CQM-C EXAM QUESTIONS AND ANSWERS GRADED A+, Exams of Medicine

CQM-C EXAM QUESTIONS AND ANSWERS GRADED A+

Typology: Exams

2024/2025

Available from 04/11/2025

gloria-tirkole-1
gloria-tirkole-1 🇺🇸

33 documents

1 / 7

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
For design-build contracts what additional requirements must be included in the QC plan? -
It includes design quality and the performance of constructability, operability and
environmental review of the design.
What is the primary purpose of the three-phase control system? - To require the
contractor to plan and schedule the work to ensure that they are prepared to start each new
definable feature of work.
Regarding the three-phase control system, what are the responsibilities of quality control
personnel? - Develop, schedule, and implement procedures for tracking control phase
meetings for definable features of work in the QC plan.
How often are QC and QA Reports required? - Dailyb. QA (Government Quality
Assurance)
Define CQC: - is to assure that the completed project meets all quality requirements
of the contract.
Define QA: - Quality Assurance personnel have the responsibility to require
contractors to maintain the quality specified in the plans and specifications.
What are the benefits of CQM to the contractor? - increased profit and production,
better communication, planning, improved organizational skills, and outstanding
performance evaluations to obtain future contracts.
What are the benefits of CQM to the government? - work is performed according to
plans and specifications, on time, within a defined budget, easily maintained, and a safe
work environment.
What factors have caused the construction industry to become highly specialized? -
The factors that have caused this are the changing market, increased technology and
regulation.
Why are construction projects difficult to manage? - · Construction projects are
unique by nature, making standardization difficult.
· Construction operations involve many skills that are nonrepetitive and do not lend
themselves to an assembly line approach
· Construction projects are dependent upon environmental conditions which are beyond the
contractor's control
And subject to varied regulations from numerous government agencies.
What factors will influence both the Government and the construction industry in the
future? - · New government regulations
pf3
pf4
pf5

Partial preview of the text

Download CQM-C EXAM QUESTIONS AND ANSWERS GRADED A+ and more Exams Medicine in PDF only on Docsity!

For design-build contracts what additional requirements must be included in the QC plan? - It includes design quality and the performance of constructability, operability and environmental review of the design. What is the primary purpose of the three-phase control system? - To require the contractor to plan and schedule the work to ensure that they are prepared to start each new definable feature of work. Regarding the three-phase control system, what are the responsibilities of quality control personnel? - Develop, schedule, and implement procedures for tracking control phase meetings for definable features of work in the QC plan. How often are QC and QA Reports required? - Dailyb. QA (Government Quality Assurance) Define CQC: - is to assure that the completed project meets all quality requirements of the contract. Define QA: - Quality Assurance personnel have the responsibility to require contractors to maintain the quality specified in the plans and specifications. What are the benefits of CQM to the contractor? - increased profit and production, better communication, planning, improved organizational skills, and outstanding performance evaluations to obtain future contracts. What are the benefits of CQM to the government? - work is performed according to plans and specifications, on time, within a defined budget, easily maintained, and a safe work environment. What factors have caused the construction industry to become highly specialized? - The factors that have caused this are the changing market, increased technology and regulation. Why are construction projects difficult to manage? - · Construction projects are unique by nature, making standardization difficult. · Construction operations involve many skills that are nonrepetitive and do not lend themselves to an assembly line approach · Construction projects are dependent upon environmental conditions which are beyond the contractor's control And subject to varied regulations from numerous government agencies. What factors will influence both the Government and the construction industry in the future? - · New government regulations

· Greater degree of influence from the client · Improvement of QC and QA requirements · Construction-oriented management information system Increased contractual requirements for exchange of data in electronic format. Define Control and Inspection: - it is the process by which ongoing and completed work is examined to ensure that it complies with the contract provisions. While Control is a continual system of planning future activities to ensure that the work meets the quality standards of the contract. What is the difference between INSPECTION and CONTROL? - Inspection is ongoing or "after-the-fact" while control is "preventive." Who has contractual responsibility for quality control? - By the contract, the responsibility for quality control is vested in the contractor. Benefits of CQC to the Contractor? - Reducing costs by preventing rework and delays Increasing profits by delivering quality work that meet customer satisfaction Improving reputation by demonstrating competence and reliability Enhancing safety by identifying and eliminating hazards and risks. Benefits of CQC to the Government? - Effective CQC can improve public relations and client/customer satisfaction when projects are completed on time. QA personnel can take pride in their role of assuring that the contractor's CQC system is working effectively by delivering a quality product.. What is the role and responsibilities of the contractor in CQC? - The contractor is required to place a competent representative, the QC Manager, on the site to oversee the CQC system. What are the responsibilities of the contractor's QC Manager? - a. Controlling the quality specified in the plans and specifications. b. Developing and maintaining an effective CQC system. c. Stopping work. d. Performance of all control activities and tests

