BICSI OSP: Questions & Answers for Telecom Professionals, Exams of Telecommunications Engineering

A comprehensive set of questions and answers related to bicsi osp (outside plant) standards and practices. It covers various aspects of osp design, installation, and maintenance, including cable infrastructure, pole design, grounding, and splicing. Valuable for students and professionals seeking to understand the principles and best practices of osp telecommunications.

Typology: Exams

2024/2025

Available from 02/27/2025

tizian-kylan
tizian-kylan ๐Ÿ‡บ๐Ÿ‡ธ

2.7

(21)

3.8K documents

1 / 24

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
1
BICSI OSP Questions & Answer,
100% Correct | Grade A+
If lead to height ratio is between 1/2 and 3/4 and only 2 or 3 spans the head guy should be_____
than suspension strand.
โœ”: One SIze Larger
Important set of deliverables
โœ”: Design documents
OSP cost variance
โœ”: 10%
CSI 27
CSI 28
CSI 31
CSI 33
CSI26
โœ”: Telecommunications
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18

Partial preview of the text

Download BICSI OSP: Questions & Answers for Telecom Professionals and more Exams Telecommunications Engineering in PDF only on Docsity!

BICSI OSP Questions & Answer,

100% Correct | Grade A+

If lead to height ratio is between 1/2 and 3/4 and only 2 or 3 spans the head guy should be_____ than suspension strand. โœ”: One SIze Larger Important set of deliverables โœ”: Design documents OSP cost variance โœ”: 10% CSI 27 CSI 28 CSI 31 CSI 33 CSI โœ”: Telecommunications

electrical safety and security' Earth work Utilities Electrical NAP groupings โœ”: 4,6,8, 4 parts security โœ”: Prevent, Detect,Alarm,Secure 3 components of EMI โœ”: Unbalanced electromagnetic fields of the power system, Coupling between power and telecommunications and susceptibility of the tele system Direct buried cables collects ground strikes with a distance determined by soil resistance typically? โœ”: 6.6' to 19.7' A reading of______ ampres is the best possible reading for any bonding conductor, AC should be less than 1A and DC 500 Miliampres

_______ and ______ are not used after the first 24 binders. โœ”: Violet and slate Load coil designs to counter the effects of capacitance buildup in loop lengths over? โœ”: 5.5 KM Baseband cabling used in lengths up to? โœ”: 328' Uses a solid polymer that insulates each conducting wire ad is color coded and more resistant to electrical surges and more tolerant to handle than PE-39 has 6 to 3000 Pairs โœ”: PE- 89 PE-39 has pair range of? โœ”: 25 to 4200 pair What determines the maximum permissible end to end system attenuation in a given fiber link? โœ”: Average transmitter power and receiver sensitivity By subtracting the passive cable system attenuation from link loss budget what value is received?

โœ”: System performance margin I C E A โœ”: I= Design C= Insulation type E- Conductor gauge A- Sheath design In planning OSP cabling,__ must be determined for? โœ”: Cable infrastructure Class 7 pole breaking strength โœ”: 5335 N (1200Lb) What should be used to keep a pole from leaning sideways when the load on a pole is not large enough to warrant a guy? โœ”: Ground braces

Depending on projections, grow factor is typically what percent? โœ”: 10 to 15% Considering aerial plant design โœ”: Weight of cable, Height of poles, R/W, Make ready requirements and joint use agreements Pole grades are based on? โœ”: Importantance of services they offer, Loading capabilities and pole strength. Moment strength โœ”: Value of movement in newton meters or equivalent in pound force feet is equal to the transverse load in newtons or equivalent in pound force feet multiplied by the distance in meters from the load point to the point considered value of moment. Summing loads โœ”: converts all transverse loads into equivalent loads at a point 2' from the top of the pole. Pole classifications

โœ”: Total number of cables during life span, Total weight of cables, size of support strands, Guy requirements(Corner or dead ends) Transverse load formula โœ”: Load per foot of span length X wind pressure in Kilograms per square meter X diameter of serial line including ice on line Assumed load โœ”: 1500LB in heavy per meter, 3000LB is medium Service drop load per meter is_____ in medium and heavy and_____ in light loading. โœ”: .20 LB and .16LB Bending moments formula โœ”: Total unbalanced force in kilograms of conductor tensions X Height of the wire? Cable attachment above the ground _____ or less doesn't interfere with aircraft authorities โœ”: 200'

