Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

arbitration and conciliation, Exams of Law

Exhibits index and arbitration and conciliation

Typology: Exams

2019/2020

Uploaded on 08/24/2020

akanksha-rai-1
akanksha-rai-1 🇮🇳

1 document

1 / 9

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
A
INDEX OF EXHIBITS
S.NO. EXHIBITS PAGE NO.
I.
Exhibits C-1
Agreement numbered 117/EE/SOUTH
BUILDING (M)/2016-17
34-36
II.
Exhibits C-2
Tender for works of EOR for Iron net
for open terrace, wall tiles in corridor &
misc. civil work at SKV Mehrauli No. 2,
New Delhi (School ID 1923079).
37-38
III. Exhibits C-3
Bill of Quantities amounting. 39-44
IV.
Exhibits C-4
Letter of Acceptance dated
28.11.2016
45
V.
Exhibits C-5
Performance guarantee vide letter
dated 28.11.2016
46
VI.
Exhibits C-6
Performance guarantee for an amount
of Rs.64,900 (Rupees sixty four
thousand eight hundred fifty seven
only) in the form of a Fixed Deposit
Receipt numbered as 979985, dated
25.11.2016.
47
VII.
Exhibits C-7
A letter dated 02.12.2016 by the
Respondent issued to the Claimant.
48
VIII.
Exhibits C-8
A letter sent by HOS wrote to the
Executive Engineer of the respondent
vide letter dated 16.03.2017.
49
pf3
pf4
pf5
pf8
pf9

Partial preview of the text

Download arbitration and conciliation and more Exams Law in PDF only on Docsity!

A

INDEX OF EXHIBITS

S.NO. EXHIBITS PAGE NO.

I.

Exhibits C- Agreement numbered 117/EE/SOUTH BUILDING (M)/2016-

II.

Exhibits C- Tender for works of EOR for Iron net for open terrace, wall tiles in corridor & misc. civil work at SKV Mehrauli No. 2, New Delhi (School ID 1923079).

III.

Exhibits C- Bill of Quantities amounting.

IV.

Exhibits C- Letter of Acceptance dated 28.11.

V.

Exhibits C- Performance guarantee vide letter dated 28.11.

VI.

Exhibits C- Performance guarantee for an amount of Rs.64,900 (Rupees sixty four thousand eight hundred fifty seven only) in the form of a Fixed Deposit Receipt numbered as 979985, dated 25.11.2016.

VII.

Exhibits C- A letter dated 02.12.2016 by the Respondent issued to the Claimant.

VIII.

Exhibits C- A letter sent by HOS wrote to the Executive Engineer of the respondent vide letter dated 16.03.2017.

B

IX.

Exhibits C- Measurement of First Running bill submitted to respondent authorities

X.

Exhibits C- Abstract of Costs.

XI.

Exhibits C- Claimant’s letter dated 25.03.2017 to E.E.

XII.

Exhibits C- A copy of the page of the original and accepted CMB generated.

XIII.

Exhibits C- A copy of letter dated 31.03.2017 by respondent to the claimant.

XIV.

Exhibits C- A letter dated 07.06.2017 by the claimant to the respondent.

XV.

Exhibits C- A letter dated 10.07.2017 by the claimant to the E.E. of the respondent department.

XVI.

Exhibits C- A letter dated 11.07.2017 by the school to the A.E. of the respondent department.

XVII.

Exhibits C- A letter dated 18.07.2017 by the claimant respondent.

XVIII. Exhibits C- Show cause notice dated 14.08. sent by the Respondent to the Claimant in accordance with Clause 3

D

XXVIII.

Exhibits C- A letter dated 20.09.2017 by the claimant to the respondent.

XXIX.

Exhibits C- Request letter dated 22.09.2017 sent by the Claimant to respondent to provide the measurement report made by J.E. on 30.08.2017.

XXX.

Exhibits C- RTI filed by the Claimant dated 25.09.2017.

