Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
A financial appraisal of a proposed middle-income housing project at Mwihoko Kiriri Kiambu County. It includes a breakdown of the original contract sum, omissions, and additions for each element of the project, as well as prime cost sums and materials on site. useful for understanding the financial aspects of a construction project and for tracking progress and costs.
Typology: Study notes
1 / 3
This page cannot be seen from the preview
Don't miss anything!
A Preliminaries 10,564,321.00 10,564,321.00 9,100,000. BUILDER'S WORK A Substructure 3,647,640.00 3,647,640.00 3,647,640. B Reinforced Concrete Frame 10,633,565.00 10,633,565.00 10,633,565. C Walling 4,643,100.00 4,643,100.00 2,713,100. D Roof 4,778,250.00 4,778,250.00 1,598,520. E (^) Windows 1,891,450.00 1,891,450.00 2,635,880. F (^) Doors 3,625,900.00 3,625,900.00 2,254,464. G (^) External Finishes 479,500.00 479,500.00 479,500. H Internal Finishes 8,296,800.00 8,296,800.00 0. H Fixtures and fittings 6,437,100.00 6,437,100.00 2,215,000. J Plumbing and Drainage 3,558,280.00 3,558,280.00 1,358,070. EXTERNAL WORKS K Boundary wall 3,826,650.00 3,826,650.00 3,826,650. L Landscaping 977,100.00 977,100.00 898,740. M Road works and Footpath 2,646,950.00 2,646,950.00 917,400. N Foul water drainage 1,633,200.00 1,633,200.00 0. O Stormwater drainage 1,386,300.00 1,386,300.00 1,387,500. CARRIED FORWARD 69,026,106.00 69,026,106.00 43,666,029.
A Electrical Works 5,150,000.00 5,150,000.00 1,150,000. MATERIALS ON SITE H Materials 4,869,000. TOTAL VALUE FOR WORK DONE AT 75%