GCSS-Army ERPS's Course Test 1, Exams of Nursing

GCSS-Army ERPS's Course Test 1

Typology: Exams

2023/2024

Available from 09/04/2024

dennistutor
dennistutor 🇺🇸

149 documents

1 / 2

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
GCSS-Army ERPS's Course Test 1
1. A __________ is a GCSS-Army component that represents a particular Army Unit,
logistics element, or cost capturing entity. -
a. Force Element (FE)
2. Which transaction code (T-Code) is used to display a Unit's Organizational structure?
(Force Element, Storage Location, Property, Personnel, and what a unit is allowed to
request) -
c. /n/ISDFPS/LSP2
3. Which transaction code (T-Code) is used to identify the details associated with a
DoDAAC, MRP area, Storage Location, and supporting supply organization. -
d. ZFE
4. True or False? A Technical Status is set by the User to identify the severity of a
notification (fault or shortcoming) for a piece of equipment. -
a. True
5. Which operational status symbol is used to indicate the equipment non-mission due
to a maintenance requirement? -
c. Red Flag
6. Work orders are created and managed from the Equipment Situation Report. Which
of the following represents a refurbishment order? -
b. PM04
7. True or False? A functional location structure is a hierarchical structure
representation of a system/sub-system/end item. -
a. True
8. Using the Functional Location Structure example below; which equipment is currently
NOT installed into the Functional Location Structure? -
d. The transmission
9. Which notification type is used to create a one-time individual equipment dispatch? -
b. D1
10. Which transaction is used to display the workflow message indicating the approval
authority's equipment dispatch request decision? -
d. SBWP
11. Which transaction code (T-Code) is used to create a project work order? -
d. IW31
12. Which of the following work centers is never entered in the Main Work Ctr field of a
work order? -
d. A Commodity Shop work center being assigned work
13. What triggers the dismantle/install process? -
c. Goods movement for a work order
14. After the technical completion button in the overall completion process is selected,
how is the operational status updated? -
c. The Set User Status dialog box prompts the User to update the operational
status
pf2

Partial preview of the text

Download GCSS-Army ERPS's Course Test 1 and more Exams Nursing in PDF only on Docsity!

GCSS-Army ERPS's Course Test 1

  1. A __________ is a GCSS-Army component that represents a particular Army Unit, logistics element, or cost capturing entity. - ✔a. Force Element (FE)
  2. Which transaction code (T-Code) is used to display a Unit's Organizational structure? (Force Element, Storage Location, Property, Personnel, and what a unit is allowed to request) - ✔c. /n/ISDFPS/LSP
  3. Which transaction code (T-Code) is used to identify the details associated with a DoDAAC, MRP area, Storage Location, and supporting supply organization. - ✔d. ZFE
  4. True or False? A Technical Status is set by the User to identify the severity of a notification (fault or shortcoming) for a piece of equipment. - ✔a. True
  5. Which operational status symbol is used to indicate the equipment non-mission due to a maintenance requirement? - ✔c. Red Flag
  6. Work orders are created and managed from the Equipment Situation Report. Which of the following represents a refurbishment order? - ✔b. PM
  7. True or False? A functional location structure is a hierarchical structure representation of a system/sub-system/end item. - ✔a. True
  8. Using the Functional Location Structure example below; which equipment is currently NOT installed into the Functional Location Structure? - ✔d. The transmission
  9. Which notification type is used to create a one-time individual equipment dispatch? - ✔b. D
  10. Which transaction is used to display the workflow message indicating the approval authority's equipment dispatch request decision? - ✔d. SBWP
  11. Which transaction code (T-Code) is used to create a project work order? - ✔d. IW
  12. Which of the following work centers is never entered in the Main Work Ctr field of a work order? - ✔d. A Commodity Shop work center being assigned work
  13. What triggers the dismantle/install process? - ✔c. Goods movement for a work order
  14. After the technical completion button in the overall completion process is selected, how is the operational status updated? - ✔c. The Set User Status dialog box prompts the User to update the operational status
  1. General maintenance task lists define which requirement for a maintenance task or activity? - ✔c. Both A & B
  2. True or False? The Service schedule displays the date in which the maintenance call was completed as well as the maintenance calls that are due for processing? - ✔a. True
  3. Which aging indicator displays in the Recoverable/Reparable Conversion by Material (YOBUX) transaction if the return (ZRL or ZRX) PR is 15 days olds? - ✔b. Yellow
  4. True or False? When executing the MI24 transaction, you are in search of open active inventories. - ✔a. True
  5. Which Action, Reference Document, and Movement Type posting selections are used to post goods issue bench stock material to a Unit's Cost Center? - ✔a. A07 Goods Issue, R10 Other, and 201
  6. Which of the following items are not displayed in the Order Status Report? - ✔d. The mode of shipment