Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

BNSF Roadway Worker Protection Training: Multiple Choice Questions and Answers, Exams of Civil Engineering

A series of multiple choice questions and answers related to bnsf roadway worker protection training. It covers essential safety rules and procedures for workers operating near railroad tracks, including the cardinal rule of railroading, fouling the track, on-track safety methods, working limits, personal protective equipment (ppe), and hazard reporting. The document aims to reinforce understanding of safety protocols and best practices for roadway workers.

Typology: Exams

2024/2025

Available from 02/08/2025

tizian-kylan
tizian-kylan 🇺🇸

2.7

(21)

3.8K documents

1 / 3

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
BNSF Roadway Worker Protection with
100% correct answers 2025
(GUARANTEED SUCCESS)
1. Roadway Worker Protection training - answer C. Must be renewed annually.
2. The cardinal rule of railroading is: - answer B. Always expect a train or equipment to
move on any track in either direction at any time.
3. "Fouling" the track means being within __ feet of the field side of the nearest rail. -
answer A. 4
4. According to the FRA, when working in the foul: - answer B. A person or equipment
could be struck by a train or on-track equipment.
5. The following are roadway workers. - answer A. Contractor employees whose duties for
a railroad client may require fouling a track.
6. Roadway workers are responsible to ascertain on track safety is provided: - answer B.
Prior to fouling the track.
7. A roadway worker shall not foul a track except : - answer A. When necessary for the
performance of duty.
8. Roadway workers who perform work in the fouling space must do all of the following
except: - answer C. Must be trained in the General Code of Operating Rules
9. What must an EIC do before any roadway worker fouls a track? - answer C. Conduct an
on-track safety job briefing.
pf3

Partial preview of the text

Download BNSF Roadway Worker Protection Training: Multiple Choice Questions and Answers and more Exams Civil Engineering in PDF only on Docsity!

BNSF Roadway Worker Protection with

100% correct answers 2025

(GUARANTEED SUCCESS)

  1. Roadway Worker Protection training - answer C. Must be renewed annually.
  2. The cardinal rule of railroading is: - answer B. Always expect a train or equipment to move on any track in either direction at any time.
  3. "Fouling" the track means being within __ feet of the field side of the nearest rail. - answer A. 4
  4. According to the FRA, when working in the foul: - answer B. A person or equipment could be struck by a train or on-track equipment.
  5. The following are roadway workers. - answer A. Contractor employees whose duties for a railroad client may require fouling a track.
  6. Roadway workers are responsible to ascertain on track safety is provided: - answer B. Prior to fouling the track.
  7. A roadway worker shall not foul a track except : - answer A. When necessary for the performance of duty.
  8. Roadway workers who perform work in the fouling space must do all of the following except: - answer C. Must be trained in the General Code of Operating Rules
  9. What must an EIC do before any roadway worker fouls a track? - answer C. Conduct an on-track safety job briefing.

10.When is an on-track safety job briefing considered complete? - answer B. When each roadway worker acknowledges understanding of protection provided.

  1. A roadway worker has a "Right to Challenge". When concerned about compliance with on-track safety rules he/she must report his/her concerns to: - answer A. The EIC.
  2. The method of on-track safety used depends on what factors? - answer D. All of the Above
  3. When using train approach warning method of on-track safety, roadway workers must ensure they can clear the track and be in a predetermined place of safety: - answer C. At least 15 seconds prior to train arrival.
  4. A Watchman/Lookout is required for this type of on-track safety. - answer D. Train approach warning
  5. The following statement concerning working limits is NOT true. - answer D. On controlled track, working limits require physically preventing trains or equipment from entering a work site (for example: installing a derail, a discontinuity in the rail, or throwing a switch to isolate disturbed track).
  6. When are working limits required? - answer D. All the above.
  7. Which category of on-track safety methods must be used if a project involves equipment working in the foul? - answer B. Working limits on controlled and non- controlled track.
  8. ___________________ are tracks with track centers spaced less than 25 feet apart. - answer A. Adjacent tracks