โœ”: Plank ground braces When existing pole is ground braced at top and bottom it is economical to install a _______. โœ”: Pole Key Anchor Can be used when carving soil make other methods impractical? โœ”: Water jet hydro vac Can excavate holes up to 20" dia and as deep as 7'. โœ”: Earth boring machine Reinforced pole in longitudinal direction of line. โœ”: Head Guys Reinforced poles in the transverse direction of line. (Right angle to cable run) โœ”: Side Guys Avoid using ____ and ))))) poles as storm guying points. โœ”: Corner or junction

Used to fasten cables at a corner. โœ”: Corner or pull ____ is used when the lead to height ratio is 1-1/4 or less โœ”: Strait eye bolt _____ is used when lead to height ratio is 1-1/4 or greater. โœ”: Thimble eye bolt If lead to height ratio is 3/4 or greater the head guy for the cables can be the_____as suspension strand. โœ”: Same Size If lead to height ratio is between 1/2 and 3/4 and only 2 or 3 spans the head guy should be______ than the suspension strand. โœ”: One Size Larger If pull on a corner pole is 50' or less a guy can be______. โœ”: Placed at a bisecting angle

When conditions allow the guy should equal the height if practical avoid having a LT height ration greater than? โœ”: 1/ Guy rod sizes use __ for 5/8", Use_____ for 3/4" and use______ 1-1/4" โœ”: 12M,18M.32M May be used where guys cannot: Like corner pole where a overhead guy cannot support and terrain that makes guying ineffective. โœ”: Push brace _________ A pole that inclines from a true vertical position, This is done to make sure the top pole will be in line. โœ”: Raked Pole Bolts usally have a ____ dia. โœ”: 5/8" Select support strands based on: โœ”: Cable weights, Storm loading, tensile strength and pole spacing

Based o stringing tension a OSP should plan the pole line not to exceed_____ โœ”: 60% In OSP 6m and 10m are the most used,__ should never be used. โœ”: 2.2M OSP should plan design and insulation for___ or more years of service growth. โœ”: 10 Pole depth formula โœ”: 10% of pole plus 2' For poles containing communications and power vertical risers, the conduits should be terminated on the pole_____ degrees apart but not less than_____ degrees. โœ”: 180, Both end walls only โœ”: A

โœ”: Extending from main conduit may contain feeder or distribution cables Subsidary conduit โœ”: From pedestal to termination point A main conduit should enter the_____of a MH. โœ”: End walls Type B โœ”: Think wall requires concrete encasement Type C โœ”: Thick wall may be direct buried with selected backfill in strait runs. Type D โœ”: Ultraviolet and flame resistant Type E โœ”: Not used in strait line conduit

PE 40

โœ”: Low Stress PE 63 โœ”: Medium stress PE 80 โœ”: High stress The inside diameter of a casing shall be atleast___% larger than the outside diameter of the largest conduit in casing but no less than____ greater than the largest outside diameter of conduit. โœ”: 10, 2" The depth from base of railroad to the top of casing should be no less than______the bottom of the ditch should be no less than___ from top of casing. โœ”: 4.6', 3' High soil compaction is required 85% or greater when a minimum of___ cover cant be maintained. โœ”: 30"

โœ”: Centerline description Describes a tract of land using a series of lines, distances and bearings โœ”: Metes and bounds How many townships in a range โœ”: 16 How is US rectangular grid measured? โœ”: Guide of meridians at 39KM 24 MI intervals What connector is pull and wiggle proof and low loss and also offer a small form factor design? โœ”: LC Minimal system loss โœ”: Subtracting the receivers dynamic range from the system gain Cable suitable for direct buried โœ”: PSAP Polyethylene, aluminum steel, polyethylene

____ is a special use design that may be considered for underground conduit installations where large pair count cable is required and conduit space is limited? โœ”: Duct Pic 2 major features to consider with coaxial cable size and type? โœ”: Attenuation margin and cost What coax is good for moderate climate? โœ”: Bare aluminum Underground life span โœ”: 50 years Direct buried and aerial life span โœ”: 30 years Advantage of using fabric mesh innerduct? โœ”: Conformed to odd-shaped spaces