



Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
A step-by-step guide for students to create a preliminary schedule for a conveyor belt project using software, analyze resources' impact, and generate a cash flow statement. Designed for university students studying project management, particularly in the context of construction or engineering. It includes a hint for generating a monthly cash flow statement in microsoft project.
Typology: Assignments
1 / 5
This page cannot be seen from the preview
Don't miss anything!
Part 1 WBS from the given information.
Part 2 This exercise deals with using software to create a preliminary schedule of the project based on the information provided in Part 1.
Part 3 Part A At this stage resources and their impact on the project are introduced.
Part 4 Use the schedule they created as a result of Part 3 (B) to create a cash flow statement for the project. Hint : The default option in MS Project for cash flow is by week. You can generate a monthly cash flow statement by using the “Edit” function in the Custom option under Reports.