NERC Exam | Actual Questions and Answers Latest Updated 2025/2026 (Graded A+), Exams of Electrical Engineering

What is the calculation used for determining inadvertent interchange? - ✔✔Net actual interchange minus net scheduled interchange Which of the following would be a suitable use for a pseudo-tie? - ✔✔Accounting for jointly owned generators

Typology: Exams

2024/2025

Available from 06/29/2025

WINGS_TO-FLY
WINGS_TO-FLY 🇺🇸

1

(1)

1.1K documents

1 / 2

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
NERC Exam | Actual Questions and Answers Latest Updated 2025/2026
(Graded A+)
What is the calculation used for determining inadvertent interchange? - ✔✔Net actual interchange
minus net scheduled interchange
Which of the following would be a suitable use for a pseudo-tie? - ✔✔Accounting for jointly owned
generators
Which of the following entities may a Balancing Area provide interchange transaction information to? -
✔✔PSEs involved in the transaction
Which of the following elements are NOT contained in the interchange transaction TAG? - ✔✔Cost
A Balancing Authority can only implement interchange schedules with which one of the following? -
✔✔Adjacent Balancing Authorities
Which of the following must be agreed on by the Sending and Receiving Balancing Authorities? 1.
Interchange Schedule start and end time 2. Energy profile 3. Ramp start time and duration 4. Constraints
- ✔✔1, 2, & 3
Which of the following are responsible for confirming the ramp times and duration for interchange
transactions? 1. Sending Balancing Authority 2. Transmission Service Provider 3. Receiving Balancing
Authority 4. Scheduling Agent - ✔✔1 & 3
Which of the following information is NOT necessary for a system operator to know in order to
implementan interchange schedule? - ✔✔Source generator
If Balancing Area A has an interchange schedule export of 200 MW to Balancing Area B that started on
the hour, what would be the hourly integrated value for the transaction if the schedule were reduced to
100 MWon the half hour? - ✔✔150
pf2

Partial preview of the text

Download NERC Exam | Actual Questions and Answers Latest Updated 2025/2026 (Graded A+) and more Exams Electrical Engineering in PDF only on Docsity!

NERC Exam | Actual Questions and Answers Latest Updated 202 5 /202 6

(Graded A+)

What is the calculation used for determining inadvertent interchange? - ✔✔Net actual interchange minus net scheduled interchange Which of the following would be a suitable use for a pseudo-tie? - ✔✔Accounting for jointly owned generators Which of the following entities may a Balancing Area provide interchange transaction information to? - ✔✔PSEs involved in the transaction Which of the following elements are NOT contained in the interchange transaction TAG? - ✔✔Cost A Balancing Authority can only implement interchange schedules with which one of the following? - ✔✔Adjacent Balancing Authorities Which of the following must be agreed on by the Sending and Receiving Balancing Authorities? 1. Interchange Schedule start and end time 2. Energy profile 3. Ramp start time and duration 4. Constraints

  • ✔✔1, 2, & 3 Which of the following are responsible for confirming the ramp times and duration for interchange transactions? 1. Sending Balancing Authority 2. Transmission Service Provider 3. Receiving Balancing Authority 4. Scheduling Agent - ✔✔1 & 3 Which of the following information is NOT necessary for a system operator to know in order to implementan interchange schedule? - ✔✔Source generator If Balancing Area A has an interchange schedule export of 200 MW to Balancing Area B that started on the hour, what would be the hourly integrated value for the transaction if the schedule were reduced to 100 MWon the half hour? - ✔✔ 150

If Balancing Area A has the following schedules (100 MW import, 50 MW export, 100 MW import, 75 MW import), what is the net schedule interchange for the area? - ✔✔ 225 MW into Balancing Area A Which of the following is responsible initiating the implementation of each Interchange Transaction as tagged? - ✔✔Sink Balancing Authority According to NERC Standards, which of the following is responsible for ensuring that transaction tags are submitted? - ✔✔Load-serving PSE