Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

FDNYC G60 Study Exam tested questions with revised correct answers a+ guarantee, Exams of Safety and Fire Engineering

1. FDNY G60 Fire Guard exam study materials 2. How to prepare for FDNY G60 Fire Guard test 3. FDNY G60 Fire Guard exam practice questions 4. FDNY G60 Fire Guard certification requirements 5. FDNY G60 Fire Guard exam passing score 6. FDNY G60 Fire Guard exam scheduling process 7. FDNY G60 Fire Guard exam retake policy 8. FDNY G60 Fire Guard exam locations in NYC 9. FDNY G60 Fire Guard exam fees and payment options 10. FDNY G60 Fire Guard exam duration and format 11. FDNY G60 Fire Guard exam topics and syllabus 12. FDNY G60 Fire Guard exam online registration 13. FDNY G60 Fire Guard exam preparation courses 14. FDNY G60 Fire Guard exam sample questions PDF 15. FDNY G60 Fire Guard exam study guide download 16. FDNY G60 Fire Guard exam tips and tricks 17. FDNY G60 Fire Guard exam renewal process 18. FDNY G60 Fire Guard exam for non-English speakers 19. FDNY G60 Fire Guard exam accommodations for disabilities

Typology: Exams

2024/2025

Available from 06/09/2025

stacey-studyguide
stacey-studyguide šŸ‡ŗšŸ‡ø

509 documents

1 / 48

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
1 / 24
FDNYC G60 Study Exam Questions And Answers (Verified)
1. Certificate of Fitness: fire watch for torch operations conducted at the fol- lowing three locations
shall be conducted by at least one F-60 fire guard
: 1- construction sites
2-in any building or structure, when the torch operation is conducted by a person holding a citywide permit
for torch operations
3-on any rooftop, or in connection with any torch-applied roofing system operation
2. Certificate of fitness holder must...
: Keep the certificate of fitness upon his or her person, or otherwise readily available for inspection by any
representative of the department, at all times while conducting or supervising the material, operation or
facility for which the certificate is required
3. The F-60 Certificate of Fitness holder is required to comply with the following FDNY cod
and rules section
:: -Welding and other hot work
-Fire prevention during welding, cutting and other hot work
-liquefied petroleum gases
-compressed natural gasses
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21
pf22
pf23
pf24
pf25
pf26
pf27
pf28
pf29
pf2a
pf2b
pf2c
pf2d
pf2e
pf2f
pf30

Partial preview of the text

Download FDNYC G60 Study Exam tested questions with revised correct answers a+ guarantee and more Exams Safety and Fire Engineering in PDF only on Docsity!

FDNYC G60 Study Exam Questions And Answers (Verified)

1. Certificate of Fitness: fire watch for torch operations conducted at the fol- lowing three locations

shall be conducted by at least one F-60 fire guard : 1- construction sites

2-in any building or structure, when the torch operation is conducted by a person holding a citywide permit

for torch operations

3-on any rooftop, or in connection with any torch-applied roofing system operation

2. Certificate of fitness holder must...

: Keep the certificate of fitness upon his or her person, or otherwise readily available for inspection by any representative of the department, at all times while conducting or supervising the material, operation or facility for which the certificate is required

3. The F-60 Certificate of Fitness holder is required to comply with the following FDNY cod

and rules section :: -Welding and other hot work -Fire prevention during welding, cutting and other hot work -liquefied petroleum gases -compressed natural gasses

4. FDNY permits 3 of the following

: 1- storing, using or handling oxygen and a flammable gas, or

2- storing, using or handling any flammable gas in excess of 400 SCF or

3- storing, using or handling any oxidizing gas (ex. oxygen) in excess of 504 SCF

5. LPG - 400 SCF is how many pounds

?: 47 lbs.

6. List of the number of LPG containers for storage, use, handling or trans- portation, requiring a

permit : 14.1 oz= 54 16.4 oz = 46 20 lbs = 3 33.5 lbs = 2 40 lbs = 2 100 lbs = 1

7. LPG

: portable LPG containers that are more than 16.4 oz and CNG contain- ers with a capacity greater than 8.7 SCF must NOT stored, handled, or used indoors/roof in the following occupancies.... -residential areas -factory and industrial occupancies

8. Use of LPG/Propane on an occupied roof requires...

: An affidavit from a licensed professional (Architect or Engineer) stating the roof is constructed of non- combustible material(s)

9. Any single standard LPG must not exceed...

: 100 lbs in weight

10. Any single CNG container must not exceed...

: 381 SCF

11. Site Specific Permit

: -authorizes the permit holder to store, handle, or use flammable gases, or conduct a torch operational a specific premises or location -may be temporary or permanent -permanent good for 12 months only -temporary are good anywhere from 1 day to 12 months depends on the construc- tion/operation needed

