Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
A project summary report of the Pinellas County Capital Improvement Program for the years FY2011 to FY2016. The report includes details on various projects such as bridge rehabilitation, intersection improvements, and traffic safety studies. The data presented includes costs and resources allocated for each project, as well as project descriptions.
Typology: Lecture notes
1 / 28
This page cannot be seen from the preview
Don't miss anything!
Function
Transportation Activity
Road
Street Facilities Category
Arterial Roads Project No:
Title: 118th Avenue Expressway Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center: Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Other
RESOURCES:^ Penny for Pinellas
Description: Funding commitment to
for project design and construction. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:
Title: 62nd Av
49th St
to 34th St
Cost Center:
Department: Public Works Primary Fund:
Yes Sub-cost Center:
Organization:
Secondary Fund:
Element: Transportation
Traffic Circu FY
COSTS:^ Professional Svcs
RESOURCES:^ Penny for Pinellas
Description: Design for the reconstruction and widening of 62nd Avenue
from a 2-lane roadway to a 4-lane divided roadway with curb, gutter and sidewalk. (Project length of
miles) ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————
Project No:
Title: Belcher Rd
38th Av
to 54th Av
Cost Center:
Department: Public Works Primary Fund:
Yes Sub-cost Center:
Organization:
Secondary Fund:
Element: Transportation
Traffic Circu FY
COSTS:^ Professional Svcs
RESOURCES:^ Penny for Pinellas
Description: Design for the reconstruction of Belcher Road from a 2-lane roadway to a 2-lane divided roadway with curb, gutter and sidewalk. (Project length of
miles) ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:
Title: Bryan Dairy Rd
Starkey Rd to 72nd St Cost Center:
Department: Public Works Primary Fund:
Yes Sub-cost Center:
Organization:
Secondary Fund:
Element: Transportation
Traffic Circu FY
COSTS:^ Professional Svcs
Acquisitions
Construction
Testing
RESOURCES:^ Penny for Pinellas
Trans Impact Fees
Grant-Federal
Grant-State
Description: Reconstruction and widening of Bryan Dairy Road from a 4-lane divided to a 6-lane divided urban arterial roadway. Project includes improvements to Belcher Road from south of Bryan Dairy Road to north of 114th Avenue. (Project length of
miles along Bryan Dairy Road and
mile along Belcher Road) ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————
Project No:
Title: Starkey Rd- Bryan Dairy Rd to Ulmerton Rd Cost Center:
Department: Public Works Primary Fund:
Yes Sub-cost Center:
Organization:
Secondary Fund:
Element: Transportation
Traffic Circu FY
COSTS:^ Professional Svcs
RESOURCES:^ Penny for Pinellas
Description: Design for the widening of Starkey Road from a 4-lane divided to a 6-lane divided arterial roadway. (Project length of
miles) ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— TOTALS
Arterial Roads FY
COSTS:^ Professional Svcs
Acquisitions
Construction
Testing
Other
RESOURCES: Penny for Pinellas
Trans Impact Fees
Grant-Federal
Grant-State
Category
Bridges, Repairs
Improve. Project No:
Title: Beckett Bridge Project Development
Environm Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center:
Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Professional Svcs
RESOURCES:^ Penny for Pinellas
Grant-Federal
Description: Prepare a Project Development
Environment Study to determine the type of improvements or replacement necessary for the Beckett Bridge. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:
Title: Beckett Bridge Repairs Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center:
Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Professional Svcs
Construction
Testing
RESOURCES:^ Penny for Pinellas
Description: Structural and mechanical repairs to Beckett Bridge. ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————
Project No:
Title: Park Street Bridge Replacement Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center:
Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Professional Svcs
Construction
Testing
RESOURCES:^ Grant-State
Description: Replacement of an existing bridge on Park Street over creek No.
