Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

CQM-C Certification Exam Questions and Answers: A Guide to Construction Quality Management, Exams of Advanced Education

A valuable resource for students and professionals in construction management. it offers a series of questions and answers covering key aspects of cqm-c certification, including quality control plans, contract compliance, and the three-phase control system. The detailed explanations enhance understanding of construction quality management principles and practices. This resource is particularly useful for those preparing for the cqm-c certification exam or seeking to improve their knowledge of construction quality control.

Typology: Exams

2024/2025

Available from 04/30/2025

lyudmila-hanae
lyudmila-hanae 🇺🇸

1

(2)

7.8K documents

1 / 5

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
CQM-C Certification Exam With Complete Solutions A+
Graded 100% Solved Correctly
The contractor quality control organization: - ANSWER May vary in size depending on
the work being performed at a point in time.
A definable feature of work: - ANSWER Can consists of a combination of multiple
specification sections depending upon the nature of the work
An effective CQC program will: - ANSWER Be an incentive for work to be done correctly
the first time resulting in earlier completion, reduced field overhead costs, and greater
profits
The means for the government to enforce contract compliance are provided in the: -
ANSWER *Contract Clauses of the contract.*
If the Contractor does not provide an adequate superintendent, the Contracting Officer
may, under the contract, - ANSWER *Require the contractor to assume personal
supervision of the work.*
If initial review of the quality control plan shows it to be unacceptable: - ANSWER The
contractor corrects the plan, addressing the government comments, prior to
resubmission
The Quality Control Plan - ANSWER Is the basis upon which quality work is founded and
describes intended quality control processes.
If there is a dispute as to whether the contractor's work conforms to the contract: -
ANSWER The government decides
pf3
pf4
pf5

Partial preview of the text

Download CQM-C Certification Exam Questions and Answers: A Guide to Construction Quality Management and more Exams Advanced Education in PDF only on Docsity!

CQM-C Certification Exam With Complete Solutions A+

Graded 100% Solved Correctly

The contractor quality control organization: - ANSWER May vary in size depending on the work being performed at a point in time.

A definable feature of work: - ANSWER Can consists of a combination of multiple specification sections depending upon the nature of the work

An effective CQC program will: - ANSWER Be an incentive for work to be done correctly the first time resulting in earlier completion, reduced field overhead costs, and greater profits

The means for the government to enforce contract compliance are provided in the: - ANSWER Contract Clauses of the contract.

If the Contractor does not provide an adequate superintendent, the Contracting Officer may, under the contract, - ANSWER Require the contractor to assume personal supervision of the work.

If initial review of the quality control plan shows it to be unacceptable: - ANSWER The contractor corrects the plan, addressing the government comments, prior to resubmission

The Quality Control Plan - ANSWER Is the basis upon which quality work is founded and describes intended quality control processes.

If there is a dispute as to whether the contractor's work conforms to the contract: - ANSWER The government decides

Actual construction on the job site commences: - ANSWER After an interim or final QC Plan is approved.

Construction Quality Management is the implementation of activities, which provide confidence that construction will be carried out. - ANSWER In accordance with plans and specifications, on schedule, within a defined budget and an environment, which is safe to work in.

A cumulative list of job deficiencies/rework items could be found in: - ANSWER A deficiency tracking system/reworks items list, which is generally maintained within RMS.

Inspection is: - ANSWER The process of after-the-fact examination of ongoing and completed work.

It is the responsibility of Quality assurance Personnel to: - ANSWER Periodically verify that the contractor's system of control is working effectively.

The ______ consists of daily checks of the work to assure continuing compliance with contract requirements - ANSWER Follow-up phase

Design-Build contracts require: - ANSWER The QC Manager to be in place and take an active role in the review and coordination of the design

Which of the following is included in all three phases of the Three Phases of Control - ANSWER Safety

Construction Quality Management is to - ANSWER Achieve the quality established by properly developed requirements through the combined responsibility, but separate, efforts of contractor and Government personnel

Testing is very crucial in Construction Quality Management and is conducted by - ANSWER Both the contractor and the Government

Work in Progress

Work that has been completed

Problem areas

If the contractor has question in regard to the design under a design-build contract what would be the process to get an answer? - ANSWER The contractor submits a request for design verification to the contractor's design team.

Submittals are: - ANSWER Required to show the proposed materials, etc. are in conformance with the contract.

The success/failure of all contractors is based upon: - ANSWER The ability to control costs, finance work, estimate jobs, schedule the work and maintain effective quality control

the contract requires the contractor to submit quality control reports: - ANSWER daily

All submittals for government approval shall be furnished by the _________________ in time to allow for the review, approval, procurement, delivery, and performance of preparatory phase for an item before it is needed for construction. - ANSWER Contractor to the Government

Partnering relationships are based upon: - ANSWER Building trust and dedication to common goals

ENG Form 4288-R, the submittal register: - ANSWER Lists those submittals that are specified in the contract along with the associated submittal action codes

One of the purposes of the Coordination and Mutual Understanding Meeting (Navy): - ANSWER *The government and contractor meet to discuss implementation of the QC plan.

Characteristics that describe a definable feature of work (DFOW) include: - ANSWER Cross-referenced listings to the contactor's construction schedule that may have more than one definable feature under a section of the specifications. /// Task that is separate and distinct from other tasks which have separate quality control requirement

Requests for information are submitted to: - ANSWER Ask for clarification of the contract

The ____ is workmanship oriented, and where workmanship standards are established. - ANSWER Initial Phase.

Grounds for withholding payment include the contractors failure to: - ANSWER Perform in accordance with the terms of the contract, provide an acceptable Quality Control Plan, and build to the quality standards established by the contract