Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

FDNYC G60 Practice tested questions with revised correct answers, a+ guarantee, Exams of Safety and Fire Engineering

1. FDNY G60 Fire Guard exam study materials 2. How to prepare for FDNY G60 Fire Guard test 3. FDNY G60 Fire Guard exam practice questions 4. FDNY G60 Fire Guard certification requirements 5. FDNY G60 Fire Guard exam passing score 6. FDNY G60 Fire Guard exam scheduling process 7. FDNY G60 Fire Guard exam retake policy 8. FDNY G60 Fire Guard exam locations in NYC 9. FDNY G60 Fire Guard exam fees and payment options 10. FDNY G60 Fire Guard exam duration and format 11. FDNY G60 Fire Guard exam topics and syllabus 12. FDNY G60 Fire Guard exam online registration 13. FDNY G60 Fire Guard exam preparation courses 14. FDNY G60 Fire Guard exam sample questions PDF 15. FDNY G60 Fire Guard exam study guide download 16. FDNY G60 Fire Guard exam tips and tricks 17. FDNY G60 Fire Guard exam renewal process 18. FDNY G60 Fire Guard exam for non-English speakers 19. FDNY G60 Fire Guard exam accommodations for disabilities

Typology: Exams

2024/2025

Available from 06/09/2025

stacey-studyguide
stacey-studyguide 🇺🇸

509 documents

1 / 6

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
1 / 3
FDNYC G60 Practice Exam Questions And Answers
(Verified Answers)
1. The pre-hot work check must be conducted by the responsible person...-
ANS Once per day
2. Piped gas lines should be... ANS Shut off if there is a fire
3. Don't aim the fire extinguisher at... ANS center of the flame
4. When it is not possible to shut off a gas supply and the gas supply is limited, you should....
ANS allow the fire to burn itself out and call 911
5. Trained Certificate of Fitness holders should only attempt to extinguish fires that are.... ANS
limited in size and can be readily extinguished
6. Class A fire are caused by... ANS ordinary combustible materials
7. Class B fire are caused by... ANS flammable or combustible liquids
8. Class C fires are caused by... ANS electrical equipment
9. Class D fires are caused by... ANS ignitable metals
pf3
pf4
pf5

Partial preview of the text

Download FDNYC G60 Practice tested questions with revised correct answers, a+ guarantee and more Exams Safety and Fire Engineering in PDF only on Docsity!

FDNYC G60 Practice Exam Questions And Answers

(Verified Answers)

1. The pre-hot work check must be conducted by the responsible person...-

ANS Once per day

2. Piped gas lines should be... ANS Shut off if there is a fire

3. Don't aim the fire extinguisher at... ANS center of the flame

4. When it is not possible to shut off a gas supply and the gas supply is limited, you should....

ANS allow the fire to burn itself out and call 911

5. Trained Certificate of Fitness holders should only attempt to extinguish fires that are.... ANS

limited in size and can be readily extinguished

6. Class A fire are caused by... ANS ordinary combustible materials

7. Class B fire are caused by... ANS flammable or combustible liquids

8. Class C fires are caused by... ANS electrical equipment

9. Class D fires are caused by... ANS ignitable metals

10. Flames must be approached from a position. ANS upwind

11. Never approach a flame from a position. ANS downwind

12. Never point a fire extinguisher at the... ANS center of the flame

13. You must point a fire extinguisher at where... ANS the flame begins

14. P.A.S.S stands for... ANS Pull Aim Squeeze Sweep

15. All fire extinguishers must be installed so that they're no more than

feet from the top of the extinguisher and the bottom must not be less than inches from the floor. ANS 5, 4

16. How many feet should a fire extinguisher be within a hot-work area and the fire guards? ANS

30 feet

17. Any single CNG container must not exceed SCF ANS 381

18. LPG Containers must be tested by the DOT approved vendors every

years. ANS 5

20. The use of nonmetallic pipe tubing, or hose for permanently interconnect- ing gas containers is

. ANS prohibited

21. Generally speaking, nonmetallic pipe, tubing and components for any in- stallation, appliance or

equipment using LPG or CNG is prohibited. However, nonmetallic hose may be allowed at. ANS construction sites

22. Hoses must be protected from and no hose is allowed to exceed

feet. ANS physical damage, 30

23. What is Flashback? ANS when a flame burns inside a torch or hose

24. When Flashback happens and there is a hissing/whistling noise, what should you do? ANS

close control valves, close gas container

25. What is Backfire? ANS when the flame on a torch goes out unexpectedly

26. An Acetylene container valve must not be turned more than

turns. ANS 1 ½

27. Soldering and Brazing temperatures are typically F ANS 840

28. For any CNG or LPG torch operation, the first inspection shall be conduct- ed minutes

after completion of torch operations; the second inspection hour after completion of torch operations. ANS 30, 1

29. For any CNG or LPG torch operation, the FIRST inspection shall be conducted

minutes after completion of torch operations ANS 30

30. For any CNG or LPG torch operation, the SECOND inspection shall be conducted hour after

completion of torch operations ANS 1

31. The inspection report must be made available to any representative of the Fire Department and

should be maintained on the premises for... ANS 48 hours

32. Torch Applied Roof-System ANS Bituminous roofing systems using membranes that are adhered by

heating with a torch and melting asphalt back coating instead of mopping hot asphalt for adhesion.

33. It shall be unlawful to install any roofing material using a torch on a roof of... ANS combustible

construction

34. Ducts and conveyor systems that might carry sparks

to distant combustibles must be... ANS shielded, or shut down, or both

35. For hot work operation with citywide permit, the owner of the premises of the hot work

operation areas must be notified in writing by the citywide permit holder at least days before the hot work is to be started. ANS 2