Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
A wide range of topics related to crane safety and operation, including proper crane setup, load handling, personnel hoisting, wire rope inspection, and regulatory requirements. It provides detailed information on crane capacities, load charts, outrigger positioning, power line clearances, and other critical aspects of crane operations. Likely intended for crane operators, riggers, and other personnel involved in crane-related work to ensure safe and compliant practices. The comprehensive coverage of crane-specific standards, regulations, and best practices makes this document a valuable resource for anyone working with or around cranes in the construction or industrial sectors.
Typology: Exams
1 / 16
This page cannot be seen from the preview
Don't miss anything!
c. 20%. d. 30%. - ✔✔c.
c. 1926. d. 1910.184 - ✔✔b.
b. It depends if the idler or sprocket are in line or offset from the track rollers c. It is through the centerline of the crane cab d. It is through the boom butt section - ✔✔b.
c. Never d. During assembly/disassembly operations - ✔✔d.
b. CDL with on the job training c. Physical, Written Test, Practical Test d. CDL physical, employers written permission - ✔✔c.
b. 20% c. 30% d. none - ✔✔b.
What shall be in the operator's cab during crane operations? - ✔✔Load charts Which of the following is considered duty-cycle work? - ✔✔Clam-shell digging When doing duty cycle work, the load chart must be reduced by how much? - ✔✔20% Which components are not parts of the boom? - ✔✔Heel pins The boom angle is the angle between ___________________. - ✔✔the ground and centerline of the boom, between sheaves and heel pins Three short audible signals mean - ✔✔back-up According to ANSI B30.5, hand signal chart shall be posted where? - ✔✔On the job site A signal person shall be ________________. - ✔✔designated person, tested An anti-two-block device can be used _________________. - ✔✔to test the LMI Cranes should be load tested when? - ✔✔After modifications Upon completion of assembly of the crane, what must be done? - ✔✔An inspection to ensure that manufacturer specifications are met During crane assembly, the counter weight should be installed when? - ✔✔Before raising the boom A long boom crane at a short radius and out of level by 300 can see a reduction incapacity by as much as:
With the hook in the extreme low position, how many wraps shall remain on the load hoist drum? - ✔✔ 2 Load hoist sheaves and boom tip sheave shall have pitch diameters not less than times the nominal diameter of the rope used. - ✔✔ 18 Per ANSI B30.5, when operating near high voltage line of 250 KV the minimum clearance is ___________________. - ✔✔20 FT Per ANSI B30.5, when in transit under power lines of 350 KV the minimum clearance is? - ✔✔16 FT