Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
ICC U2 UST Decommissioning Exam Questions With Correct Answers 2025.
Typology: Exams
1 / 55
This page cannot be seen from the preview
Don't miss anything!
Dizziness excitement, unconsciousness
which of the following answers describe specific gravity? - correct answer.the ratio of the density of petroleum with aspects of the density of water specific gravity - correct answer.most petroleum float on water vapor pressure - correct answer.High vapor pressure equals more Vapors viscosity - correct answer.more viscous equals slower flowing Vapor density - correct answer.Vapors are slightly heavier than air The regulations to enforce compliance of underground storage tank systems in the state are found in? a.) Code of Federal Regulations, 40 CFR Part 281 b.) California Code of Regulations, Title 23, Chapter 16 c.) Code of Federal Regulations, 40 CFR Part 280 d.) California Code of Regulations, Title 23, Chapter 17 - correct answer.b.) California Code of Regulations; Title 23, Chapter 16 By definition an "underground storage tank system" includes a.) The tank, all connected piping and dispensers b.) The tank, all connected piping, ancillary equipment and containment system c.) Only the tank d.) Only tanks totally beneath the surface of the ground - correct answer.b.) The tank, all connected piping, ancillary equipment and containment system (H&SC, Sec 25281(z)) Under-dispenser containment was required for all UST systems by ___________. a.) December 31, 2003 b.) July 1, 1987 c.) January 1, 1984 d.) January 1, 2000 - correct answer.a.) December 31, 2003 CCR Title 23, Sec 2636(g)(C) According to California Law, UST systems installed after July 1, 2003, require a one- time ELD test to ensure that the tank is product tight... a.) If the tank is located within one (1) mile of a public drinking water well b.) If the tank is located within 1000 feet of a public drinking water well c.) Unless the tank is equipped with secondary containment d.) In all cases - correct answer.For ALL tanks before use (H&SC 25290.2 (I))
a.) 10 years b.) 1.5 years c.) 3 years d.) 6.5 years - correct answer.d.) 6.5 years CCR Title 23, Sec 2712(b) Impressed current cathodic protection systems shall be inspected no less than every ___________ to ensure that they are in proper working order: a.) 60 days b.) 90 days c.) 30 days d.) 120 days - correct answer.a.) 60 days CCR Title 23, Sec 2635(a)(2) Monthly monitoring data must be kept on file for _________________. a.) 3 years b.) 6.5 years c.) 5 years d.) For the life of the UST system - correct answer.a.) 3 years CCR Title 23, Sec 2712(b) By December 22, 1998, all automatic line leak detectors installed on single-walled pressurized piping must be capable of: a.) Restricting product flow b.) Triggering an audible and visual alarm c.) Shutting down the pumping system d.) Shutting off the flow at the dispenser - correct answer.c.) Shutting down the pumping system CCR Title 23, Sec 2666(c) When an automatic tank gauge is utilized for single-walled tank leak detection, it shall generate a post-test hard copy data report of the following information, except: a.) Liquid volume b.) Fuel depth c.) Outside air temperature d.) Time and date of test - correct answer.c.) Outside air temperature
CCR Title 23, Sec 2643(b)(1) If a UST system is utilizing an overfill alarm, the alarm must be triggered to alert the transfer operator when the tank is no more than ___________ full a.) 85% b.) 95% c.) 90% d.) 80% - correct answer.c.) 90% CCR Title 23, Sec 2635(b)(2)(A) A service technician has performed calibration and maintenance on an ATG probe; this maintenance record must be kept on file for ______________. a.) 6.5 years b.) 3 years c.) 5 years d.) Life of the UST system - correct answer.c.) 5 years CCR Title 23, Sec 2712(b) An automatic tank gauge is utilized for leak detection of the ______________. a.) Tank b.) Tank and Piping c.) Piping d.) Interstitial space - correct answer.a.) Tank CCR Title 23, Sec 2643(b)(1) After completion of enhanced leak detection (ELD) test, the ELD test results must be submitted to the _________________. a.) The local agency b.) The SWRCB c.) Owner of the UST system d.) To both the SWRCB and the local agency - correct answer.d.) To both the SWRCB and the local agency CCR Title 23, Sec 2644.1(a)(5) Which agency approves a site-specific variance which allows for an alternative method of construction or monitoring: a.) The Regional Water Quality Board
