Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Guidewire Associate Examination test with the best answers-sheet, Exams of Computer Science

Guidewire Associate Examination test with the best answers-sheet

Typology: Exams

2023/2024

Available from 03/11/2024

healthpro
healthpro ๐Ÿ‡บ๐Ÿ‡ธ

3.8

(4)

2.3K documents

1 / 8

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Guidewire Associate Examination test
with the best answers-sheet
๏ƒ˜What are the four main areas of configuration in a Guidewire application? -
Correct answer 1. User Interface
๏ƒ˜Data Model
๏ƒ˜Application Logic
๏ƒ˜Integration
๏ƒ˜What are some of the technologies used in InsuranceSuite applications? -
Correct answer Page Configuration Format (PCF) files
๏ƒ˜Gosu (programming language)
๏ƒ˜What are some reasons for a non-developer to understand the technology stack?
- Correct answer To determine what data is stored and if new requirements need
additional data elements.
๏ƒ˜To know how and where data is used.
๏ƒ˜To communicate what data may be needed beyond what is in the base
configuration.
๏ƒ˜To determine valid values or circumstances for the new data.
๏ƒ˜What are some examples of what can be configured in the User Interface? -
Correct answer The order of fields, change labels, regroup fields (simple
change).
๏ƒ˜Fields on a screen (moderate change).
๏ƒ˜Screens (complex change).
๏ƒ˜Screen-based logic (complex change).
๏ƒ˜What are some examples of what can be configured in the Data Model? - Correct
answer Information that the base application does not store (add passport
number).
๏ƒ˜Values for a Typelist (add valid values for AddressType or PhoneType).
๏ƒ˜Data to support regulatory requirements.
๏ƒ˜Why is it important for non-developers to understand the basics of the UI
architecture and components? - Correct answer So that they can request
changes to the UI that are consistent with the base product architecture and
communicate effectively with developers,
pf3
pf4
pf5
pf8

Partial preview of the text

Download Guidewire Associate Examination test with the best answers-sheet and more Exams Computer Science in PDF only on Docsity!

Guidewire Associate Examination test

with the best answers-sheet

๏ƒ˜ What are the four main areas of configuration in a Guidewire application? - Correct answer 1. User Interface ๏ƒ˜ Data Model ๏ƒ˜ Application Logic ๏ƒ˜ Integration ๏ƒ˜ What are some of the technologies used in InsuranceSuite applications? - Correct answer Page Configuration Format (PCF) files ๏ƒ˜ Gosu (programming language) ๏ƒ˜ What are some reasons for a non-developer to understand the technology stack?

  • Correct answer To determine what data is stored and if new requirements need additional data elements. ๏ƒ˜ To know how and where data is used. ๏ƒ˜ To communicate what data may be needed beyond what is in the base configuration. ๏ƒ˜ To determine valid values or circumstances for the new data. ๏ƒ˜ What are some examples of what can be configured in the User Interface? - Correct answer The order of fields, change labels, regroup fields (simple change). ๏ƒ˜ Fields on a screen (moderate change). ๏ƒ˜ Screens (complex change). ๏ƒ˜ Screen-based logic (complex change). ๏ƒ˜ What are some examples of what can be configured in the Data Model? - Correct answer Information that the base application does not store (add passport number). ๏ƒ˜ Values for a Typelist (add valid values for AddressType or PhoneType). ๏ƒ˜ Data to support regulatory requirements. ๏ƒ˜ Why is it important for non-developers to understand the basics of the UI architecture and components? - Correct answer So that they can request changes to the UI that are consistent with the base product architecture and communicate effectively with developers,

๏ƒ˜ What are five common areas of the UI architecture? - Correct answer 1. The Screen Area ๏ƒ˜ 2. The Sidebar ๏ƒ˜ 3. The Tab Bar ๏ƒ˜ 4. The Info Bar ๏ƒ˜ 5. The Workspace ๏ƒ˜ Name three components of a PCF - Correct answer Card ๏ƒ˜ ListView ๏ƒ˜ Button ๏ƒ˜ Text Input ๏ƒ˜ Contact Picker ๏ƒ˜ Radio button ๏ƒ˜ Checkbox ๏ƒ˜ What keyboard shortcut provides just the location information for a screen viewed in an InsuranceSuite product? - Correct answer ALT+SHIFT+I displays the Location Info window ๏ƒ˜ What tool does a developer use to configure InsuranceSuite products? - Correct answer Guidewire Studio ๏ƒ˜ What are the two main components of the data model? - Correct answer 1. Entities ๏ƒ˜ 2. Typelists ๏ƒ˜ What is the purpose of the Data Dictionary? - Correct answer It shows the data elements that belong to entities and typelists ๏ƒ˜ What are some of the relationships between entities? - Correct answer Foreign keys - a link to a single row in another entity ๏ƒ˜ Array keys - a link to multiple rows in another entity ๏ƒ˜ Type keys - a link to a specific value in a typelist ๏ƒ˜ Why should a non-developer have a basic understanding of application logic? - Correct answer - Most projects require some changes to application logic o Non-developers define requirements for UI changes o Non-developers help define requirements for Gosu rules o Non-developers define requirements for business rules ๏ƒ˜ Name two places where application logic exists. - Correct answer Gosu rules ๏ƒ˜ Business rules ๏ƒ˜ The User Interface ๏ƒ˜ Classes ๏ƒ˜ Entity Names