12. City-Wide Permit: -authorizes the permit holder to store, handle, use or sell hazardous materials, or

conduct an operation on a citywide basis

13. CityWide Permits are valid to temporarily store, handle, use, or sell haz- ardous materials or to

conduct an operation at one or more locations subject to the following restrictions:: -the duration of such activity at any individual location does not exceed 30 calendar days and all hazardous materials associated with such activity are removed from the location at the end of the workday. Periods of activity in excess of 30 calendar days at one location shall require a site-specific permit -the quantity of hazardous materials being temporarily stored and used foes not exceed 5 gallons of gasoline, or 250 gallons of any other flammable liquid, and 300 gallons of any combustible liquid. Storage or use of hazardous materials in quantities exceeding these amounts requires a site-specific permit for each location at which such storage or use occurs

14. Transportation permit: -authorizes the permit holder to transport, pick up and deliver hazardous

materials. Any person who transports any hazardous material in the quantity of requiring a FDNY permit has to apply for a FDNY transportation permit. -The FDNY transportation permit sticker must be displayed on the vehicle

15. Permits: -not all are transferable

-any change in occupancy, operation, tenancy or ownership requires that a new permit be issued -The certificate of fitness holder is responsible for making sure that all fire safety regulations and procedures are obeyed on the premises

-world's leading advocate of fire prevention and an authoritative source on public safety -NFPA develops, publishes and disseminates more than 300 consensus codes and standards intended to minimize the possibility and effects of fire and other risks

25. Responsbile person: A person trained in the fire safety hazards associated with hot work, and in the

necessary and appropriate measures to minimize those hazards, who is designated by the owner of a premise to authorize the performance of hot work at the premises

26. Torch Applied Roof-System: Bituminous roofing systems using membranes that are adhered by

heating with a torch and melting asphalt back coating instead of mopping hot asphalt for adhesion.

27. Causes of fires...: -usually note the flame

-usually thousands of sparks and pieces of hot metal that are generated when using the torch -the sparks and pieces of hot metal are all possible sources of ignition -sparks and pieces of hot metal are the source of ignition in about 60% of all fires in the industrial occupancies

28. Hot work operation with citywide permit: -the owner of the premises of the hot work operation

areas must be notified in writing by the citywide permit holder at least 48 hours before the hot work is to be started

29. All hot work operations: -owner of the hot work operation areas must desig- nate a responsible

person -the responsible person must ensure that the hot work is performed in compliance with the terms and conditions of the permit -the person should inspect the hot work site prior to issuing the hot work autho- rization to ensure that it is a fire safe area -he/she need to periodically monitor the work as it is performed to ensure no fire safety hazards -hot work operations must be conducted under the gerbil supervision of the responsible person

30. Before hot work is authorized and at least once per day while authoriza- tion is in effect. the hot

work area shall be inspected by the responsible person to ensure that it is a fire safe area

31. Pre-hot work check: -must be conducted by responsible person before hot work authorization and

at least once per day -check reports must be kept at worksite during work, made available by FDNY rep -must be maintained on premises for a minimum of 48 hours after work is complete

32. A pre-hot work check must verify the following: 1-the hot work equip. is in good working order

2-the hot work area is clear of combustibles and flammable solids (35 feet rule and 25

6-fire watch personnel, where required, are assigned

7-approved actions have been taken to prevent accidental activation of fire extin- guishing systems and

detection equipment (sprinkler protection and fire detection systems)

8-portable fire extinguishers and fire hoses (where provided) are operable and available

9-all persons performing hot work possess certificates of fitness, where such certificates are required

10-all persons performing hot work requiring a permit possess a site-specific permit or citywide

permit, authorizing such work

33. 25 feet rule for other hot work operation: all other hot work operations shall be conducted at least

25 feet from combustible materials and combustible waste shall be provided with appropriate shielding to prevent sparks, slag, or heat from igniting exposed combustibles

34. 35 feet rule for cutting and welding operation: hot work operations involving cutting or welding shall

be conducted at least 35 feet from combustible materials and combustible waste shall be provided with appropriate shielding to prevent sparks, slag, or heat from igniting exposed combustibles

35. Gas torch operations precautions: -each person must operate only one torch at a time and

such torch must not be left unattended while ignited -the torch equip should only be used for the purpose for which it was intended -it should not be used for any tricks or stunts

36. Protection of combustibles: -areas designed for hot work operations shall have floors with

noncombustible surfaces -paper, wood shavings, straw and fabric are examples of combustible materials -hot work operations involving cutting or welding shall be conducted at least 35 feet away from combustible materials and combustible waste or shall be provided with appropriate shielding to prevent sparks, slag or heat from igniting combustibles

37. combustable waste: -shall not be allowed to accumulate on floors and other surfaces within the hot

work area -hot work areas shall be regularly cleaned and combustible waste removed and disposed lawfully

-combustible materials should be moved to safe location -if relocation impractical, then combustibles, openings or cracks in walls, floors, ducts or shafts with 35 feet of hot work area must be tightly covered to prevent the passage of sparks to adjacent combustible areas, or shielded by metal or fire-retardant guards, or provided with curtains to prevent passage of sparks or slag

heating with a torch and melting asphalt back coating instead of mopping hot asphalt for adhesion

