Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

GCSS-Army Maintenance Supervisor's Course Test 1, Exams of Nursing

GCSS-Army Maintenance Supervisor's Course Test 1

Typology: Exams

2023/2024

Available from 09/04/2024

dennistutor
dennistutor 🇺🇸

149 documents

1 / 2

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
GCSS-Army Maintenance Supervisor's
Course Test 1
1. __________ are used to schedule preventive services and inspections. -
d. Maintenance Plans
2. A single-cycle maintenance plan is used to schedule services using either a
________ or a ________. -
a. Date cycle, counter cycle
3. The __________ transaction can be used to change, activate/deactivate, and
flag/unflag a maintenance plan for deletion. -
d. IP02
4. What process within GCSS-Army calculates the quantities needed to satisfy
projected consumption or to meet immediate requirements? -
b. Material Requirements Planning (MRP)
5. What does the "P" indicate behind the MRP area when displaying the details of the
DODAAC Report (ZFE)? -
d. That this is a Provisional MRP Area
6. A General Maintenance Task List can be assigned when: -
d. All of the above
7. When granting GCSS-Army users the authority to post goods receipts using the AIT
application, what must be established for the AIT User record? -
a. A validity period
8. Which transaction code can be used to verify a material's on-hand quantity balance?
-
c. /n/ISDFPS/DISP_MAT_SIT
9. Within transaction code MIGO, what Action, Reference Document, and MvT posting
selections must be used to post a goods receipt for material that is considered Found
on Installation (FOI)? -
c. A01 Goods Receipt, R10 Other, and 501 (Receipt w/o PO)
10. Which Material Requirements Planning Type indicates that a material is a bench
stock item? -
b. PD
11. When the shop stock material initial (ZII) Purchase Requisition (PR) is saved, it is
automatically __________ by GCSS-Army and it must be reviewed before it can be
converted to a Purchase Order (PO). -
d. Parked
12. Use the __________ transaction to display the current readiness posture of your
organization. -
b. Z_EQUST
13. True or False? Using the Equipment Status Report (ESR), a maintenance manager
can review the current status of all vehicles, including which vehicles are non-mission
capable and which are fully mission capable, prior to departure. -
a. True
pf2

Partial preview of the text

Download GCSS-Army Maintenance Supervisor's Course Test 1 and more Exams Nursing in PDF only on Docsity!

GCSS-Army Maintenance Supervisor's

Course Test 1

  1. __________ are used to schedule preventive services and inspections. - ✔d. Maintenance Plans
  2. A single-cycle maintenance plan is used to schedule services using either a ________ or a ________. - ✔a. Date cycle, counter cycle
  3. The __________ transaction can be used to change, activate/deactivate, and flag/unflag a maintenance plan for deletion. - ✔d. IP
  4. What process within GCSS-Army calculates the quantities needed to satisfy projected consumption or to meet immediate requirements? - ✔b. Material Requirements Planning (MRP)
  5. What does the "P" indicate behind the MRP area when displaying the details of the DODAAC Report (ZFE)? - ✔d. That this is a Provisional MRP Area
  6. A General Maintenance Task List can be assigned when: - ✔d. All of the above
  7. When granting GCSS-Army users the authority to post goods receipts using the AIT application, what must be established for the AIT User record? - ✔a. A validity period
  8. Which transaction code can be used to verify a material's on-hand quantity balance?
  • ✔c. /n/ISDFPS/DISP_MAT_SIT
  1. Within transaction code MIGO, what Action, Reference Document, and MvT posting selections must be used to post a goods receipt for material that is considered Found on Installation (FOI)? - ✔c. A01 Goods Receipt, R10 Other, and 501 (Receipt w/o PO)
  2. Which Material Requirements Planning Type indicates that a material is a bench stock item? - ✔b. PD
  3. When the shop stock material initial (ZII) Purchase Requisition (PR) is saved, it is automatically __________ by GCSS-Army and it must be reviewed before it can be converted to a Purchase Order (PO). - ✔d. Parked
  4. Use the __________ transaction to display the current readiness posture of your organization. - ✔b. Z_EQUST
  5. True or False? Using the Equipment Status Report (ESR), a maintenance manager can review the current status of all vehicles, including which vehicles are non-mission capable and which are fully mission capable, prior to departure. - ✔a. True
  1. What type of purchasing documents can be displayed in the Order Status Report? - ✔c. Purchase order documents
  2. How long is a work center shift interval valid? - ✔b. For the defined validity period
  3. The PP61 transaction can be used to perform the following: - ✔d. All of the above
  4. What must the work center personnel shift plan profile always be set to? - ✔b. SAP_000002 (work center view)
  5. Bench stock material is consumed using a________, which reduces the inventoried quantity of the material on hand. - ✔c. Goods Issue
  6. A ________ is an inventory management term that denotes a physical inward goods movement of materials resulting in an increase in inventory. - ✔a. Goods Receipt
  7. The aging indicators identify the age of return purchase requisitions for the materials to be turned in to your Supply Support Activity. Which aging indicator light represents a PR that is between 11 and 30 days old? - ✔b. Yellow light