Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Akuntansi partial plan, Exercises of Cost Accounting

Latihan soal menhitung harga pokok standar partial plan

Typology: Exercises

2017/2018

Uploaded on 04/22/2018

jasmine-aulia
jasmine-aulia ๐Ÿ‡ฎ๐Ÿ‡ฉ

1 document

1 / 29

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
SISTEM HARGA POKOK STANDAR
METODE GANDA (PARTIAL PLAN)
Nama Kelompok :
1. Risa Choirunnisa (7211413096)
2. Putri Nur Rahmawati
(7211413097)
3. Rozi Nurchaqiqi (7211413098)
4. Noor Chasanah (7211413099)
5. Charina Martha (7211413100)
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d

Partial preview of the text

Download Akuntansi partial plan and more Exercises Cost Accounting in PDF only on Docsity!

SISTEM HARGA POKOK STANDAR

METODE GANDA (PARTIAL PLAN)

Nama Kelompok :

1. Risa Choirunnisa (7211413096)

2. Putri Nur Rahmawati

3. Rozi Nurchaqiqi (7211413098)

4. Noor Chasanah (7211413099)

5. Charina Martha (7211413100)

Karakteristik ๏‚› (^) Rekening Barang dalam Proses didebit dengan biaya sesungguhnya dan dikredit dengan biaya standar. ๏‚› (^) Selisih biaya sesungguhnya dari biaya standar dihitung pada akhir periode akuntansi, setelah harga pokok persediaan produk dalam proses ditentukan dan harga pokok produk yang ditransfer ke gudang dicatat dalam Rekening Barang dalam Proses. ๏‚› (^) Selisih biaya sesungguhnya dari biaya standar merupakan jumlah total perbedaan antara biaya standar dengan biaya sesungguhnya.

Contoh Lanjutan... Transaksi yang terjadi dalam bulan Maret 2014 adalah sebagai berikut:

  1. Jumlah bahan baku yang dibeli adalah 1.500 kg @ Rp 2. 2.Jumlah produk yang diproduksi dan selesai diproses dalam bulan Maret 2014 adalah 500 satuan dengan biaya produksi sesungguhnya sebagai berikut: a. Biaya bahan baku 1.500 kg @ Rp 2.400 = Rp 3.600. b. Biaya tenaga kerja 3.000 jam @ Rp 800 = Rp 2.400. c. Biaya overhead pabrik = Rp 6.000. Atas dasar data dalam contoh tersebut di atas berikut ini disajikan analisis selisih biaya produksi langsung dan biaya overhead pabrik.

Harga Standar (Hst) =Rp 2. Harga Sesungguhnya (HS)=Rp 2. Kuantitas Standar (KSt) = 2. (500x4kg) Kuantitas Sesungguhnya(KS) = 1500 Jam Kerja Standar (JKSt) = 2. (500x5jam) Jam Kerja Sesungguhnya(JKS)=3. Tarif Upah Standar (TUSt) = 1. Tarif Upah Sesungguhnya (TUS) = 800 Keterangan..

3. Metode Tiga Selisih Selisih harga biaya bahan baku (HSt โ€“ HS) x KS (Rp 2.000 โ€“ Rp 2.400) x 1.500 = Rp 600.000 R Selisih kuantitatif biaya bahan baku (KSt โ€“ KS) x HSt (2.000 โ€“ 1.500) x Rp 2.000 = Rp 1.000.000 L Selisih kuantitas/harga biaya bahan baku = 0 Total selisih biaya bahan baku Rp 400.000 L Biaya Bahan Baku

BUKU BESAR BAHAN BAKU

BUKU BESAR BAHAN BAKU

1. Model Satu Selisih Selisih biaya tenaga kerja (TUSt x JKSt) โ€“ (TUS x JKS) (Rp 1000 x (5 x 500))- (Rp 800 x 3000) = Rp 100.000 L Biaya Tenaga Kerja

2. Model Dua Selisih Selisih tariff upah (TUSt โ€“ TUS) x JKS (Rp 1000 โ€“ Rp 800) x 3000 = Rp 600.000 L Selisih efiensi upah (JKSt โ€“ JKS) x TUSt ((5 x 500) โ€“ 3000) x Rp 1000 = Rp 500.000 R Total Selisih Biaya Tenaga Kerja Langsung = Rp 100.000 L Biaya Tenaga Kerja

Buku Besar BTK

1. Model satu selisih Selisih total biaya overhead pabrik : Biaya overhead pabrik sesungguhnya Rp 6.000. Biaya overhead pabrik yang dibebankan: 500 x5 jam x Rp 1.800(Rp 1000 + Rp 800) Rp 4.500. Selisih total biaya overhead pabrik Rp 1.500.000 R Biaya Overhead Pabrik

2. Model dua selisih a. Selisih Terkendali BOP Sesungguhnya Rp 6.000. BOP tetap pada kapasitas normal 3600 x Rp 800 Rp 2.880. BOP Variabe sesungguhnya Rp 3.120. BOP Variabe pada jam standart 2.500(JKSt) x Rp 1.000 Rp 2.500. Selisih Terkendali Rp 620.000 R Biaya Overhead Pabrik

Buku Besar BOP

3. Model Tiga Selisih a. Selisih pengeluaran BOP Sesungguhnya Rp 6.000. BOP tetap pada kapasitas normal 3.600 x Rp 800 Rp 2.880. BOP Variabel sesungguhnya Rp 3.120. BOP Variabel yg dianggarkan, pada jam kerja sesungguhnya dicapai : 3.000x Rp 1.000 Rp 3.000. Selisih pengeluaran Rp 120.000 R Biaya Overhead Pabrik