45. At a construction site and torch-applied roofing system operation...: - every torch operator must

also have a person performing fire watch by a F-60 fire guard -EXCEPTION... the single fire guard may be designated to conduct a fire watch for more than one torch operation on the same floor or level if each torch operation is not more than 50 feet from the fire guard, as measured by the actual path of travel, and the field of view of such fire guard encompasses all of the horizontal fire exposures of such torch operations

46. Fire watch on floors below...: additional F-60 fire guard is required to perform fire watch on floor

below if the torch operation is being conducted at or near the edge of an unenclosed floor of a building, or near a floor opening, or other location where sparks and slag may travel or more lower floors or levels

47. Exception to fire watch on floors below...: -a fire watch is not required on the floors/levels below a

torch operation on a construction site when ALL the following conditions are met:

1.the torch operation is not being conducted at or near the edge of an unenclosed floor of a building

2.the floor upon which the torch operation is being conducted is of noncombustible construction

3.there are no floor or exterior building openings within 35 feet of the torch operation AND

4-prior to commencement of the torch operation, the fire safety manager or re- sponsible person conducts an inspection and takes the precautions to protect any combustible surfaces and materials that potentially would be exposed to sparks and slag from the torch operation

48. Exception to fire watch on floors below... (pt2): if sparks or slag generated by the torch operation

are observed to extend beyond 35 feet, thereby potentially exposing lower floors or levels, the torch operation stops -and the floors or levels below shall be inspected for any fire condition -if there are any potential exposure surfaces or materials on the floors below from such sparks and slag, noncombustible barriers shall be provided and any other necessary or appropriate precautions shall be provided and any other necessary or appropriate precautions shall be taken -if such barriers and precautions fail to block the passage of sparks and slag, a fire watch shall be established on the floors or levels below

49. Time and record keeping requirement: -fire watch must be maintained dur- ing any hot work

operation

work -the commissioner or the responsible person implementing a hot work program, may extend the duration of the fire watch based on the hazards or work being performed

50. CNG and LPG inspection timing...: -the first inspection shall be conducted 30 minutes after

completion of torch operations; -the second inspection 1 hour after completion of torch operations -this is to make sure that there are no smoldering fires in the building -fire guard must complete a signed inspection report -fire guards or fire watch personnel must complete a signed inspection report or logbook -this report must must be submitted to and retained by the person in charge of the torch operations -the inspection report must be made available to any representative of the fire department and should be maintained on the premises for reasonable length of time (ex. 48 hours) after work is complete

51. Emergency notification: -fire guard can use wireless phone to make emer- gency notifications

(make sure that battery is charged to last the entire shift) -notifying FDNY by phone is the most direct and effective way to make notification of an emergency

52. When notifying 911 of fire or other emergency...: -caller must know the nature of the emergency,

address, if anyone is in need of medical attention and what their symptoms are -provide entrance information with the most direct access to the emergency area -the phone number you are calling from -nature of the emergency details about the emergency -fire guard should be there to meet emergency responders to provide them with information regarding the nature of the emergency, its location on the construction site and to provide the information that the emergency responders request

53. Fire hoses: where hose lines are required, they shall be connected, charged and ready for operation

54. Sprinkler protection: sprinkler system protection shall not be shut off or impaired while hot work is

performed unless approved by the commissioner. where hot work is performed close to sprinklers, noncombustible barriers or damp cloth guards shall shield the individual sprinkler heads and shall be

removed when the work is completed. If the work extends over several days, the shields shall be removed at the end of each work day

64. Extinguished piped gas: -for piped gas, the gas supply must be shut off first then call 911

-never attempt to extinguish the flame unless the gas supply is shut -when not possible to shut off the gas supply (e.g. the fire is near the control valve or the shut-off valve) and the gas supply is limited (e.g. it is from a cylinder) allow

the flame to burn itself out and call 911 -in meantime, prevent fire spreading to the surrounding materials

65. Class A fire: -Fires caused by ordinary combustibles such as wood, paper, cloth, and plastic fires

-to extinguish a class A fire, these extinguishers utilize either the heat-absorbing effects of water or the coating effects of certain dry chemicals

66. Class B Fire: -fires are caused by flammable or combustible liquids and gases such as oil, gasoline,

etc. -to extinguish..the blanket-smothering effect of oxygen excluding media such as CO2, dry chemical or foam is most effective

67. Class C Fire: -fires that involve electrical equipment

-these fires must be fought with extinguishers that do not conduct electricity -foam and water type extinguishers must not be used to extinguish electrical fires -after shutting off the electrical equipment, extinguishers for Class A or B fires may be used

68. Class D Fire: -fires caused by ignitable metals, such as magnesium, titanium, and metallic sodium, or

metals that are combustible under certain conditions, such as calcium, zinc, and aluminum -generally, water should not be used to extinguish these fires

69. Fire extinguisher inspections: -must be done monthly

-owner of premises is responsible to designate a person to perform a monthly inspection -"quick check"

70. CNG: Compressed natural gas

71. LPG: liquefied petroleum gas

72. Personal Supervision: Supervision by the holder of any department certifi- cate who is required to be

personally present on the premises, or other proximate location acceptable to the department, while the duties for which the certificate is required is being performed.

73. SCF: Standard Cubic Feet