SCADA - ✔✔Supervisory Control and Data Acquisition EMS - ✔✔Emergency Management System

Typology: Exams

2024/2025

Available from 06/29/2025

WINGS_TO-FLY
WINGS_TO-FLY 🇺🇸

1

(1)

1.1K documents

1 / 8

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
NERC Final Exam | Actual Questions and Answers Latest Updated 2025/2026
(Graded A+)
EDE - ✔✔Energy Deficient Entity
Ime - ✔✔meter error
DCS - ✔✔Disturbance Control Standard
DFRs - ✔✔Digital Fault Recorder
LOFT - ✔✔Linear on the fly testing
SCADA - ✔✔Supervisory Control and Data Acquisition
EMS - ✔✔Emergency Management System
SPS - ✔✔Special Protection Systems
ACE - ✔✔Area Control Error
Fs - ✔✔frequency Schedule
RCIS - ✔✔Reliability Coordinator Information System
IDC - ✔✔Interchange Distribution Calculator
pf3
pf4
pf5
pf8

Partial preview of the text

Download NERC Final Exam | Actual Questions and Answers Latest Updated 2025/2026 (Graded A+) and more Exams Electrical Engineering in PDF only on Docsity!

NERC Final Exam | Actual Questions and Answers Latest Updated 202 5 /202 6

(Graded A+)

EDE - ✔✔Energy Deficient Entity Ime - ✔✔meter error DCS - ✔✔Disturbance Control Standard DFRs - ✔✔Digital Fault Recorder LOFT - ✔✔Linear on the fly testing SCADA - ✔✔Supervisory Control and Data Acquisition EMS - ✔✔Emergency Management System SPS - ✔✔Special Protection Systems ACE - ✔✔Area Control Error Fs - ✔✔frequency Schedule RCIS - ✔✔Reliability Coordinator Information System IDC - ✔✔Interchange Distribution Calculator

PSE - ✔✔Purchasing Selling Entity NOAA - ✔✔National Oceanic Atmospheric Administration NIS - ✔✔Net Interchange Scheduled NIA - ✔✔Net Interchange Actual ISN - ✔✔Interegional Security Network TOP - ✔✔Transmission Operator RC - ✔✔Reliability Coordinator AGC - ✔✔Automatic Generation Control ERO - ✔✔Energy Reliability Organization IA - ✔✔Interchange Authority UVLS - ✔✔Under Voltage Load Shedding UFLS - ✔✔Under frequency Load Shedding DOE - ✔✔Department of Energy TSP - ✔✔Transmission Service Provider

EHV - ✔✔Extra high voltage Dfax - ✔✔Power distribution factor TTC - ✔✔Total Transfer Capability LTC - ✔✔Load tap changer TLR - ✔✔Transmission Load Relief BTU - ✔✔British thermal unit CEH - ✔✔Continuing education hours FRM - ✔✔firm TO - ✔✔Transmission owner GO - ✔✔Generator Owner GOP - ✔✔Generator Operator DP - ✔✔distribution provider SIL - ✔✔Surge Impedance Limit BUCC - ✔✔Backup Control Center

SF6 - ✔✔Sulfer Hexafluoride Transformer CT - ✔✔Current transformer or combustion turbine EL - ✔✔Emergency Limit NERC - ✔✔North American Electric Reliability Corporation STL - ✔✔Short term limit LTL - ✔✔long term limit NL - ✔✔normal limit SOL - ✔✔system operating limit LSE - ✔✔load sharing entity AVR - ✔✔Automatic Voltage Regulator ATC - ✔✔Available Transfer Capability RSG - ✔✔Reserve sharing group CA - ✔✔Contingency Analysis BT - ✔✔Balancing Interchange Transmission Operator

COM - ✔✔communications BES - ✔✔Bulk Electrical Systems ISN - ✔✔Interregional Security Network VAR - ✔✔Voltage and Reactive IROL - ✔✔Interconnector Reliability Operations Limits INT - ✔✔interchange scheduling and coordination PRC - ✔✔protection and control BAL - ✔✔resource and demand balancing LODF - ✔✔line outage distribution factor BI - ✔✔Balancing Interchange operator RTU - ✔✔remote terminal unit BS - ✔✔blackstart EOP - ✔✔emergency operations PST - ✔✔phase shifting transformer

NF - ✔✔non firm