Pinellas County CIP: Bridge Rehab, Intersection Improvements, Traffic Safety Studies (FY11, Lecture notes of Construction

A project summary report of the Pinellas County Capital Improvement Program for the years FY2011 to FY2016. The report includes details on various projects such as bridge rehabilitation, intersection improvements, and traffic safety studies. The data presented includes costs and resources allocated for each project, as well as project descriptions.

Typology: Lecture notes

2021/2022

Uploaded on 09/27/2022

houhou
houhou 🇺🇸

4

(7)

269 documents

1 / 28

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Pinellas County Capital Improvement Program, FY2011 - FY2016
Project Summary Report
81
Function : Transportation
Activity : Road & Street Facilities
Category : Arterial Roads
Project No: 1618 Title: 118th Avenue Expressway
Cost Center: 8414018 Department: Public Works Primary Fund: 0401 CIE: No
Sub-cost Center: Organization: CO ADMIN Secondary Fund: CIE Element: Not Applicable
FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 TOTAL
COSTS:
Other 0 0 0 20,000,000 20,000,000 0 40,000,000
————————————— ————————————— ————————————— ———————————— ———————————— ————————————— ————————————
TOTAL COSTS: 0 0 0 20,000,000 20,000,000 0 40,000,000
RESOURCES:
Penny for Pinellas 0 0 0 20,000,000 20,000,000 0 40,000,000
————————————— ————————————— ————————————— ———————————— ———————————— ————————————— ————————————
TOTAL RESOURCES: 0 0 0 20,000,000 20,000,000 0 40,000,000
Description: Funding commitment to FDOT for project design and construction.
————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————
Project No: 922276 Title: 62nd Av N - 49th St N to 34th St N
Cost Center: 8414522 Department: Public Works Primary Fund: 0401 CIE: Yes
Sub-cost Center: 8414522 Organization: CO ADMIN Secondary Fund: CIE Element: Transportation - Traffic Circu
FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 TOTAL
COSTS:
Professional Svcs 253,400 0 0 0 0 0 253,400
————————————— ————————————— ————————————— ———————————— ———————————— ————————————— ————————————
TOTAL COSTS: 253,400 0 0 0 0 0 253,400
RESOURCES:
Penny for Pinellas 253,400 0 0 0 0 0 253,400
————————————— ————————————— ————————————— ———————————— ———————————— ————————————— ————————————
TOTAL RESOURCES: 253,400 0 0 0 0 0 253,400
Description: Design for the reconstruction and widening of 62nd Avenue N from a 2-lane roadway to a 4-lane divided roadway with
curb, gutter and sidewalk. (Project length of 1.17 miles)
————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c

Partial preview of the text

Download Pinellas County CIP: Bridge Rehab, Intersection Improvements, Traffic Safety Studies (FY11 and more Lecture notes Construction in PDF only on Docsity!

Pinellas County Capital Improvement Program, FY2011 - FY

Project Summary Report

Function

Transportation Activity

Road

Street Facilities Category

Arterial Roads Project No:

Title: 118th Avenue Expressway Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center: Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Other

TOTAL

COSTS:

RESOURCES:^ Penny for Pinellas

TOTAL

RESOURCES:

Description: Funding commitment to

FDOT

for project design and construction. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:

Title: 62nd Av

N

49th St

N

to 34th St

N

Cost Center:

Department: Public Works Primary Fund:

CIE:

Yes Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Transportation

Traffic Circu FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

TOTAL

COSTS:

RESOURCES:^ Penny for Pinellas

TOTAL

RESOURCES:

Description: Design for the reconstruction and widening of 62nd Avenue

N

from a 2-lane roadway to a 4-lane divided roadway with curb, gutter and sidewalk. (Project length of

miles) ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————

Pinellas County Capital Improvement Program, FY2011 - FY

Project Summary Report

Project No:

Title: Belcher Rd

38th Av

N

to 54th Av

N

Cost Center:

Department: Public Works Primary Fund:

CIE:

Yes Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Transportation

Traffic Circu FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

TOTAL

COSTS:

RESOURCES:^ Penny for Pinellas

TOTAL

RESOURCES:

Description: Design for the reconstruction of Belcher Road from a 2-lane roadway to a 2-lane divided roadway with curb, gutter and sidewalk. (Project length of

miles) ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:

Title: Bryan Dairy Rd

Starkey Rd to 72nd St Cost Center:

Department: Public Works Primary Fund:

CIE:

Yes Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Transportation

Traffic Circu FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Acquisitions

Construction

Testing

TOTAL

COSTS:

RESOURCES:^ Penny for Pinellas

Trans Impact Fees

Grant-Federal

Grant-State

TOTAL

RESOURCES:

Description: Reconstruction and widening of Bryan Dairy Road from a 4-lane divided to a 6-lane divided urban arterial roadway. Project includes improvements to Belcher Road from south of Bryan Dairy Road to north of 114th Avenue. (Project length of

miles along Bryan Dairy Road and

mile along Belcher Road) ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————