๏ƒ˜ What are the Project Manager's responsibilities? - Correct answer Support the sprint team, facilitate the agile process, enable self-organization, resolve impediments, shield outside interference, is a participatory leader and not a dictating manager; servant leader ๏ƒ˜ What are the Product Owner's responsibilities? - Correct answer Key stakeholder representing the voice of the customer, business authority to make decisions (can delegate to key SMEs), shares vision with the development team, collaborates with the teams to develop and deliver the work, defines requirements and answers the development team's questions promptly and with authority, responsible for signing off on user stories and defects. ๏ƒ˜ Who are the most common team members? - Correct answer Business Analysts ๏ƒ˜ Developers ๏ƒ˜ Quality Analysts and Testers ๏ƒ˜ What is a user story? - Correct answer A high level set of requirements from a user's perspective. ๏ƒ˜ What are the three components of a user story? - Correct answer A role, an action, and a reason. ๏ƒ˜ What does it mean to elaborate a user story? - Correct answer Conversations occur between the users and the team to ensure all requirements are understood. ๏ƒ˜ What is the importance of acceptance criteria? - Correct answer It tells us when a user story is done. ๏ƒ˜ Who uses the acceptance criteria during a sprint? - Correct answer Everyone: Business Analysts, Developers, Testers, and Product Owner. ๏ƒ˜ What is the best practice for project planning? - Correct answer Plan for what you know and re-evaluate your plan as needed. ๏ƒ˜ What is theme? - Correct answer A common process with each product. ๏ƒ˜ Themes are broken down into what components? - Correct answer Features, user stories, and tasks. ๏ƒ˜ What does Guidewire provide as a starting point for your project? - Correct answer Guidewire provides approximately 5000 reusable assets/tools to facilitate progress during the implementation project.

๏ƒ˜ What does Guidewire mean by Inception? - Correct answer Guidewire projects include an inception phase to confirm the scope of the project, produce an initial sizing, and create the project baseline. ๏ƒ˜ What are the key objectives from Inception? - Correct answer 1. Formally kick off the project ๏ƒ˜ 2. Train the team on base product and methodology ๏ƒ˜ 3. Introduce the team to agile concepts ๏ƒ˜ 4. Determine an approach to address any product gaps ๏ƒ˜ 5. Document the high-level design (HLD) for integrations ๏ƒ˜ 6. Explain estimation changes as a result of the workshops ๏ƒ˜ Who typically attends Inception? - Correct answer Product owners, SMEs, business analysts, developers, and testers ๏ƒ˜ Why does Guidewire timebox Inception? - Correct answer Guidewire timeboxes inception to avoid collecting excessive details. ๏ƒ˜ Name three best practices from Inception. - Correct answer Utilize an agile methodology, map business case to the themes /subthemes, estimate stories using points, introduce base product features and functionality, document key requirements on story cards, avoid deep discussions about detailed requirements, manage time judiciously, assess product alignment for each user story, create new story cards for gap stories, define a delivery backlog at the end of inception, assess business value to help prioritize the Delivery backlog. ๏ƒ˜ How do we estimate stories? When is this activity done? - Correct answer Points. At the start of the project and also validated during each sprint. ๏ƒ˜ How and when do we estimate tasks? - Correct answer Hours. Only in the current sprint as part of sprint planning. ๏ƒ˜ What is the reason we use points when estimating? - Correct answer People are better at estimating relative sizes, not the detailed hours. There is little value in estimating at this granularity until you are ready to do the work. ๏ƒ˜ Why is team capacity so important? - Correct answer Allows you to know what the team can accomplish during the sprint. ๏ƒ˜ What is the maximum size recommended for any story? Why? - Correct answer 13 points (although 8 is even better). It's the largest story that most teams can complete in a 4 week sprint. ๏ƒ˜ What are the five steps completed during sprint planning? - Correct answer 1. Determine team capacity ๏ƒ˜ 2. Define sprint backlog

๏ƒ˜ -Reduce implementation timelines by providing good starting points that you can customize as needed for your project ๏ƒ˜ -Make your team more efficient ๏ƒ˜ -Available on the Marketplace website ๏ƒ˜ What are the benefits of the Guidewire Community website? - Correct answer The Community is your one-stop shop for information about Guidewire products. There are on-demand resources such as software downloads, knowledge articles, and documentation. Also, this is where you can contact Guidewire Customer Support by creating a case. You can also participate in the Community through the discussion groups. ๏ƒ˜ What is the purpose of story cards? - Correct answer -Describe a standard product behavior ๏ƒ˜ -Represent a specific business requirement ๏ƒ˜ -Contain descriptions of user interface, business rules, and other requirements ๏ƒ˜ -Help customers understand the base product ๏ƒ˜ -Identify changes needed to satisfy business requirements ๏ƒ˜ -At end of project, detail what has been implemented ๏ƒ˜ What is the name of the tool that generates story cards? - Correct answer User Story Template Generator ๏ƒ˜ What is the naming convention for story cards? - Correct answer 1. xCenter with version ๏ƒ˜ 2. Theme ๏ƒ˜ 3. Sub-Theme / Screen ๏ƒ˜ 4. Guidewire ID ๏ƒ˜ What is the purpose of the Mockup UI tab in a story card? - Correct answer To show the proposed user interface (UI) for the story ๏ƒ˜ What are some common customizations of story cards? - Correct answer - Adding an additional column to hold information like: dates, text or numbers (Requirement Numbers), drop down lists ๏ƒ˜ -Creating an additional tab for: data mapping, integration, integration failover, change management ๏ƒ˜ According to story card best practices, is it advisable to change a requirement number? - Correct answer No. A requirement number should not be changed after the requirement has been published. ๏ƒ˜ When are the acceptance criteria written in the requirements gathering process?

  • Correct answer At the same time as the business requirement and before development can begin. They are further refined as the functional requirements are written.

๏ƒ˜ Who is responsible for driving the requirements elaboration workshop? - Correct answer Business analyst ๏ƒ˜ Based on the best practices for conducting an elaboration workshop, what should be the starting point? - Correct answer Use standard workflows and screens of the base configuration