  • Procedures to complete deficiencies/rework items
  • Documentation procedures
  • List of DFOW
  • Procedure for the Three Phases of Control
  • Personnel Matrix
  • Procedures for completion inspection Name the actions that must be accomplished relative to the QC Plan before construction can begin. - It must be received, reviewed and formally accepted by the Contracting Officer. Name the phases of the "Three-Phase Control", and indicate when each is implemented. -
    • Preparatory Phase shall be performed prior to beginning work on each DFOW.
  • Initial Phase must be accomplished at the beginning of a DFOW.
  • Follow-up Phase consists of daily checks of the work to assure continuing compliance with contract requirements. What is the objective of the Post-Award Orientation Conference / Preconstruction Conference? - Its objective is to review the contract clauses to include accident prevention, administrative requirements, personnel requirements, and procedural matters. Why is the Post-Award Orientation Conference / Preconstruction Conference important? - Because it establishes the ground rules for administering the contract. Who schedules, convenes, and conducts the Coordination Meeting or the Mutual Understanding Meeting (Navy)? - Project engineer or the SGE, AROICC/AREICC and QA Representative. What are the primary purposes of the Coordination Meeting or the Mutual Understanding Meeting (Navy)? - a. To achieve a mutual understanding with the contractor of his/her role in quality control. b. To review the QC Plan with the contractor. The Government must receive and review the QC Plan before the meeting. Acceptance of the plan can be accomplished after the meeting. c. To establish a good working relationship between the Government and the contractor. Who attends the Coordination Meeting or the Mutual Understanding Meeting (Navy)? - Both contractor and government must be present.

What is the purpose of submittals? - It is required by the contract in order to regulate the timely flow of materials to be incorporated into work. They are necessary to demonstrate that the proposed materials, etc., are in compliance with the contract. What is the process of the contractor must use to request a variation? - The contractor must fully describe, identify and justify the variation in the transmittal package The contractor must indicate the variation on ENG Form 4025 R, which is used for transmitting submittals. What are the contractor's submittal responsibilities? - a. The contractor must integrate the submittal process into his QC Plan. He must delegate submittal responsibilities to the proper individuals on his staff. b. The contractor must assure that onsite management and, for design-build, the designer of record remains attentive to submittal procedures at all times. c. QC personnel and designer of record are responsible for ensuring, through detailed review, that all submittals are in full compliance with the contract. d. The contractor must review the Government prepared Submittal Register and add any needed additional submittals. e. The contractor must check the submittal schedule requirements against the Network Analysis System (NAS) or other approved construction schedule. f. The contractor constantly maintains and adjusts dates on the register as required by the contract activities to ensure the document reflects current information. g. The contractor assures that work must not be permitted to begin without properly approved submittals. h. The "Buy American Act - Construction Materials" must be considered in the submittal process because it significantly impacts what will be acceptable on Government projects. What are the Government's submittal responsibilities? - a. The Government will prepare a list of submittals required for each contract. This list will be prepared on a submittal register (ENG Form 4288R) b. Review a minimum 10% of FIO submittals. c. Review and approve submittals that are required to be GA. For design-build contracts, the Government will review submittals for conformance with the contract which includes the solicitation requirements and the contractor's accepted proposal.

e. Examine ongoing and completed work. f. Review QC documentation to assure adequacy. What is the primary function of CQC? - The primary function of CQC is the successful execution of a realistic plan to ensure that the required standards of quality construction will be met. What are the roles of QC personnel? - a. Produce the quality specified in the real plans and specification, and for design-build contracts in the Request of Proposal, as well as the contractor's accepted proposal b. Develop and maintain an effective CQC system c. Perform all control activities and tests, and d. Prepare acceptable documentation of CQC activities