



Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
This study guide provides a comprehensive overview of key concepts and regulations related to residential construction in georgia. It includes a series of questions and answers covering topics such as septic system design, setbacks, and building codes. This resource is valuable for individuals preparing for the georgia residential contractor exam.
Typology: Exams
1 / 7
This page cannot be seen from the preview
Don't miss anything!
Applications II!include: II!- II! II!Correct II!Answers II! II! II!- II!Name II!and II!address II!ofII!property II!owner
II!ifII!more II!than II!_______ II!of II!cover II!is II!to II!be II!placed II!over II!the II!tank II!a II!______ II!will II!be II!required. II!- II! II!Correct II!Answers II! II! II! 12 II!inches, II!riser II!An II!approved II!filter II!must II!be II!installed II!on II!the II!___________ II!of II!the II!tank II!- II! II!Correct II!Answers II! II! II!outlet II!end II!A II!grease II!trap II!is II!required II!when? II!- II! II!Correct II!Answers II! II! II!grease II!introduced II!intoII!the II!system II!exceeds II! 50 II!milligrams/liter II!Effluent II!from II!grease II!trap II!shall II!go II!to II!the II!_______ II!and II!not II!directly II!to II!the II!________ II!- II! II!Correct II!Answers II! II! II!septic II!tank, II!field II!lines II!All II!septic II!tank II!openings II!must II!be II!________ II!- II! II!Correct II!Answers II! II! II!sealed II!Pump II!tank II!specifications II!- II! II!Correct II!Answers II! II! II!- II!Submersible II!and II!wastewater II!approved
II!Absorption II!trenches II!shall II!be II!noII!more II!than II!____________, II!and II!spaced II!a II!minimum II!of II!______________, II!center II!toII!center II!- II! II!Correct II!Answers II! II! II! 36 II!inches, II! 7 II!feet II!____________ II!tons II!of II!gravel II!aggregate II!per II!____________ II!linear II!feet II!of II!absorption II!field II!will II!be II!needed II!toII!maintain II!a II! 12 II!inch II!depth II!- II! II!Correct II!Answers II! II! II!15,II! 100 II!Minimum II!depth II!of II!aggregate II!shall II!be II!_______ II!with II!________ II!below II!the II!perforated II!pipe II!and II!filled II!to II!________ II!above II!the II!pipe II!- II! II!Correct II!Answers II! II! II! 12 II!inches, II! 6 II!inches, II! 2 II!inches II!________________ II!shall II!be II!laid II!in II!the II!center II!of II!the II!trench II!with II!the II!perforations II!oriented II!toward II!the II!___________ II!of II!the II!pipe II!- II! II!Correct II!Answers II! II! II!Perforated II!pipe, II!bottom II!a II!layer II!or II!pervious II!____________________ II!shall II!be II!placed II!over II!the II!aggregate II!before II!back II!filling II!- II! II!Correct II!Answers II! II! II!building II!paper, II!straw, II!or II!similar II!approved II!material II!minimum II!of II!_____ II!toII!______ II!inches II!is II!required II!over II!absorption II!lines II!- II! II!Correct II!Answers II! II! II!6,II! 12 II!Scheduled II! 40 II!PVC II!or II!equivalent II!solid II!pipe II!fittings II!with II!sealed, II!watertight, II!root II!resistant II!joints II!shall II!be II!used II!.... II!- II! II!Correct II!Answers II! II! II!for II!horizontal II!and II!vertical II!changes II!in II!direction II!or II!grade II!and II!toII!cross II!under II!roadways II!and II!paved II!areas II!What II!should II!not II!be II!conducted II!while II!wet? II!- II! II!Correct II!Answers II! II! II!Excavation II!for II!absorption II!trenches II!What II!can II!occur II!ifII!trenches II!are II!dug II!while II!soil II!is II!wet? II!- II! II!Correct II!Answers II! II! II!Smearing II!and II!potential II!irreversible II!damage II!to II!soil II!structure II!Trenches II!must II!be II!installed II!a II!minimum II!of II!____________ II!above II!any II!permanent II!seasonal II!ground II!water II!table, II!rock, II!or II!other II!impervious II!soil II!layer II!- II! II!Correct II!Answers II! II! II! 2 II!feet II!Level II!Field II!System II!- II! II!Correct II!Answers II! II! II!level II!or II!sloping II!topography II!of II! 5 II!percent. II!All II!lines II!interconnected II!to II!form II!a II!continuous II!system. II!Lines II!should II!be II! 6 II!inches II!below II!tank II!outlet. II!a II!single II!line II!cam II!be II!installed II!up II!to II! 125 II!feet II!without II!interconnection