Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
NCCCO Telescopic Boom Crane- Swing Cab(TLL) Latest 2023-2024 Questions And Answers Graded (A+).docx
Typology: Exams
1 / 23
This page cannot be seen from the preview
Don't miss anything!
a. 1 broken wire in 6 rope diameters b. 2 broken wires in 30 rope diameters c. 3 broken wires in one strand in one lay d. 2 broken wires in 6 rope diameters - ansd.
a. It increases b. It decreases by a third c. It remains the same d. It decreases by half - ansa.
A long boom crane at a short radius and out of level by 300 can see a reduction incapacity by as much as: - ans50% A multi crane lift shall require - ansCritical lift plan, reduction of gross capacity by 25% and one designated person in charge. A signal person shall be ________________. - ansdesignated person, tested According to ANSI B30.5, hand signal chart shall be posted where? - ansOn the job site According to ASME B30.5, what are the minimal requirements to meet crane operatorqualifications? - ansPhysical, Written Test, Practical Test An anti-two-block device can be used _________________. - ansto test the LMI Crane stability is based on - anslever principle Cranes should be load tested when? - ansAfter modifications During crane assembly, the counter weight should be installed when? - ansBefore raising the boom How should wire rope be inspected during a frequent inspection? - ansVisually Load hoist sheaves and boom tip sheave shall have pitch diameters not less than times the nominal diameter of the rope used. - ans Not extending telescoping boom sections equally; what may occur? - ansLonger section collapse Per ANSI B30.5, when in transit under power lines of 350 KV the minimum clearance is? - ans16 FT Per ANSI B30.5, when operating near high voltage line of 250 KV the minimum clearance is ___________________. - ans20 FT The boom angle is the angle between ___________________. - ansthe ground and centerline of the boom, between sheaves and heel pins The deflection of a boom will cause the load to __________________________. - ansincrease the radius
The load chart is matched to the crane by: - ansSerial number The load hoist drum flange shall be _________________. - ans1/2 in. or higher over the top layer of rope Three short audible signals mean - ansback-up Upon completion of assembly of the crane, what must be done? - ansAn inspection to ensure that manufacturer specifications are met What are the broken wire removal requirements for rotation resistant wire rope? - ans broken wires in 6 diameters or 4 in 30 diameters What are the requirements to be a crane inspector? - ansSame as operator What hand signal must be obeyed at all times? - ansStop What is the design factor for rotation resistant rope used as a hoist line? - ans5: What is the object of rope lubrication? - ansA and B What is the OSHA standard for cranes in construction industry? - ans29 CFR-1926. Subpart CC What percentage of the crane chart is considered a critical lift? - ans75% What shall be in the operator's cab during crane operations? - ansLoad charts What standard method hand signal is being illustrated? a. Boom up b. Boom down c. Retract boom d. Hoist - ansc. When can a crane be side loaded? - ansWith a freely suspended load When can the operator leave the crane? - ansAfter securing the crane When doing a pick and carry, tire pressure must - ansmeet manufacturer's specifications
b. Over the rear c. Over the right side d. Over the left side - ansa.
a. Be dragged out b. Be lifted as normal c. Not be lifted by crane d. Handled with extra care - ansc.
c. Over the corner d. over the left side - ansc.