



Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
CQM-C | LATEST UPDATE COMPREHENSIVE QUESTIONS (Frequently Most Tested) AND VERIFEID ANSWERS (100% accurate)|GET IT A+
Typology: Exams
1 / 7
This page cannot be seen from the preview
Don't miss anything!
The Purpose Of Construction Quality Management Is To: Construction Quality Management Is The Performance Of Tasks, Which Ensure That Construction Is Performed. Partnering Relationships Are Based Upon: It Is The Responsibility Of Quality Assurance Personnel To: An Effective Contractor Quality Control Program Will: The Success Or Failure Of All Contractors Is Based Upon: Quality Assurance Personnel Have The Responsibility To: Achieve The Quality Established By Properly Developed Requirements Through The Combined Responsibility, But Seperate Efforts Of Contractpr Smd Government Personnel. According To Plans And Specifications, On Time, Within a Defined Budget And a Safe Work Environment. Building Trust And Dedication To Common Goals Periodically Verify That The Contractors System Of Control Is Working Effectively. Be An Incentive For Work To Be Done Correctly The First Time Resulting In Earlier Completion, Reduced Field Overhead Costs, And Greater Profits. The Ability To Control Costs, Finance Work, Estimate Jobs, Schedule The Work, And Maintain Effective Quality Control. Require Contractors To Maintain The Quality Specified In The Plans And Specifications. Inspection Is: The Process By Which Ongoing And Completed Work Is Examined
During The Punch- Out Inspection Of a Project: If There Is a Disagreement Whether The Contractors Work Complies With The Contract: Characteristics That Describe a Definable Feature Of Work Include: The _____________________ Consists Of Daily Checks Of The Work To Assure Continuing Compliance With Contract Requirements. The Quality Assurance Plan: Testing Is Extremely Important In Construction Quality Management And Is Performed By: If The Contractor Does Not Provide An Adequate Superintendent, The Contract Allows The Contracting Officer To: Quality Assurance Personnel Must Assure That The Contractor Prepares a Punch-List And Makes Corrections. The Government Makes The Final Determination Cross-Referenced Listings To The Contractors Construction Schedule That May Have More Than One Definable Feature Under a Section Of The Specifications. Follow-Up Phase Is a Government Management Tool Establishing Staffing, Training, Pre-Award Activities, And Surveillance Activities. Both The Contractor And The Government Require The Contractor To Assume Personal Supervision Of The Work. The Quality Control Plan: Is The Foundation Upon Which Quality Work Is Based And Outlines Planned Quality Control Procedures. Tests That Are Unannounced, Randomly Performed, And Repeat
If Initial Review Of The Quality Control Plan Shows It To Be Unacceptable: The Contractor Quality Control Organization: The Quality Control Plan Contains: The Preconstruction Conference And The Coordination And Mutual Understanding Meeting (Navy) Are: A Cumulative List Of Job Deficiencies/Rework Items Can Be Found In: What Is a Purpose Of The Coordination And Mutual Understanding And Meeting (Navy)? Which Of The Following Is Included In All Three Phases Of The Three Phases Of Control. The Contractor Makes Changes Before Acceptance. May Vary In Size Depending On The Work Being Performed At a Point In Time. Identification Of Individual Quality Quality Control Personnel, Including Name, Qualifications, Assigned Duties, Responsibilities And Authorities. Conducted Prior To The Commencement Of Any Physical Construction Work. A Deficiency Tracking System/Reworks Items List. To Review The Qc Plan With The Contractor. Safety. Submittals Are: Necessary To Demonstrate That The Proposed Materials, Etc. Are In Compliance With The Contract.
All Submittals For Government Approval Must Be Provided By The ___________ In Time To Allow For The Review, Approval, Procurement, Delivery, And Performance Of Preparatory Phase For An Item Before It Is Needed For Construction. The Means For Enforcing Contract Compliance Are Provided In The: Eng Form 4288 - R, The Submittal Register: The Primary Purpose Of The Three-Phase Control System Is To: The Contractor Is Required To Conduct a Preparatory Phase Meeting Before He Begins Any Definable Feature Of Work Except When: The _____________ Is The Appropriate Time To Assure That All Materials And/Or Equipment Have Been Tested, Submitted, And Approved. The _____________ Is Workmanship Oriented, And Where Workmanship Standards Are Established.
The Contract Requires The Contractor To Submit Quality Control Reports: The Quality Control Report Should Address: The Quality Assurance Report Is The Governments Record Of Project-Related Events And Is Prepared _______________. Grounds For Withholding Payment Include The Contractors Failure To: Actual Construction On The Job Site Begins: Contractor Testing Procedures: Requests For Information Are Submitted To: Design-Build Contracts Require: Daily. Both Work Completed And Control Activities For Each Visit Day Perform In Accordance With The Terms Of The Contract, Provide a Quality Control Plan Giving Assurance Of Intent And Ability To Comply With Quality Standards, And Build To The Quality Standards Established By The Contract. After An Interim Or Final Qc Plan Is Accepted. Are Outlined In The Quality Control Plan As Defined By Section 01450N/01451A And Addressed At The Coordination And Mutual Understanding Meeting (Navy). Ask For Clarification Of The Contract The Qc Manager To Be In Place And Take An Active Role In The Review And Coordination Of The Design.