Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

NEIEP 200 Final Practice Exam Questions and Answers, Exams of Community Corrections

A set of practice exam questions and answers for neiep 200, covering topics related to elevator installation and maintenance. The questions are multiple choice and cover a wide range of topics, including rigging, hoisting, safety equipment, and elevator components. This document can be a valuable resource for students preparing for the neiep 200 exam.

Typology: Exams

2024/2025

Available from 03/26/2025

Nurseexcel
Nurseexcel 🇺🇸

5

(1)

832 documents

1 / 13

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
1 /
13
NEIEP 200 Final Practice Exam Questions and Guaranteed Answers 100%
1. ou are about to loosen a fishplate bolt. which wrench would be least likel to slip?: a. 6
point box end wrench
b. 12 point box end wrench
c. open end wrench
2. ou are using a plumb line to check a rail for plumb. ou find that at the top it measures 1"
and at the bottom it measures 1 1/4". what does this tell ou?: a. the top of the rail needs to
go towards the center
b. the top of the rail needs to go toward the wall
c. the bottom of the rail needs to go toward the wall
3. ou are plumbing rails on a high rise installation. what tpe of plumb line should ou
use?: a. nlon string
b. monofilament wire
c. piano wire
4. ou need to cut into a concrete wall. which tool should ou use?: disc grinder with a
diamond blade disc
5. ou need to select a heav dut drill for drilling 5/8" holes in a machine beam. what
factor determines the drill rating?: chuck size
6. ou are tasked with setting 3/4" concrete anchors. which tpe of drill should ou use?:
rotar hammer
7. ou need to cut and 8ft section of 1/2" EMT conduit pipe. what would be the best tool for
the job?: hacksaw with 24 teeth per inch
8. ou are directed to move ox-acetlene clinders from a storage area to a work site.
what is the proper wa to transport them?: in an upright position
9. ou are setting up welding equipment. what is the maximum psi that the regulator
for the acetlene gas ma be adjusted to?: 10-12 psi
10. ou are using rollers to move a heav elevator machine and are approach- ing a corner.
which technique should ou use to maneuver around it?: angle front roller graduall and
continue around the corner
pf3
pf4
pf5
pf8
pf9
pfa
pfd

Partial preview of the text

Download NEIEP 200 Final Practice Exam Questions and Answers and more Exams Community Corrections in PDF only on Docsity!

1 /

NEIEP 200 Final Practice Exam Questions and Guaranteed Answers 100%

  1. ou are about to loosen a fishplate bolt. which wrench would be least likel to slip?: a. 6 point box end wrench b. 12 point box end wrench c. open end wrench
  2. ou are using a plumb line to check a rail for plumb. ou find that at the top it measures 1" and at the bottom it measures 1 1/4". what does this tell ou?: a. the top of the rail needs to go towards the center b. the top of the rail needs to go toward the wall c. the bottom of the rail needs to go toward the wall
  3. ou are plumbing rails on a high rise installation. what t pe of plumb line should ou use?: a. nẏlon string b. monofilament wire c. piano wire
  4. ou need to cut into a concrete wall. which tool should ou use?: disc grinder with a diamond blade disc
  5. ou need to select a heav dut drill for drilling 5/8" holes in a machine beam. what factor determines the drill rating?: chuck size
  6. ou are tasked with setting 3/4" concrete anchors. which t pe of drill should ou use?: rotarẏ hammer
  7. ou need to cut and 8ft section of 1/2" EMT conduit pipe. what would be the best tool for the job?: hacksaw with 24 teeth per inch
  8. ou are directed to move ox - acet lene c linders from a storage area to a work site. what is the proper wa to transport them?: in an upright position
  9. ou are setting up welding equipment. what is the maximum psi that the regulator for the acet lene gas ma be adjusted to?: 10 - 12 psi
  10. ou are using rollers to move a heav elevator machine and are approach- ing a corner. which technique should ou use to maneuver around it?: angle front roller graduallẏ and continue around the corner

2 /

  1. ou are preparing to unload a truck at the loading dock and the truck is 8" higher than the dock. what do ou do?: use a steel plate to span the gap
  2. ou just finished the surface inspection of a manila rope ou will be using for hoisting. what method should ou use to conduct an internal inspection?- : slightlẏ untwist the strands
  3. ou are preparing to hoist rails and are inspecting our manila rope. which of the following is a good characteristic of manila rope?: a light ẏellow color with a silverẏ or pearlẏ luster
  4. a mechanic attaches a chainfall to a hoisting beam with a beam clamp. what happens to the capacit of the hoisting beam?: it is reduced to 50% of original capacitẏ

4 /

  1. ou are preparing to use a chainfall to lift a load up a hoistwa . what safet equipment is required on each of the two hooks on the chain fall?: tags
  2. who can give the command to stop a hoist?: anẏone
  3. which safet feature protects against getting caught under a counter- weight?: counterweight guard

