Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
continuously - ANSWER during all crane movements, asme b30.5 states that communication shall be maintained
Typology: Exams
1 / 9
This page cannot be seen from the preview
Don't miss anything!
continuously - ANSWER during all crane movements, asme b30.5 states that communication shall be maintained stop crane movements - ANSWER if the communication is disrupted at any time while the crane is operation, the operator shall osha 1926.1400 appendix a - ANSWER OSHA's standard method crane hand signals would be located in the following designated person - ANSWER according to asme b30.5 prior to qualifying all signal persons they must be tested by? none - ANSWER what should be the response of the operator if the signal is not understood posted conspicuously - ANSWER according to asme b30.5 where must a hand signal chart be posted lift director, signalman and operator - ANSWER when using voice signals according to asme b30.5 who must be present for the pre lift discussion
limitations - ANSWER a qualified signal person must have knowledge of the standard hand and voice signals along with a basic understanding of crane operations and tested - ANSWER according to osha 1926.1419 before lifting operations begin communication systems shall be identify each other - ANSWER prior to commencing a crane lift the operator and signalperson shall perspective - ANSWER any direction given to the crane operator by the signal person shall be given from the operator function and direction - ANSWER what is the first element of voice signals given to a crane operator prior to the lift 6 - ANSWER osha 1926.1411 when you encounter power lines with a voltage of 44kv and the crane is in transit you must keep a minimum clearance of how many feet 10 - ANSWER according to osha 1926.1411 when the crane is in transit and the power lines you are to go under are rated at 300kv what minimum clearance must you maintain signal person - ANSWER osha 1926.1401 a dedicated spotter must also have the qualifications of a
pre lift meeting - ANSWER what must the operator signalman and the crew attend before they hoist a personnel platform osha 1926.1400 appendix a - ANSWER according to osha which hand signal examples must be used to signal cranes signal person - ANSWER prior to beginning lifting operations using voice signals the signals shall be discussed and agreed upon by the lift director crane operator and which person lift below hand signals - ANSWER before commencing lifting operations the operator and the signalperson shall contact and identify each other when using which form of communication test - ANSWER telephone,radios, or equivalent if used for voice signals must have what performed on them prior to use dedicated - ANSWER when directing a crane using voice signals the transmission must be through a channel that is lift supervisor - ANSWER according to asme b30.23 who is responsible for assigning the signalperson prior to any hoisting safety representative - ANSWER who is responsible for designating the number of signalpersons required to hoist a personnel platform safely
communicate with the operator - ANSWER according to asme b30.23 in a suspended personnel platform without boom motion controls management shall designate one person to perform what task operator and platform occupants - ANSWER during hoisting of a personnel platform and using a signalman who is located on the ground who mush the signalman keep continuous and positive communication with in the crane - ANSWER where just a hand signal chart be posted according to asme b30.23 while lifting a personnel platform dedicated and qualified signalperson - ANSWER according to asme b30.23 when lifting personnel near electrical power lines condition b who much continuously monitor and stay in communication with the equipment hoist operator to keep all required clearances 20 feet - ANSWER according to 1926.1408 when operating near a high voltage power lines what clearance shall be required when the rating of the lines are 275kv 10 feet - ANSWER according to 1926.1408 when operating near a high voltage power lines what clearance shall be required when the rating of the lines are 33kv 20 mph - ANSWER what is the maximum wind speed allowed during suspended personnel platform operations dynamic loading - ANSWER accelerated load hoisting creates
go ahead - ANSWER if the operator sounds two short audible signals while move crane he/she intends to hard wire radio - ANSWER when signaling a tower crane which of the following is most reliable asme b30.3 - ANSWER according to asme which volume listed below must be used to hand signal a tower crane asme b30.5 - ANSWER according to asme which volume listed below must be used to hand signal a mobile crane 10 feet w/encroachment precautions - ANSWER according to osha 1926.1408 the minimum clearance between any part of the crane and power lines rated 50kv or below shall be 10 feet w/encroachment precautions - ANSWER according to osha 1926.1408 for power lines rated 100kv the minimum clearance between the crane and any lines shall be stand away from the load and signal from a safe distance - ANSWER when giving voice signals the signal person should asme b30.5 - ANSWER which asme section covers the construction of the mobile cranes
1926.1431 - ANSWER which osha section refers to housing personnel all of the above - ANSWER which osha section refers to working near energized power lines subpart cc - ANSWER what osha suboart refers to signal person operations decrease the swing radius - ANSWER when swinging from a more stable quadrant to a less stable quadrant what precaution can be taken by the signal person to maximize crane capacity rigging of the load - ANSWER a signal person should not have to worry about placard in the cab and 2 in the outside of the crane - ANSWER where can you find information on electrical hazards assembly and disassembly of a crane radius decrease - ANSWER if boom angle remains the same while telescoping in what happens to the boom radius de energize and ground - ANSWER when working near power line what is the first option to safely work near it have spare batteries - ANSWER when using 2 way radios to signal a crane a 100 ton crane can pick up 100 tons when the boom is at - ANSWER maximum boom height, minimum boom length