













Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
Detailed specifications for a construction project, including information on provisional works, preliminary works, earthworks, concrete works, and special structures. It includes measurements and quantities for various construction elements such as storage facilities, signage, excavations, foundations, columns, beams, slabs, and stairs. Organized in a structured format with codes, descriptions, units, quantities, dimensions, and subtotals, allowing for a comprehensive understanding of the project requirements. This level of detail is typical for construction planning and execution, providing the necessary information for contractors, engineers, and project managers to effectively coordinate and carry out the construction work.
Typology: Thesis
1 / 21
This page cannot be seen from the preview
Don't miss anything!
01.01.02 Almacén Glb 1 1.00 1. 01.01.08 Carteles Est 1 1.00 1. 01.02.00 INSTALACIONES PROVISIONALES 01.02.01 Agua para la Construcción Glb 1 1.00 1. 01.02.03 Energía Electrica Glb 1 1.00 1. 02.00.00 TRABAJOS PRELIMINARES 02.01.00 LIMPIEZA DEL TERRENO 02.01.01 Eliminación de basura y elementos sueltos livianos m3 1 17.50 8.25 0.10 14.44 14. 02.07.00 TRAZOS, NIVELES Y REPLANTEO 02.07.02 Trazos, Nvieles y Replanteo Preliminar m2 17.50 8.25 144.38 144. 03.00.00 MOVIMIENTOS DE TIERRA 03.02.00 EXCAVACIONES 03.02.01 Excavacion de Cisterna m3 6.25 2.00 2.40 30. 03.02.02 Excavación de Zanjas m Excavación de Zapatas m Z-1 4 1.20 1.20 1.20 6. Z-2 12 1.00 1.00 1.20 14. Excavación de Cimientos Corridos m Eje 1-1, entre eje A-A y C-C 1 8.00 0.50 1.00 4. Eje 2-2 entre eje B-B y C-C 1 1.98 0.50 1.00 0. Eje 3-3 entre eje A-A y C-C 1 4.99 0.50 1.00 2. Entre eje 3-3, 4-4 y eje A-A, B-B 1 7.00 0.50 1.00 3. Eje 4-4 entre eje A-A y B-B 1 3.12 0.50 1.00 1. Entre eje 4-4, 5-5 y eje A-A, C-C 1 8.28 0.50 1.00 4. Eje 6-6 entre eje A-A y C-C 1 5.49 0.50 1.00 2. Eje A-A entre eje 1-1 y 6-6 1 11.50 0.50 1.00 5. Eje B-B entre eje 1-1 y 6-6 1 4.30 0.50 1.00 2. Eje C-C entre eje 1-1 y 6-6 1 11.50 0.50 1.00 5.
05.03.01 Concreto en vigas de cimentación f'c=210 kg/cm2 m
-5
1 2.58 0.25 0.80 0.-5
1 2.58 0.25 0.20 0.-5
1 2.58 0.25 0.10 0.-5
1 2.58 0.25 0.40 0.-5
2 2.58 0.50 2.