ALLIANCE ACADEMY FOR INNOVATION PARKING DECK. FORSYTH COUNTY BOARD OF EDUCATION. MSSA PN 201809. Addendum No. 2 - Page 1 of 1.

Typology: Study Guides, Projects, Research

2021/2022

Uploaded on 09/27/2022

ekayavan
ekayavan 🇺🇸

4.6

(39)

258 documents

1 / 3

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
ALLIANCE ACADEMY FOR INNOVATION PARKING DECK
FORSYTH COUNTY BOARD OF EDUCATION
MSSA PN 201809
Addendum No. 2 - Page 1 of 1
MANLEY SPANGLER SMITH ARCHITECTS, PC., P.O. BOX 880, GRIFFIN, GA 30223
ADDENDUM NUMBER TWO: DATED: August 22, 2018
To: All prime contract bidders of record.
This addendum forms a part of the Contract Documents and modifies the original
Specifications and Drawings dated July 24, 2018, as noted below. Acknowledge receipt
of this Addendum in the space provided on the Bid Form; failure to do so may
subject bidder to disqualification.
BID DATE: September 6, 2018
GENERAL INFORMATION
1. The Pre-Bid Conference Attendance Roster is included in this Addendum.
SPECIFICATIONS
1. Section 00100 – Instructions to Bidders:
A. Page 00100-11: Reference the AIA A305 Contractor’s Qualification Statement.
If this document has not been provided already, the deadline is Friday, August 24,
2018, 5:00 PM.
2. Section 034100 – Precast Structural Concrete:
A. Page 034100-8, Item 2.6, E. Coloring Admixture: Delete item E. in its entirety.
B. Page 034100-11, Item 2.11, A.,1.: Add the following as an approved equal:
“Meridian, 424 New Ashbury”
3. Section 107326 – Walkway Coverings:
A. Page 107326-2, After Line 3: Add the following acceptable manufacturer:
“Tennessee Valley Metals, Inc.”
DRAWINGS
1. Sheet E1.0:
A. Change Keynote#6 to the following:
The existing pole mounted light fixtures, poles, hardware, etc., shall be removed
by this contractor and delivered to 136 Almon C Hill Drive, Cumming, Georgia
30040. Coordinate with the Owner the date and time of all deliveries. Remove
the existing circuit from these poles back to the distribution panel in the main
school building. Turn the breaker to the “Off” position and label as spare.
pf3

Partial preview of the text

Download alliance academy for innovation parking deck and more Study Guides, Projects, Research Innovation in PDF only on Docsity!

ALLIANCE ACADEMY FOR INNOVATION PARKING DECK

FORSYTH COUNTY BOARD OF EDUCATION

MSSA PN 201809

Addendum No. 2 - Page 1 of 1

MANLEY SPANGLER SMITH ARCHITECTS, PC., P.O. BOX 880, GRIFFIN, GA 30223

ADDENDUM NUMBER TWO: DATED: August 22, 20 18 To: All prime contract bidders of record. This addendum forms a part of the Contract Documents and modifies the original Specifications and Drawings dated July 24, 20 18 , as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form; failure to do so may subject bidder to disqualification. BID DATE: September 6, 2018 GENERAL INFORMATION

  1. The Pre-Bid Conference Attendance Roster is included in this Addendum. SPECIFICATIONS
  2. Section 00100 – Instructions to Bidders: A. Page 00100-11: Reference the AIA A305 Contractor’s Qualification Statement. If this document has not been provided already, the deadline is Friday, August 24, 2018, 5:00 PM.
  3. Section 034100 – Precast Structural Concrete: A. Page 0341 00 - 8, Item 2.6, E. Coloring Admixture: Delete item E. in its entirety. B. Page 034100-11, Item 2.11, A.,1.: Add the following as an approved equal: “Meridian, 424 New Ashbury”
  4. Section 107326 – Walkway Coverings: A. Page 107326-2, After Line 3: Add the following acceptable manufacturer: “Tennessee Valley Metals, Inc.” DRAWINGS
  5. Sheet E1. 0 : A. Change Keynote#6 to the following: The existing pole mounted light fixtures, poles, hardware, etc., shall be removed by this contractor and delivered to 136 Almon C Hill Drive, Cumming, Georgia 30040. Coordinate with the Owner the date and time of all deliveries. Remove the existing circuit from these poles back to the distribution panel in the main school building. Turn the breaker to the “Off” position and label as spare.