between 5th Avenue North and 9th Avenue North. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— TOTALS
Bridges, Repairs
Improve. FY
COSTS:^ Professional Svcs
Construction
Testing
RESOURCES: Penny for Pinellas
Grant-Federal
Grant-State
Category
Intersection Improvements Project No:
Title: 54th Avenue North at 28th Street North Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center:
Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Construction
RESOURCES:^ Penny for Pinellas
Trans Impact Fees
Description: Reconstruction of intersection to include left turn lanes on 54th Ave
and 28th St
Grant funding through FDOT's Safety Program. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:
Title:
Countywide System Program Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center:
Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Professional Svcs
Construction
RESOURCES:^ Local Option Gas Tax
Description: Project to design and construct the Countywide Advanced Traffic Management System (ATMS)/Intelligent Transportation System
utilizing the 9th Cent Fuel Tax. ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————
Project No:
Title: Bryan Dairy
Starkey Intersection Improvements Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center:
Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Professional Svcs
Construction
Testing
RESOURCES:^ Penny for Pinellas
Description: Intersection improvements at Bryan Dairy Road and Starkey Road ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:
Title: Intersection Improvements Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center:
Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Professional Svcs
Construction
RESOURCES:^ Penny for Pinellas
Grant-State
Description: Funding allocation for Countywide intersection safety and capacity modifications and mast arm signalization projects. This program supplies funding for individual intersection improvement projects. Grant funding provided for the construction of median modifications along Park Blvd from Starkey Rd to Belcher Rd. ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————
Project No:
Title: McMullen Booth Rd
Drew St Cost Center:
Department: Public Works Primary Fund:
Yes Sub-cost Center:
Organization:
Secondary Fund:
Element: Transportation
Traffic Circu FY
COSTS:^ Professional Svcs
Construction
Testing
RESOURCES:^ Trans Impact Fees
Grant-State-CIGP
Description: Construction of southbound right turn lane and extension of northbound and southbound left turn lanes on McMullen Booth Rd to improve intersection efficiency and safety. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:
Title: McMullen Booth Road
Enterprise Road Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center:
Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Professional Svcs
Construction
Testing
Other
RESOURCES:^ Trans Impact Fees
Grant-State-CIGP
Description: Left and right turn lane improvements on McMullen Booth Road and Enterprise Road to improve intersection efficiency and safety. ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————
Project No:
Title:
Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center:
Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Professional Svcs
Construction
Other
RESOURCES:^ Local Option Gas Tax
Grant-State
Description: Design and construct a new
system on
and
utilizing funds from 9th Cent Fuel Tax and Transportation Regional Incentive Program. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:
Title:
Project-Stage
Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center:
Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Professional Svcs
Construction
Other
RESOURCES:^ Local Option Gas Tax
Grant-Federal
Description: Installation of
system on
funding provided through Federal appropriations. ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————
Project No:
Title:
686-East Bay Drive
Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center:
Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Professional Svcs
Construction
Other
RESOURCES:^ Local Option Gas Tax
Grant-State
Description: Design and installation of
on
utilizing funds from 9th Cent Fuel Tax and County Incentive Grant Program. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:
Title: Signal System Consultant Services Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center:
Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Professional Svcs
RESOURCES:^ Penny for Pinellas
Description: Consultant services for routine evaluation and development of timing plans for the computerized signal system. ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————
Category
Local Streets/Collector Improv Project No:
Title: 46th Av
80th St
to 62nd St
Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center:
Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Professional Svcs
Construction
RESOURCES:^ Penny for Pinellas
Description: Reconstruction of 46th Avenue
to a 2-lane urban roadway. Project includes drainage improvements along 62nd Street
from Joe's Creek to 46th Avenue
(Project length of
miles) ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:
Title: Dansville Phase
Cost Center:
Department: Community Development Primary Fund:
No Sub-cost Center:
Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Professional Svcs
Construction
RESOURCES:^ Penny for Pinellas
Grant-Federal-CDBG
Other
Description: Funding for Phase
a neighborhood area street and other infrastructure improvements project. Project includes Local Penny for Pinellas funding and Community Development Block Grant
funding. ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————
Project No:
Title: Haines Rd
to
Cost Center:
Department: Public Works Primary Fund:
Yes Sub-cost Center:
Organization:
Secondary Fund:
Element: Transportation
Traffic Circu FY
COSTS:^ Acquisitions
RESOURCES:^ Penny for Pinellas
Description: Right of way acquisition for the reconstruction of Haines Road to a 2-lane urban roadway with sidewalk and drainage improvements. (Project length of
miles) ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:
Title: Highland Avenue Improvements Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center:
Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Other
RESOURCES:^ Trans Impact Fees
Description: Funding contribution to the City of Largo for road, drainage and sidewalk improvements along Highland Avenue. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— TOTALS
Local Streets/Collector Improv FY
COSTS:^ Professional Svcs
Acquisitions
Construction
Other
RESOURCES: Penny for Pinellas
Trans Impact Fees
Grant-Federal-CDBG
Other
Pinellas Trail FY
COSTS:^ Professional Svcs
Construction
Testing
Other
RESOURCES: Penny for Pinellas
Trans Impact Fees
Category
Road
Street Support Projects Project No:
Title: Contingency Roadway and Right-of-Way Requirem Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center:
Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Construction
RESOURCES:^ Penny for Pinellas
Description: Reserve to meet court judgements on condemnation/eminent domain cases, hazardous material evaluations and services, and other unanticipated right of way needs, or other general contingency road repair needs. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:
Title: Gulf Bv Improvements Cost Center:
Department: Public Works Primary Fund:
No Sub-cost Center: Organization:
Secondary Fund:
Element: Not Applicable FY
COSTS:^ Other
RESOURCES:^ Penny for Pinellas
Description: Professional services for enhancement of Gulf Boulevard from State Road
on Clearwater Beach, south to Pass-A- Grille Beach. Improvements include relocation of aerial utility lines underground, construction of pedestrian cross walks, installation of decorative street lighting, common signage and landscaping. ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————