5 /

  1. ou are installing a 250 fpm freight elevator. what t pe of buffers should ou use?: oil buffers
  2. ou are working in a pit deeper than normal. what can ou do to bring the buffers up to the proper height?: buffer stands
  3. what document will tell ou if ou need buffer channels?: final laẏout
  4. when installing a reduced stroke buffer, what additional component is required?: speed limiting device
  5. ou just attached a governor tension sheave to a rail. what must be done to finalize its position?: check for plumb and tighten all bolts.
  6. ou are installing pit equip for a high rise elevator. which of the following is required for an 800 fpm car?: compensating sheave tie down
  7. ou have installed the comp rope sheave. what must ou do to prepare for comp rope install?: block the comp sheave above normal position
  8. ou are about to perform maintenance on pit equip. what is required for oil buffers?: check the oil level
  9. ou are working in a pit 72" deep. what does asme require regarding stop switches?: a second stop switch must be installed 47" above the pit floor
  10. what would ou use to connect round rails?: bushings
  11. ou are moving rails to storage. what should be taken into consideration?- : floor load capacitẏ
  12. ou must stack rails on the floor of a storage room. how do the go?: on their backs
  13. ou are installing rails with little distance between the beam and rail. what t pe of bracket must ou use?: angle bracket
  14. ou must fasten a bracket to a brick wall. how do ou do it?: (quick bolt that bitch) use a threaded rod and thru plate it
  15. when installing formed guide rails, what must be done to ensure that the guide rail is secured to the rail bracket?: rail clip heel must contact the edge of the rail
  16. ou are installing a heav dut freight. what clips should ou use?: forged
  17. how much does a 16', 15lb rail weigh?: 240lbs
  18. ou are aligning t rails. which tool will help ou maintain proper DBG?: - baẏonet gauge

7 /

  1. bbg stands for...: back to back guide distance
  2. after surve ing the hoistwa , ou are directed to pull the lines. what will be affected?: the positions of the rails
  3. ou are installing the first set of rail brackets. to provide most stabilit , what level are the brackets t picall located?: even with the top and bottom care guides
  4. ou have installed the rails but need to adjust DBG. which rail would ou adjust: queen
  5. what should be installed to compensate for building compression: jack bolts
  6. what must be done to the rails to ensure a quiet and smooth ride: file the rail joints
  7. the hoistwa is out of plumb. what ma correct the issue: pull the lines
  8. ou are working on an elevator machine and ou notice the drive sheave and brake drum are directl mounted on the motor shaft. what machine are ou working on?: gearless
  9. ou must replace a single threaded worm shaft on a geared traction machine, ou notice that the new worm shaft is double threaded. given the same hoist motor rpm, how will this affect the machine performance: ring gear will turn faster
  10. ou are preparing to install machine beams for a geared traction machine and have established the centerline of the car and counter weight rails. what does this centerline represent: drive sheave centerline
  11. what references are used to align the deflector sheave in place: drive sheave and centerline of counterweight DBG
  12. ou are installing a basement geared machine bedplate on H beams that have a poured floor around them. what hardware do ou use: bolts, cut washers, locknuts
  13. ou have constructed a wooden template for position a basement geared traction machine to its foundation. what two machine centerline reference points must be marked on the template to properl orient the foundation bolt holes: worm shaft, sheave shaft
  14. ou will be installing a secondar sheave for a high speed gearless traction elevator. what will this sheave provide: increased traction
  15. the drive sheave on a geared traction machine ou have installed uses non metallic groove inserts. what advantage do these inserts provide over standard metal v groove and

8 / u groove drive sheave t pes?: coefficient of friction is more constant

10 / : one

  1. ou are preparing the assemble the car sling on a h dro. what are the components: crosshead, stiles, bolster channel
  2. for a broken rope t pe safet - after slackening the hoist ropes, when do the safeties engage the rail: immediatelẏ

11 /

  1. ou are performing an acceptance test with t pe B flexible guide safeties. after initial application, what provides the final force in the safet jaw assem- bl : spring
  2. after installing the compensating sheave, ou prepare to attach the comp ropes. where will the ropes attach: under the car
  3. ou have installed a high rise traction and notice it slips traction at the top and bottom floors. what must be installed to counteract this: comp ropes/chains
  4. ou need to determine runb clearance. between which points do ou measure: counterweight and strike plate
  5. the elevator ou are working on is counterbalanced at 40% and the total car weight is 3000lb. the capacit load is 2500lb. ou must load the counterweight frame. what should the total weight of the frame be: 4000lbs
  6. while performing maintenance on an elevator, ou notice a lack of lubrica- tion on the suspension means, what could be a consequence if this is not addressed: loss of cable diameter
  7. when inspecting preformed/non preformed ropes for wear, what is an important consideration: it is more difficult to detect broken wires on preformed
  8. ou should compare the governor rope tag to what: governor data plate
  9. ou have set up the car and counteweight for rope replacement and have landed the counterweight on two metal stanchions. at what capacit must these stanchions be rated: each stanchion must be capable of supporting the entire load
  10. ou are reroping and elevator and have selected two chainfalls to hang the car. the total weight of the car is 4000. what should be the minimum capacit of each chain fall: 4000 lbs
  11. ou will be replacing hoist ropes and must make preparations with the customer. what important scope of work must be discussed: space required to perform work
  12. ou are performing a 1:1 rope replacement. where in the hoistwa should ou rig the car: middle
  13. ou are read to cut the dead end excess after reshackling. how far past the socket should ou cut it: 6 - 9"
  14. new shackles are installed. how should the dead end be secured?: retainer clips
  15. ou are tensioning the ropes on an elevator that has two different length of shackles.

13 /

  1. what are 3 distinct parts of the construction of steel hoist ropes: wire, strand, core
  2. what are the characteristics of lang la rope: kinks easier, less resistant to cutting
  3. what should be considered when blocking the counterweight: runbẏ and stretch
  4. ou are preparing to install the compensating ropes. where should the reels and jacks be set up: lowest access point
  5. after installing the comp ropes, where should the car be positioned to check rope tension: top of the hoistwaẏ
  6. ou are preparing to install comp chains and notice there are two sets of hitch points. which ones should ou initiall use?: two nearest the counter- weight