Pinellas County Capital Improvement Program, FY2011 - FY

Project Summary Report

Project No:

Title: Starkey Rd- Bryan Dairy Rd to Ulmerton Rd Cost Center:

Department: Public Works Primary Fund:

CIE:

Yes Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Transportation

Traffic Circu FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

TOTAL

COSTS:

RESOURCES:^ Penny for Pinellas

TOTAL

RESOURCES:

Description: Design for the widening of Starkey Road from a 4-lane divided to a 6-lane divided arterial roadway. (Project length of

miles) ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— TOTALS

FOR

CATEGORY:

Arterial Roads FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Acquisitions

Construction

Testing

Other

TOTAL

COSTS:

RESOURCES: Penny for Pinellas

Trans Impact Fees

Grant-Federal

Grant-State

TOTAL

RESOURCES:

Pinellas County Capital Improvement Program, FY2011 - FY

Project Summary Report

Category

Bridges, Repairs

Improve. Project No:

Title: Beckett Bridge Project Development

Environm Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

TOTAL

COSTS:

RESOURCES:^ Penny for Pinellas

Grant-Federal

TOTAL

RESOURCES:

Description: Prepare a Project Development

Environment Study to determine the type of improvements or replacement necessary for the Beckett Bridge. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:

Title: Beckett Bridge Repairs Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Construction

Testing

TOTAL

COSTS:

RESOURCES:^ Penny for Pinellas

TOTAL

RESOURCES:

Description: Structural and mechanical repairs to Beckett Bridge. ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————

Pinellas County Capital Improvement Program, FY2011 - FY

Project Summary Report

Project No:

Title: Park Street Bridge Replacement Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Construction

Testing

TOTAL

COSTS:

RESOURCES:^ Grant-State

TOTAL

RESOURCES:

Description: Replacement of an existing bridge on Park Street over creek No.

between 5th Avenue North and 9th Avenue North. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— TOTALS

FOR

CATEGORY:

Bridges, Repairs

Improve. FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Construction

Testing

TOTAL

COSTS:

RESOURCES: Penny for Pinellas

Grant-Federal

Grant-State

TOTAL

RESOURCES:

Pinellas County Capital Improvement Program, FY2011 - FY

Project Summary Report

Category

Intersection Improvements Project No:

Title: 54th Avenue North at 28th Street North Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Construction

TOTAL

COSTS:

RESOURCES:^ Penny for Pinellas

Trans Impact Fees

TOTAL

RESOURCES:

Description: Reconstruction of intersection to include left turn lanes on 54th Ave

N

and 28th St

N.

Grant funding through FDOT's Safety Program. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:

Title:

ATMS/ITS

Countywide System Program Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Construction

TOTAL

COSTS:

RESOURCES:^ Local Option Gas Tax

TOTAL

RESOURCES:

Description: Project to design and construct the Countywide Advanced Traffic Management System (ATMS)/Intelligent Transportation System

(ITS)

utilizing the 9th Cent Fuel Tax. ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————

Pinellas County Capital Improvement Program, FY2011 - FY

Project Summary Report

Project No:

Title: Bryan Dairy

Starkey Intersection Improvements Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Construction

Testing

TOTAL

COSTS:

RESOURCES:^ Penny for Pinellas

TOTAL

RESOURCES:

Description: Intersection improvements at Bryan Dairy Road and Starkey Road ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:

Title: Intersection Improvements Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Construction

TOTAL

COSTS:

RESOURCES:^ Penny for Pinellas

Grant-State

TOTAL

RESOURCES:

Description: Funding allocation for Countywide intersection safety and capacity modifications and mast arm signalization projects. This program supplies funding for individual intersection improvement projects. Grant funding provided for the construction of median modifications along Park Blvd from Starkey Rd to Belcher Rd. ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————

Pinellas County Capital Improvement Program, FY2011 - FY

Project Summary Report

Project No:

Title: McMullen Booth Rd

Drew St Cost Center:

Department: Public Works Primary Fund:

CIE:

Yes Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Transportation

Traffic Circu FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Construction

Testing

TOTAL

COSTS:

RESOURCES:^ Trans Impact Fees

Grant-State-CIGP

TOTAL

RESOURCES:

Description: Construction of southbound right turn lane and extension of northbound and southbound left turn lanes on McMullen Booth Rd to improve intersection efficiency and safety. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:

Title: McMullen Booth Road

Enterprise Road Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Construction

Testing

Other

TOTAL

COSTS:

RESOURCES:^ Trans Impact Fees

Grant-State-CIGP

TOTAL

RESOURCES:

Description: Left and right turn lane improvements on McMullen Booth Road and Enterprise Road to improve intersection efficiency and safety. ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————

Pinellas County Capital Improvement Program, FY2011 - FY

Project Summary Report

Project No:

Title:

SR

ATMS

Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Construction

Other

TOTAL

COSTS:

RESOURCES:^ Local Option Gas Tax

Grant-State

TOTAL

RESOURCES:

Description: Design and construct a new

ATMS/ITS

system on

SR

580/SR

and

SR

utilizing funds from 9th Cent Fuel Tax and Transportation Regional Incentive Program. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:

Title:

SR

ATMS/ITS

Project-Stage

Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Construction

Other

TOTAL

COSTS:

RESOURCES:^ Local Option Gas Tax

Grant-Federal

TOTAL

RESOURCES:

Description: Installation of

ATMS/ITS

system on

SR

funding provided through Federal appropriations. ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————

Pinellas County Capital Improvement Program, FY2011 - FY

Project Summary Report

Project No:

Title:

SR

686-East Bay Drive

ATMS/ITS

Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Construction

Other

TOTAL

COSTS:

RESOURCES:^ Local Option Gas Tax

Grant-State

TOTAL

RESOURCES:

Description: Design and installation of

ATMS/ITS

on

SR

utilizing funds from 9th Cent Fuel Tax and County Incentive Grant Program. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:

Title: Signal System Consultant Services Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

TOTAL

COSTS:

RESOURCES:^ Penny for Pinellas

TOTAL

RESOURCES:

Description: Consultant services for routine evaluation and development of timing plans for the computerized signal system. ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————

Pinellas County Capital Improvement Program, FY2011 - FY

Project Summary Report

Category

Local Streets/Collector Improv Project No:

Title: 46th Av

N

80th St

N

to 62nd St

N

Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Construction

TOTAL

COSTS:

RESOURCES:^ Penny for Pinellas

TOTAL

RESOURCES:

Description: Reconstruction of 46th Avenue

N

to a 2-lane urban roadway. Project includes drainage improvements along 62nd Street

N

from Joe's Creek to 46th Avenue

N.

(Project length of

miles) ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:

Title: Dansville Phase

III

Cost Center:

Department: Community Development Primary Fund:

CIE:

No Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Construction

TOTAL

COSTS:

RESOURCES:^ Penny for Pinellas

Grant-Federal-CDBG

Other

TOTAL

RESOURCES:

Description: Funding for Phase

III,

a neighborhood area street and other infrastructure improvements project. Project includes Local Penny for Pinellas funding and Community Development Block Grant

(CDBG)

funding. ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————

Pinellas County Capital Improvement Program, FY2011 - FY

Project Summary Report

Project No:

Title: Haines Rd

US

to

I-

Cost Center:

Department: Public Works Primary Fund:

CIE:

Yes Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Transportation

Traffic Circu FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Acquisitions

TOTAL

COSTS:

RESOURCES:^ Penny for Pinellas

TOTAL

RESOURCES:

Description: Right of way acquisition for the reconstruction of Haines Road to a 2-lane urban roadway with sidewalk and drainage improvements. (Project length of

miles) ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:

Title: Highland Avenue Improvements Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Other

TOTAL

COSTS:

RESOURCES:^ Trans Impact Fees

TOTAL

RESOURCES:

Description: Funding contribution to the City of Largo for road, drainage and sidewalk improvements along Highland Avenue. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— TOTALS

FOR

CATEGORY:

Local Streets/Collector Improv FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Acquisitions

Construction

Other

TOTAL

COSTS:

RESOURCES: Penny for Pinellas

Trans Impact Fees

Grant-Federal-CDBG

Other

TOTAL

RESOURCES:

Pinellas County Capital Improvement Program, FY2011 - FY

Project Summary Report

TOTALS

FOR

CATEGORY:

Pinellas Trail FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Professional Svcs

Construction

Testing

Other

TOTAL

COSTS:

RESOURCES: Penny for Pinellas

Trans Impact Fees

TOTAL

RESOURCES:

Pinellas County Capital Improvement Program, FY2011 - FY

Project Summary Report

Category

Road

Street Support Projects Project No:

Title: Contingency Roadway and Right-of-Way Requirem Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center:

Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Construction

TOTAL

COSTS:

RESOURCES:^ Penny for Pinellas

TOTAL

RESOURCES:

Description: Reserve to meet court judgements on condemnation/eminent domain cases, hazardous material evaluations and services, and other unanticipated right of way needs, or other general contingency road repair needs. ———————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— Project No:

Title: Gulf Bv Improvements Cost Center:

Department: Public Works Primary Fund:

CIE:

No Sub-cost Center: Organization:

CO

ADMIN

Secondary Fund:

CIE

Element: Not Applicable FY

FY

FY

FY

FY

FY

TOTAL

COSTS:^ Other

TOTAL

COSTS:

RESOURCES:^ Penny for Pinellas

TOTAL

RESOURCES:

Description: Professional services for enhancement of Gulf Boulevard from State Road

on Clearwater Beach, south to Pass-A- Grille Beach. Improvements include relocation of aerial utility lines underground, construction of pedestrian cross walks, installation of decorative street lighting, common signage and landscaping. ————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————