XXXI.

Exhibits C- A letter dated 26.09.2017 by the claimant to the E.E.

XXXII.

Exhibits C- A demand letter dated 29.09. containing all claims in brief sent to EE and emailed on 03.10.

XXXIII.

Exhibits C- An email dated 03..10.2017 of the letter dated 29.09.2017 sent to EE.

XXXIV.

Exhibits C- A letter dated 07.10.2017 by the Claimant to the E.E. denying the letter dated 19.09.2017 of the respondent.

XXXV.

Exhibits C- A letter dated 12.10.2017 by the respondent to the claimant.

XXXVI.

Exhibits C- A letter dated 23.10.2017 by the claimant to the respondent.

XXXVII. Exhibits C-37 126

E

A letter dated 01.11.2017 by the Claimant to the Respondent for providing the bill for works done XXXVIII. Exhibits C- A letter dated 13.11.2017 by claimant to the department denying the measurements.

XXXIX.

Exhibits C- A letter dated 14.11.2017 by the claimant to the respondent requesting to release the payments.

XL.

Exhibits C- A letter dated 20.11.2017 by the claimant to the Superintendent Engineer, South regarding seeking information on the CMB 318

XLI.

Exhibits C- A letter by the Superintendent Engineer dated 30.11.2017 to the claimant

XLII.

Exhibits C- A hearing dated 08.12.2017 was held on the claimant’s appeal.

XLIII.

Exhibits C- A letter dated 14.12.2017 was sent by the claimant to the Central Information Commissioner

XLIV.

Exhibits C- A letter dated 21.12.2017 by the S.E. South to the Deputy Registrar, CPIO.

XLV. Exhibits C- A letter dated 21.12.2017 was sent by

G

A legal notice dated 09.04.2018 to the Chief Engineer sent by the Claimant. LV. Exhibits C- A letter dated 17.05.2018 sent to the Claimant in reply to the letter dated 29.01.2018.

LVI.

Exhibits C- A request letter dated 20.06.2018 by the claimant to the Chief Engineer.

LVII.

Exhibits C- A letter dated 26.06.2018 by the Chief Engineer to the Claimant

LVIII.

Exhibits C- A letter dated 11.07.2018 by the claimant to the Chief Engineer for appointment of Arbitrator.

LIX.

Exhibits C- A letter dated 18.07.2018 of the Chief Engineer (South) to the claimant.

LX.

Exhibits C- A letter dated 02.08.2018 by the claimant to the Chief Engineer

LXI.

Exhibits C- A letter dated 26.09.2018 by the claimant to the Chief Engineer.

LXII.

Exhibits C- A letter dated 27.11.2018 by the claimant to the Executive Engineer for seeking agreement copy.

LXIII.

Exhibits C- A letter dated 06.12.2018 by the claimant to the Chief Engineer.

H

LXIV.

Exhibits C- A request letter dated 31.12.2018 by the Claimant to the Chief Engineer for appointment of Arbitrator.

LXV.

Exhibits C- A request letter dated 23.01.2019 by the Claimant to the Chief Engineer for appointment of Arbitrator.

LXVI.

Exhibits C- A request letter dated 25.02.2019 by the Claimant to the Chief Engineer for appointment of Arbitrator.

LXVII.

Exhibits C- A letter dated 08.03.2019 sent to the Chief Engineer (East) by the Chief Engineer South (M0 for requesting for constituting the DRC.

LXVIII.

Exhibits C- A request letter dated 13.05.2019 by the Claimant to the Chief Engineer for appointment of Arbitrator.

LXIX.

Exhibits C- A request letter dated 17.06.2019 by the Claimant to the Chief Engineer for appointment of Arbitrator.

LXX.

Exhibits C- A request letter dated 02.08.2019 by the Claimant to the Chief Engineer for appointment of Arbitrator.

LXXI. Exhibits C- A reply of the RTI application received