

Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
NERC Certification Exam Questions | Actual Questions and Answers Latest Updated 2024/2025 (Graded A+) Which of the following represents a virtual tie-line updated in real time? - ✔✔pseudo-tie Balancing Areas shall analyze forecasted generation availability and reserve levels, and inform their reliability coordinators of actual or potential generation deficiencies each: - ✔✔day Balancing authorities that share jointly owned generation must include their share of the uni
Typology: Exams
1 / 2
This page cannot be seen from the preview
Don't miss anything!
Which of the following represents a virtual tie-line updated in real time? - ✔✔pseudo-tie Balancing Areas shall analyze forecasted generation availability and reserve levels, and inform their reliability coordinators of actual or potential generation deficiencies each: - ✔✔day Balancing authorities that share jointly owned generation must include their share of the unit governor droop response into their respective frequency bias setting if the energy is scheduled as a: - ✔✔dynamic schedule A balancing authority's frequency bias contribution is 30 MW / 0.1 Hz. What is the balancing authority's frequency response due to the external loss of 1,000 MW generator which causes system frequency to decline to 59.95 Hz? - ✔✔15 MW A system operator experiences a system failure of AGC and ACE functions. The operator's first priority should be to: - ✔✔manually calculate ACE and adjust generation to maintain scheduled interchange Interruptible loads may be dispatched to alleviate: - ✔✔capacity deficiency Telecommunication facilities that link with interconnected systems should be available to the system operator: - ✔✔on a continuous basis Initial response to frequency decline occurs from what source? - ✔✔frequency response characteristic One way to obtain load relief during a capacity emergency would be to: - ✔✔reduce voltage
When a system's anticipated operating conditions threaten the reliability of the interconnection, the system strength should be examined and: - ✔✔other systems informed through predetermined communication paths