Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
final year computer science report for vtu student
Typology: Study Guides, Projects, Research
1 / 42
This page cannot be seen from the preview
Don't miss anything!
Bachelor of Engineering In CIVIL ENGINEERING Submitted By
Under the Guidance of Mr. YASHWANT Project Engineer Co-Guidance of Mrs. CHAITHANYA M B Professor & HOD Dept. of Civil Engineering
NAAC Accredited, affiliated to VTU, Belagavi, Approved by AICTE New Delhi, Navarathna Agrahara, off Intl. Airport Road, Bengaluru– 562110
NAAC Accredited, affiliated to VTU, Belagavi, Approved by AICTE New Delhi, Navarathna Agrahara, off Intl. Airport Road, Bengaluru– 562110
I RAHUL KUMAR (1ME18CV007) , studying in the final semester of Bachelor of Engineering in Civil Engineering at M S Engineering College , Bengaluru , hereby declare that this internship work entitled “CONSTRUCTION OF POST METRIC GIRLS HOSTEL @ HOSKOTE TOWN & CONSTRUCTION OF KITTURU RANI CHENNAMMA RESIDENTAL SCHOOL COMPLEX @ BALEPURA” which is being submitted by us in the partial fulfilment for the award of the degree of Bachelor of Engineering in Civil Engineering, from Visvesvaraya Technological University , Belagavi , is an authentic record of us carried out during the academic year 2022-2023 under the guidance of Mr. Yashwant, Mr.Beeresh , Consulting Civil Engineer and co-guidance of Mrs. Chaithanya M B assistant professor, Department of Civil Engineering, MSEC. I further undertake that the matter embodied in the dissertation has not been submitted previously for the award of any degree or diploma by us to any other university or institution. ………………………… PLACE: BENGALURU RAHUL KUMAR DATE: (1ME18CV007)
3 List of Figures iii 4 Abstract v
3.1 External Plastering 11 4.1 Reinforcement for beams & slabs 13 4.2 Bar bending 14 4.3 Lapping of steel bars 15 4.4 Cover block placed in steel reinforcement 16 4.5 Chairs in steel reinforcement 16 5.1 Soak pit 18 6.1 Shuttering work 20 7.1 Placing and tieing of reinforcement 22 7.2 Pouring of concrete using concrete pump 23 7.3 Curing of concrete columns 24 7.4 Curing of slab by ponding method 24 8.1 Cleaning of mother slab 25 8.2 PVC Tile spacers 26 8.3 Curing of tiles 26
The report in its present form explains the different activities carried out as part of the internship on “ CONSTRUCTION OF POST METRIC GIRLS HOSTEL @ HOSKOTE TOWN & CONSTRUCTION OF KITTURU RANI CHENNAMMA RESIDENTAL SCHOOL COMPLEX @ BALEPURA ” for a period of 26 days from 27/08/22 to 20/09/22. During our internship period, a number of approaches and exposures were used which includes hands on through reading relevant materials and a question-and-answer approaches, site investigations and interactions with various officials. We were assigned to different departments which include site investigation, checking reinforcement details, Surveying, Laboratory, etc and this helped us interact with different people which helped us acquire a lot of information. We gained knowledge on various techniques used for reinforcement checking, Building planning and also to analyze various parameters taken at the site. In conclusion, this was an opportunity to develop and enhance skills and competence in our career ahead.
INTERNSHIP REPORT 2022-
Construction is a process of constructing a building or infrastructure. Building Construction is the process of adding structure to real property. Construction of buildings andinfrastructures plays an important role in the development of countries. Construction differs from manufacturing in which involves mass production of similar items without a designatedpurchaser, while construction it takes place on location for a known client. Construction starts with planning of building or infrastructure for construction, designof layout for construction and financing or costing require for construction. A small scale construction includes the construction of houses, residential apartments, buildings, etc. Largescale construction includes constructions of Residential projects, bridges, infrastructures, etc.Large scale construction requires collaboration of multiple disciplines, sometimes it referred as mega projects. Building constructions are made of public construction and private construction. Public construction includes the construction under government projects such as building of offices, construction of bridges, railways, highways, mega projects, etc. Private construction includes the construction of houses, apartments and complexes, private building projects, etc.
INTERNSHIP REPORT 2022- NAME IMAGE USE Protective Gloves Protect our hands from infection and contamination Hearing Protection (^) Decrease the risk of hearing damage from excessive noise Foot protection (^) Protect foot from concrete, chemical, mud, etc. Reflective Gear Provides signal the presence of the user in places and events which may cause threats to their health and safety Protective Glass Protect eyes from dust, chemical, and other harmful radiations. Respiratory protection Protect lungs from harmful dust, fogs, smokes, mists, gases, vapours, and sprays Full face shields Protect your eyes, as well as the rest of your face. Construction helmet Protect the head from injury dueto falling materials. Dept. of Civil Engineering, MSEC 3
INTERNSHIP REPORT 2022- Fire protection Used to control fire Safety netting Provides safety for workers from falling down on the ground floor. Fire extinguisher Used to control fire. Safety cone Provide a brief reminder to pedestrians or motorists to proceed with extra caution. Caution board (^) Provide gear warning to the operator in a hazardous situation that may cause minor or moderate injury.
Construction tools list for building construction works such as concrete, brick masonry, levelling, wood works, floor works, brick lying, plastering etc. is provided. Everyconstruction tool is necessary to achieve good results in the whole project. Along with thesetools, the workers should also use some safety tools to prevent them from the unexpected accidents. Measuring tape Measuring tape is used to check the thickness, length, widths of masonry walls, foundation beds, and excavated trench etc. Dept. of Civil Engineering, MSEC 4
INTERNSHIP REPORT 2022- Wheel Barrow Wheel barrow is used to transport bulk weights of materials like cement, sand, concrete mix etc. It contains one or two wheels at its front and two handles at its backwhich are used to push the wheel barrow. Spirit Level Spirit level is made of wood or hard plastic with bubble tube in the middle. Thebubble tube is filled with alcohol partially. So the air bubble is formed in it. Pick Axe Pick axe is used to excavate the soil. It is more suitable for hand soil which is quitedifficult to dig with spade or hoe.
INTERNSHIP REPORT 2022-
Three Methods of construction there are • Surface preparation • Mixing of adhesive • Application of Adhesive
INTERNSHIP REPORT 2022-
INTERNSHIP REPORT 2022-