CQM-C Questions and Answers Already Passed, Exams of Quality Management

The purpose of Construction Quality Management is to: ✔✔Achieve the quality established by properly developed requirements through the combined responsibility, but seperate efforts of contractpr smd government personnel. Construction Quality Management is the performance of tasks, which ensure that construction is performed. ✔✔According to plans and specifications, on time, within a defined budget and a safe work environment. Partnering relationships are based upon: ✔✔Building trust and dedication to common goals

Typology: Exams

2024/2025

Available from 01/06/2025

tizian-kylan
tizian-kylan 🇺🇸

2.7

(21)

3.8K documents

1 / 7

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
CQM-C Questions and Answers Already
Passed
The purpose of Construction Quality Management is to: ✔✔Achieve the quality established by
properly developed requirements through the combined responsibility, but seperate efforts of
contractpr smd government personnel.
Construction Quality Management is the performance of tasks, which ensure that construction is
performed. ✔✔According to plans and specifications, on time, within a defined budget and a
safe work environment.
Partnering relationships are based upon: ✔✔Building trust and dedication to common goals
It is the responsibility of Quality Assurance Personnel to: ✔✔Periodically verify that the
contractors system of control is working effectively.
An effective contractor quality control program will: ✔✔Be an incentive for work to be done
correctly the first time resulting in earlier completion, reduced field overhead costs, and greater
profits.
pf3
pf4
pf5

Partial preview of the text

Download CQM-C Questions and Answers Already Passed and more Exams Quality Management in PDF only on Docsity!

CQM-C Questions and Answers Already

Passed

The purpose of Construction Quality Management is to: ✔✔Achieve the quality established by properly developed requirements through the combined responsibility, but seperate efforts of contractpr smd government personnel.

Construction Quality Management is the performance of tasks, which ensure that construction is performed. ✔✔According to plans and specifications, on time, within a defined budget and a safe work environment.

Partnering relationships are based upon: ✔✔Building trust and dedication to common goals

It is the responsibility of Quality Assurance Personnel to: ✔✔Periodically verify that the contractors system of control is working effectively.

An effective contractor quality control program will: ✔✔Be an incentive for work to be done correctly the first time resulting in earlier completion, reduced field overhead costs, and greater profits.

The success or failure of all contractors is based upon: ✔✔The ability to control costs, finance work, estimate jobs, schedule the work, and maintain effective quality control.

Quality Assurance Personnel have the responsibility to: ✔✔Require contractors to maintain the quality specified in the plans and specifications.

Inspection is: ✔✔The process by which ongoing and completed work is examined

During the punch-out inspection of a project: ✔✔Quality Assurance Personnel must assure that the contractor prepares a punch-list and makes corrections.

If there is a disagreement whether the contractors work complies with the contract: ✔✔The government makes the final determination

Characteristics that describe a definable feature of work include: ✔✔Cross-referenced listings to the contractors construction schedule that may have more than one definable feature under a section of the specifications.

If initial review of the quality control plan shows it to be unacceptable: ✔✔The contractor makes changes before acceptance.

The contractor quality control organization: ✔✔May vary in size depending on the work being performed at a point in time.

The Quality Control Plan contains: ✔✔Identification of individual quality quality control personnel, including name, qualifications, assigned duties, responsibilities and authorities.

The preconstruction conference and the coordination and mutual understanding meeting (Navy) are: ✔✔Conducted prior to the commencement of any physical construction work.

A cumulative list of job deficiencies/rework items can be found in: ✔✔A deficiency tracking system/reworks items list.

What is a purpose of the coordination and mutual understanding and meeting (Navy)? ✔✔To review the QC Plan with the contractor.

Which of the following is included in all three phases of the Three Phases of Control. ✔✔Safety.

Submittals are: ✔✔Necessary to demonstrate that the proposed materials, etc. are in compliance with the contract.

All submittals for government approval must be provided by the _________________ in time to allow for the review, approval, procurement, delivery, and performance of preparatory phase for an item before it is needed for construction. ✔✔Contractor to the Government

The means for enforcing contract compliance are provided in the: ✔✔Contract clauses of the contract.

ENG Form 4288-R, the submittal register: ✔✔Identifies those submittals requiring government approval

The primary purpose of the Three-Phase control system is to: ✔✔Require the contractor to plan and schedule his work.

The contractor is required to conduct a preparatory phase meeting before he begins any definable feature of work except when: ✔✔There are no exceptions to the rule.

Actual construction on the job site begins: ✔✔After an interim or final QC Plan is accepted.

Contractor testing procedures: ✔✔Are outlined in the Quality Control Plan as defined by Section 01450N/01451A and addressed at the Coordination and Mutual Understanding Meeting (Navy).

Requests for information are submitted to: ✔✔Ask for clarification of the contract

Design-Build contracts require: ✔✔The QC Manager to be in place and take an active role in the review and coordination of the design.