Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
California Designated Operator 16 Study Guide With Correct Answers 2025.
Typology: Exams
1 / 13
This page cannot be seen from the preview
Don't miss anything!
The following are not "underground storage tanks" - correct answer.1. A farm Tank
A secondary containment system for a new tank which is not an integral part of the of the primary containment shall be - correct answer.designed and constructed according to an engineering specification approved by a state registered professional engineer or according to a nationally recognized industry code or engineering standard. The following requirements apply to non-integral secondary containment on new tanks - correct answer.1. Must contain 100% of the usable capacity of the primary containment for a single container
Secondary containment testing shall be conducted as follows: - correct answer.1. Tests shall be conducted according to manufacturer's requirements using a test procedure that demonstrates the system performs at least as well as it did at the time of installation.
of the associated equipment before doing any work and recertified at the recommended intervals or every 36 months. Existing UST - correct answer.This section applies to underground storage tanks installed before January 1, 1984 which contain a hazardous substance Owners or operators of existing underground storage tanks shall implement a monitoring program which is capable of detecting an - correct answer.unauthorized release from any portion of the system at the earliest possible opportunity Suction piping is exempt from monitoring requirements if it meets - correct answer.design and construction requirements The monitoring program shall comply with Title 23 and be approved by the local agency. The local agency can impose more stringent requirements based on - correct answer.site- and equipment-specific conditions. The monitoring program shall include - correct answer.written monitoring procedures and a response plan All portions of the underground storage tank system shall be visually monitored. This requirement may be waived if: - correct answer.1. It is not accessible for viewing (e.g., it is underground)
a. Be conducted at least hourly b. Detect a leak of 3.0 gallons/hour c. Restrict or shut-off flow of the product OR trigger a visual and audible
The following piping types are not considered single-walled components for ELD purposes: - correct answer.1. Vent piping
report. A local agency may also require these tests if frequent inconclusive results are reported