d.) Inspect the facility and determine compliance - correct answer.d.) Inspect the facility and determine compliance CCR Title 23, Sec 2712(c) Spill containers must be tested no less than _______________ to demonstrate that it is capable of containing the hazardous substances until it is detected and cleaned up. a.) Every 6 months b.) Every 36 months c.) Every 12 months d.) At the time of install or replacement - correct answer.c.) Every 12 months H&SC, Sec 25284. All the following components require third party certification, except: a.) Automatic tank gauging systems b.) Statistical inventory reconciliation methods c.) Spill Containment lids d.) Liquid phase out-of-tank products - correct answer.c.) Spill Containment lids The exterior surface of an underground storage tank must bear a marking or label which shows the following information, except: a.) Design pressure in psig b.) Useable capacity in gallons. c.) Width of the interstitial space d.) Identity of manufacturer - correct answer.c.) Width of the interstitial space CCR Title 23, Sec 2631(b) Which of the following is not a confined space: a.) A really deep turbine sump b.) A space not designed for continuous employee occupancy c.) An area with limited access d.) An area with limited ventilation - correct answer.d.) An area with limited ventilation CCR Title 8, Sec 5157(b) Records for UST construction, repairs, lining, and upgrades must be kept for: a.) 3 years b.) 10 years c.) 5 years
d.) The life of the tank - correct answer.d.) The life of the tank CCR Title 23, Sec 2712(b) Under-dispenser containment was required at the time of installation for all UST systems installed after _________________. a.) July 1, 1987 b.) January 1, 2000 c.) January 1, 1984 d.) December 31, 2003 - correct answer.b.) January 1, 2000 CCR Title 23, Sec 2636(g)(1)(A) Cathodic protection systems must be inspected by a certified cathodic protection tester within __________________months of installation: a.) 3 b.) 6 c.) 12 d.) 18 - correct answer.b.) 6 CCR Title 23, Sec 2635(a)(2)(A) A secondary containment system which is not an integral part of primary containment shall be designed and constructed according to an engineering specification approved by a third party. The secondary containment system shall contain ______________ of the volume of the largest primary container within it, in the case of multiple primary containers: a.) 100 percent b.) 10 percent c.) 110 percent d.) 150 percent - correct answer.d.) 150 percent CCR Title 23, Sec 2631(e)(1)(B) All the following are approved overfill prevention systems, except: a.) Automatic shutoff devices b.) Spill Containers c.) Overfill alarms d.) Flapper valves - correct answer.b.) Spill Containers CCR Title 23, Sec 2635(b)(2)
CCR Title 23, Sec 2715(g)(h) Which of the following would not require secondary containment testing? a.) Interstitial space hydrostatically monitored b.) Under-dispenser containment c.) Turbine piping sump d.) Secondary piping - correct answer.a.) Interstitial space hydrostatically monitored CCR Title 23, Sec 2637(g) Local agency inspectors performing UST system inspections must meet the following requirements: which of the following statements is most accurate. a.) Effective July 1, 2005 posses a current inspector certificate issued by ICC b.) Renew the CA UST Inspector Certification every 24 months by either passing the ICC Cal. UST Inspector exam of satisfying equivalent criteria as approved by the Board. c.) Renew the CA UST Inspector Certification every 24 months by passing the ICC Cal. UST Inspector exam d.) Newly hired local agency inspectors are required to pass the CA UST Inspector exam 120 days from the date of hire. - correct answer.b.) Renew the CA UST Inspector Certification every 24 months by either passing the ICC Cal. UST Inspector exam of satisfying equivalent criteria as approved by the Board. CCR Title 23, Sec 2715(j) Fiberglass tanks shall be repaired by the following, except: a.) Small fractures and fissures may be repaired with epoxy b.) Fiberglass cloth with a minimum dimension 12 x 12 inches centered over the area to be repaired. c.) A second layer of fiberglass cloth shall be installed directly over the primary cloth layer and shall be cut to overlap the primary patch by 5 inches on all sides. d.) The repaired tank shall be tested for tightness within 30 calendar days following the date of the completion of the repair. - correct answer.c.) A second layer of fiberglass cloth shall be installed directly over the primary cloth layer and shall be cut to overlap the primary patch by 5 inches on all sides. CCR Title 23, Sec 2661(d)(4) Tanks installed after July 1, 1987 with suction piping are exempt from the requirement for secondary containment of the piping provided all the following are met, except: a.) No valves or pumps are installed below-grade in the suction line. b.) The below-grade piping operates at less than atmospheric pressure.
