Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

lab manual for Software Engineering lab, Study notes of Software Engineering

lab manual for Software Engineering lab

Typology: Study notes

2021/2022

Uploaded on 06/29/2022

aliasger
aliasger 🇮🇳

5

(1)

5 documents

1 / 4

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
PRACTICAL - 1
Aim: - To draft the project plan for Hospital Management System.
1. Objective: -
The objective of "Hospital Management System" is to simply track the
knowledge of all the staffs, patients, treatment provided, doctors and the
medicines.
The main objective of the Hospital Management System is to use the time taken
through manual system so as to take care of all the records.
Hospital Management System is a software system that can store, update, and
retrieve the information through Databases.
2. Requirement Analysis :-
2.1 Software Requirement
NetBeans 8.2 IDE.
Google Chrome.
Xampp.
2.2 Hardware Requirement
Computer.
Windows 10.
Power Supply.
3. Project Approach :-
3.1 Project Initiation
3.1.1 Planning
Project planning is a part of project management, which relates to the use of
schedules such as Gantt charts to plan and subsequently report progress
within the project environment.
Planning a project mainly consist of 3 steps :
1. Have a vision.
2. Make a timeline.
3. Build the team.
pf3
pf4

Partial preview of the text

Download lab manual for Software Engineering lab and more Study notes Software Engineering in PDF only on Docsity!

PRACTICAL - 1

Aim: - To draft the project plan for Hospital Management System.

1. Objective: -

  • The objective of "Hospital Management System" is to simply track the knowledge of all the staffs, patients, treatment provided, doctors and the medicines.
  • The main objective of the Hospital Management System is to use the time taken through manual system so as to take care of all the records.
  • Hospital Management System is a software system that can store, update, and retrieve the information through Databases.

2. Requirement Analysis :-

2.1 Software Requirement

• NetBeans 8.2 IDE.

• Google Chrome.

• Xampp.

2.2 Hardware Requirement

  • Computer.
  • Windows 10.
  • Power Supply.

3. Project Approach :-

3.1 Project Initiation 3.1.1 Planning Project planning is a part of project management, which relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Planning a project mainly consist of 3 steps :

  1. Have a vision.
  2. Make a timeline.
  3. Build the team.

3.1.2 Resource Allocation

  • Project Staff resources will be available when and as they will be needed.
  • Required hardware resources will be available when and as they will be needed.
  • Required customer resources will be available when and as they will be required.
  • Access to industry experts and specialized skills will occur as needed. 3.2 Project Execution 3.2.1 Designing This part contains how the project will be designed. Mainly it is based upon the requirements of the user, the programmer have to do as the client says. What kind of things he need in the project, what kind of appearance he needs. 3.2.2 Implementation Implementation contains all the coding part of the project. If it’s a large project, a team is required to accomplish it otherwise a single person can also complete the project according to the need of client. 3.2.3 Testing This phase contains the testing of the project before handling it to the client. All the aspects of the project are check, whether the project is working fine or there is any error, if any then it can be removed before handling the project to the client. 3.3 Project Deployment
  • Deliverables will be subject to no more then a specific numbers of review cycles.
  • Software and equipment order lead times are known and can be expected to be met.

5. Rules And Responsibility :-

Name Role and Position Contact info. Sudhanshu Gupta Software Developer^ sudhanshu.gupta041@gmail.com Sahil Rana Programmer sahilrana5037@gmail.com

6. Cost Estimate :-

  • The statistics used in preparing the estimates are accurate within a given percent.
  • Outsourced consulting will be limited to a specified number of days at a specified rate per day.
  • The cost estimate will depend upon the work of project and the staff.

7. Project Constraints :-

The project should have been modified a bit more, like all details should be shown somewhere about the doctors, patients and other details. The details of the doctor should be displayed on the screen when diagnosing the patient. The overall project got so many constraints that need to be solved.