c.) The below-grade piping is sloped so that the product will drain back into the storage tank d.) An angle check valve or check valve is located as near to the tank top and as close to the dispenser pump as possible. - correct answer.d.) An angle check valve or check valve is located as near to the tank top and as close to the dispenser pump as possible. CCR Title 23, Sec 2636(a)(3) Automatic line leak detectors shall be installed on underground pressurized piping and shall be capable of detecting a 3-gallon per hour leak rate at 10 psi within 1 hour with a probability of detection of at least ______% and a probability of false alarm no greater than _______%. a.) 95, 5 b.) 98, 2 c.) 5, 95 d.) 2, 98 - correct answer.a.) 95, 5 CCR Title 23, Sec 2636(f)(2) & 2643(c)(1) An emergency impact valve (shear valve) is found in the following location on an UST System. a.) At the turbine piping termination b.) Base of the dispenser c.) Under the extractor tee d.) Spill container - correct answer.b.) Base of the dispenser Underground storage tank owners and operators shall submit a copy of the secondary containment test report to the local agency within _____ of the completion of the test, a.) 60 days b.) 30 days c.) 45 days d.) 15 days - correct answer.b.) 30 days CCR Title 23, Sec 2637(e) Notification to perform a secondary containment test must be given to the local agency by: a.) A service technician or a licensed tank tester. b.) Cathodic protection tester. c.) Owner/operator of UST. d.) State Water Resources Control Board. - correct answer.c.) Owner/operator of UST
Any person(s) installing underground storage tank systems or components shall be certified or licensed by: a.) The Contractors State License Board b.) The local agency c.) The State Water Resources Control Board d.) The Regional Water Quality Board - correct answer.a.) The Contractors State License Board CCR Title 23, Sec 2715(g) The designated UST operator(s) shall perform monthly visual inspections of all UST's for which they are designated. The monthly visual inspection shall include all of the following, except: a.) Inspecting for the presence of hazardous substances, water, or debris in spill containers. b.) By July 1, 2005, verify that all facility employees have been trained. c.) Reviewing the alarm history report or log for the previous month. d.) Inspecting for the presence of hazardous substances, water, or debris in containment sumps regardless of documentation showing each alarm for the previous month has been responded to appropriately. - correct answer.d.) Inspecting for the presence of hazardous substances, water, or debris in containment sumps regardless of documentation showing each alarm for the previous month has been responded to appropriately. CCR Title 23, Sec 2715(c) The following statements are true about the certification of monitoring equipment, except: a.) The certification is an annual requirement. b.) The certification shall be made on a "Monitoring System Certification" form. c.) UST owners and operators shall submit a completed "Monitoring System Certification" form to the local agency within 30 days after completion of the inspection. d.) The "Monitoring System Certification" form must be posted. - correct answer.d.) The "Monitoring System Certification" form must be posted. CCR Title 23, Sec 2638, 2641(j) Field-installed cathodic protection systems shall be designed and certified as adequate by a: a.) Cathodic protection tester.
b.) A corrosion specialist. c.) Owner/Operator. d.) A service technician or a licensed tank tester. - correct answer.b.) A corrosion specialist CCR Title 23, Sec 2635(a)(2)(A) A facility has a single wall tank and has chosen statistical reconciliation plus tank integrity testing as their quantitative release detection method. The following statements are false about this method, except: a.) A tank integrity test shall be conducted once every year. b.) Statistical inventory reconciliation shall be conducted at least once per month in accordance with section 2646.1. c.) The SIR method shall be capable of detecting a release of 0.1 gallon per hour. d.) The product level in the tank is at least 5 feet. - correct answer.b.) Statistical inventory reconciliation shall be conducted at least once per month in accordance with section 2646.1. CCR Title 23, Sec 2643(b)(3) The designated UST operator must train the employees about all of the following, except: a.) Permit conditions b.) Monitoring plan c.) Best management practices d.) Leak response plan - correct answer.a.) Permit conditions CCR Title 23, Sec 2715(f)(1) When steel tanks arrive at the jobsite, they should be unloaded by: a.) Sliding off the truck b.) Pulling off the truck with a winch c.) Rolling off the truck sideways d.) Lifting off the truck with a cable attached to tank-lifting lugs - correct answer.d.) Lifting off the truck with a cable attached to tank-lifting lugs PEI RP 100 Section 2. (Recommended Practices for Installation of Underground Liquid Storage Tanks) When an automatic tank gauge is utilized to monitor a single-walled tank, a 0. gallon/hour leak test must be performed: